Laserfiche WebLink
ELECTRICAL GENERAL NOTES <br />1. THESE PLANS ARE HEREBY MADE PART OF THE CONTRACT SPECIFICATIONS FOR THIS PROJECT. <br />2. ALL ELECTRICAL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF STOCKTON, DEPARTMENT <br />OF PUBLIC WORKS, STANDARD SPECIFICATIONS AND THE LATEST VERSION OF THE STATE OF <br />CALIFORNIA, DEPARTMENT OF TRANSPORTATION STANDARD PLANS AND SPECIFICATIONS WITH THE <br />EXCEPTION OF METRIC UNITS; WHEREAS, THE 1992 VERSION (ENGLISH UNITS) SHALL BE FOLLOWED IN <br />SOFAR AS THE SAME MAY APPLY. <br />3. POLES, PULL BOXES, DETECTOR HAND HOLES, INDUCTIVE LOOPS AND CONTROLLER CABINET LOCATIONS <br />SHALL BE LOCATED IN THE FIELD BY THE ENGINEER WITH THE APPROVAL OF THE CITY TRAFFIC <br />ENGINEER. TYPICALLY, DETECTOR HANDHOLES SHOULD BE INSTALLED ON LANE LINES. <br />4. CONTRACTOR SHALL DELIVER NEW CONTROLLER CABINET AND SERVICE CABINET, AT LEAST TWO(2) <br />WEEKS IN ADVANCE OF THE INSTALLATION FOR TESTING, TO THE CITY OF STOCKTON CORPORATION <br />YARD AT 1465 SOUTH LINCOLN STREET, STOCKTON, CALIFORNIA, 95206, CONTRACTOR SHALL NOTIFY <br />THE CORPORATION YARD, DENNIS KONG AT (209)937-8534, A MINIMUM OF 72 HOURS IN ADVANCE OF <br />DELIVERY. <br />5. CONTRACTOR SHALL RETURN ALL EXISTING AND SALVAGEABLE EQUIPMENT AND SIGNS TO THE CITY OF <br />STOCKTON CORPORATION YARD AND SHALL NOTIFY THE CORPORATION YARD A MINIMUM OF 72 HOURS <br />IN ADVANCE OF DELIVERY. <br />6. CONTRACTOR SHALL BACK FILL WITH CUTBACK EACH NIGHT AT ANY AREAS NOT COMPLETED TO ITS <br />FINISHED STATE. ALL EXCAVATED AREAS SHALL BE PROTECTED FROM PEDESTRIAN AND VEHICULAR <br />TRAFFIC AT ALL TIMES. <br />7. ALL PULL BOXES SHALL BE STATE STANDARD NUMBER 5 UNLESS OTHERWISE NOTED ON PLAN. <br />8. THE CONTRACTOR SHALL BE RESPONSIBLE TO NOTIFY PG&E AND OTHER UTILITY COMPANIES PRIOR TO <br />START OF WORK. THE CONTRACTOR SHALL CALL USA (800-227-2600) 48 HOURS PRIOR TO ANY <br />EXCAVATION. <br />9. CONDUITS RUNNING FROM PULL BOX TO HANDHOLE SHALL BE A MINIMUM 2" DIA. UNLESS OTHERWISE <br />NOTED. <br />10. THE CONTRACTOR SHALL CONTACT THE CITY OF STOCKTON FOR A PRE -CONSTRUCTION CONFERENCE <br />AFTER THE AWARD OF CONTRACT AND AT LEAST 72 HOURS IN ADVANCE OF WORK. <br />19. THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE 27. ATTENTION IS CALLED TO: SECTION 1540(A) (1) OF THE CONSTRUCTION SAFETY ORDERS (TITLE 8 <br />COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS CALIFORNIA ADMINISTRATION CODE SECTION 1540), ISSUED BY THE OCCUPATIONAL SAFETY AND HEALTH <br />REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE STANDARDS BOARD PURSUANT TO THE