Laserfiche WebLink
A 4 <br />ELEVA AON ABUTMENT 1 <br />N TS <br />f <br />r- " -[ PAM -MA I <br />n. f Bearing <br />SEC 77ON A — A <br />N TS <br />o",x . n 1 zr-" <br />ELEVA TION ABU7UENT 6 <br />N TS <br />1 " formed hole, <br />Yp- <br />�2"x12" Steel hopper <br />-noun ted on front face <br />vall of abutment <br />'ro vide cleanout <br />P elbow, typ. <br />114 "X3" s trap <br />plate (see Strap <br />Plate Detail) <br />Tc <br />00 <br />0 Typical Drainage Component Installation Sequence: <br />B <br />1 Install Components A B C and D <br />Il Weld all connections <br />111 Connect Component QC to ( with Component <br />0 <br />DRAINAGE PIPE SYSTEM SCHEMA 77C <br />10"0 x 0.155" WSPN <br />HOPPER DETAIL <br />N TS <br />IL Ranrinn <br />SEC77ON B — B <br />N TS <br />Legends: <br />A� Deck Drain, Type 0---2 <br />B Pre -Formed Bend <br />Pre -Fabricated "WYE" Branch <br />�D Straight pipe <br />QSleeve Coupler <br />No te: <br />Unless noted otherwise, all pipes shall have a minimum slope of <br />2% along direction of flow. <br />S7RAP PLA 7E DETAIL <br />N TS <br />#5 0 tc <br />1 1/2 " Exp. <br />polystyrene <br />concrete <br />i anchor <br />Front face of <br />abutment <br />135" WSPN <br />r 3" steel strap <br />B "0 x 0. 135 " WSPN <br />Bottom slab <br />11" formed hole <br />ADD177ONAL REINFORCEMENT <br />FOR 9 2? FORMED HOLE <br />N TS <br />RECORD DRAWIN <br />Corrections By- <br />No Changes B <br />Date 1� �. .._ <br />Any Perso ng i wh0how Verily <br />Notes: It inform n S 1 e rig a Site Of Work <br />1. The Contractor shall ' ubmit shop drawings to the Engineer for approval <br />of all drainage system components prior to fabrication and installation. <br />2. All connections shall be welded. Exposed portion of 6" steel pipe and <br />hooper shall be pointed the some color as the concrete. <br />INFORMATION CONFIDENTIAL: <br />DESIGNED BY <br />A. ABaEL- CARIM <br />Burlington Northern. Santa Fe <br />Railway Company <br />r] <br />y <br />40 <br />�q eROFE55/ <br />� <br />►�. ►41bd� �` <br />AH� <br />MAD ABDEL-KARIM <br />� r*� <br />Np. CD51�97 <br />D5 -3D- dZ �. <br />s�� CIVIL �� <br />eel OF CA�1FQ� <br />MARIPOSA ROAD GRADE SEPARATION <br />AND REALIGNMENT <br />DRAINAGE DETAILS <br />CONTRACT NO. <br />All plans, drawings, specifi— <br />cations, and or mformotivn <br />furnished herewith of <br />remain the property of the <br />Burlington Northern Santa <br />Fe Railway Company and <br />shall be held confidential; <br />and shall not be used for <br />any purpose not provided <br />for in agreements with the <br />Burlington Northern <br />Fe rCompanySanta <br />DRAWING NO. <br />ST -16 <br />DRAWN 8Y <br />C. LEE <br />CHECKED BY <br />0. BROWN <br />REV1510N <br />SHEET NO. <br />4� of 51 <br />�rr�r R. H'r�s� Inc,Exp. <br />601 University Avenue, Suite 274 <br />Sacramento, Coiifornia 95825 <br />FiAR <br />APPROVED BY <br />A. BOONE <br />SCALE <br />AS SHAWN <br />DATE <br />SEPTEMBER 13, 2001 <br />REV. <br />DATE <br />DESCRIPTION <br />BY <br />Sue_ <br />APP. <br />