CALIFORNIA OCCUPATIONAL SAFETY AND HEALTH ACT OF 1973, <br />CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND ENGINEER HARMLESS FROM ANY AND AS AMENDED, WHICH STATES: <br />ALL LIABILITY, REAL OR ALLEGED IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, "PRIOR TO OPENING AN EXCAVATION, EFFORT SHALL BE MADE TO DETERMINE WHETHER <br />EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR ENGINEER. UNDERGROUND INSTALLATION I.E., SEWER, WATER, FUEL, ELECTRIC LINES, ETC., WILL BE <br />20. THE CONTRACTOR SHALL MAKE AN ON-SITE INSPECTION PRIOR TO PROVIDING ANY BIDS TO DETERMINE ANY ENCOUNTERED AND, IF SO, WHETHER SUCH UNDERGROUND INSTALLATIONS ARE LOCATED. WHEN <br />AND ALL ITEMS NECESSARY TO PERFORM A COMPLETE AND ACCEPTABLE JOB. THE EXCAVATION APPROACHES THE APPROXIMATE LOCATION OF SUCH AN INSTALLATION, THE <br />EXACT LOCATION SHALL BE DETERMINED BY CAREFUL PROBING OR HAND DIGGING AND WHEN IT <br />21. THE LOCATIONS OF ALL UNDERGROUND FACILITIES SHOWN ON THIS PLAN ARE APPROXIMATE. A REASONABLE IS UNCOVERED, ADEQUATE PROTECTION SHALL BE PROVIDED FOR THE EXISTING INSTALLATION. <br />EFFORT HAS BEEN MADE TO LOCATE AND DELINEATE ALL UNDERGROUND FACILITIES; HOWEVER, Y&C ALL KNOWN OWNERS OF UNDERGROUND FACILITIES IN THE AREA CONCERNED SHALL BE <br />TRANSPORTATION CONSULTANTS, INC. ASSUMES NO LIABILITY FOR THE ACCURACY OR COMPLETENESS OF THE ADVISED OF PROPOSED WORK AT LEAST 48 HOURS PRIOR TO THE START OF ACTUAL <br />EXISTING FACILITIES SHOWN HEREON OR FOR THE EXISTENCE OF OTHER UNDERGROUND UTILITIES OR OBJECTS EXCAVATION." <br />WHICH MAY BE DISCOVERED BUT ARE NOT SHOWN ON THESE PLANS. THE CONTRACTOR SHALL VERIFY THE <br />LOCATION OF ALL EXISTING FACILITIES AND IMMEDIATELY NOTIFY THE ENGINEER IF ANY SUCH FACILITIES PROJECT NOTES, <br />INTERFERE WITH THE CONSTRUCTION OF IMPROVEMENTS. CALL U.S.A. 1-800-227-2600. THE CONTRACTOR <br />SHALL STOP WORK AROUND THE AREA OF CONFLICT UNTIL HE IS DIRECTED BY THE ENGINEER TO CONTINUE. ❑1 FURNISH AND INSTALL 90 CONTROLLER IN TYPE P CABINET. SEE THE SPECIAL PROVISIONS FOR <br />DETAILS. FRONT DOOR SHALL FACE SOUTH. <br />22. CONDUIT ROUTING SHOWN IS ESSENTIALLY DIAGRAMMATIC. CONTRACTOR SHALL LAYOUT RUNS TO SUIT FIELD <br />CONDITIONS AND THE COORDINATION REQUIREMENTS OF UTILITIES OR ANY OTHER TRADES, AND TO THE ❑ FURNISH AND INSTALL TYPE III -AF SERVICE EQUIPMENT ENCLOSURE. SEE SERVICE WIRING DIAGRAM <br />SATISFACTION OF THE CITY OF STOCKTON. UPON COMPLETION OF CONDUIT INSTALLATION, THE ACTUAL ON SHEET SP -02. FRONT DOOR SHALL FACE SOUTH. <br />LOCATION OF THE CONDUITS SHALL BE NOTED ON AN AS -BUILT SET OF PRINTS AND FURNISHED TO THE CITY. <br />23. CONTRACTOR SHALL INSTALL TYPE V PHOTO ELECTRIC CONTROL UNIT IN SERVICE CABINET. 2"C, 2#8 (FLASHING BEACON). <br />24. ALL VEHICLE SIGNAL INDICATIONS SHALL BE 12 INCH. ALL SIGNAL HEADS SHALL HAVE VENTILATED BACK ® 2"C, 2#8 (FLASHING BEACON), 1 DLC. ` <br />PLATES. <br />2"C, 2#8 (FLASHING BEACON), 2 DLC. <br />25. THE CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE STATE WATER RESOURCES CONTROL BOARD ® 2"C, 1 DLC. <br />(SWRCB) ORDER NO. 92-08-DWQ. THE CONTRACTOR SHALL IMPLEMENT AND MONITOR A STORM WATER <br />POLLUTION PREVENTION PLAN IN ACCORDANCE WITH THE SWCRB REGULATIONS. ❑7 2"C, 2 DLC. <br />26. THE CONTRACTOR SHALL NOTIFY THE CITY OF STOCKTON CORPORATION YARD (SIGNAL SHOP) AT (209)® 2"C, 3#1 (SERVICE). <br />937-8543 A MINIMUM OF 72 HOURS IN ADVANCE OF THE LAY OUT AND CUTTING OF TRAFFIC SIGNAL <br />DETECTOR LOOPS. f ® 2"C, 3#8 (CONTROLLER POWER), 4#8 (SIGNAL LIGHTING), 4#8 (FLASH BEACON), 3#14 (BACK-UP <br />18 1 PEC).i <br />11. LABEL PEDESTRIAN AND SIGNAL COMMONS SEPARATELY IN THE CONTROLLER CABINET. PG&E OVERHEAD TRANSFORMER 12024OV 1fl 1101 2%-C, 1#8, 1 PULL ROPEtFUTURE FIBER OPTI � � I <br />(INSTALLED BY OTHER} in 1AT <br />12. FLASHING INDICATIONS SHALL FLASH IN RED. 11 CONSTRUCT A.C. DIKE. SEE DETAILS ON DRAWING NO. D-02. u ` <br />LOADING: ±3000W(120V) TRAFFIC SIGNAL (METERED) ❑ <br />13. CONTRACTOR SHALL, BY HAND, POTHOLE EXISTING UTILITIES TO VERIFY LOCATION PRIOR TO 2-20OW(120V) FLASH BEACON (METERED) 12 CONTRACTOR SHALL USE CAUTION TO TRENCH AND SAWCUT DETECTOR LOOPS OVER THE CULVERT. <br />CONSTRUCTION 4 20OW(24OV) HPS LUMINAIRE (UNMETERED) ' 18 ❑ <br />14. ALL NEW VEHICLE SIGNAL AND PEDESTRIAN SIGNAL INDICATIONS SHALL BE LED DISPLAY. <br />15. THESE PLANS SHALL BE ACCOMPANIED BY SEPARATE SET OF SPECIAL PROVISIONS. <br />16. THE CONTRACTOR SHALL NOT PROCEED WITH ANY WORK CALLED FOR ON THESE PLANS UNTIL THE <br />CITY ENGINEER'S SIGNATURE OF APPROVAL IS AFFIXED HEREON AND ALL APPLICABLE PERMITS HAVE <br />BEEN OBTAINED. AN APPROVED SET OF PLANS SHALL BE ON THE JOB SITE DURING ANY <br />CONSTRUCTION. <br />O 13 2"C, 2#8 FLASHING BEACON), 3 DLC. 3 & <br />20 21 r1 20' <br />ok <br />14 INSTALL 3 -SECTION SIGNAL HEAD. SEE DETAIL A ON DRAWING NO. SP -02. �a r' <br />10 CO 15 INSTALL 4 -SECTION SIGNAL HEAD. SEE DETAIL B ON DRAWING NO. SP -0 <br />s \ J <br />1fi SEE DRAWING NO. AR -01 FOR CONTINUATION. <br />12 - 3 <br />,$ DH RE��R D � <br />17. ALL DETECTOR HANDHOLES SHALL BE TYPE B, (TRAFFIC RATED). �� Corrections ey <br />18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPORTING ALL CONFLICTS, ERRORS, OMISSIONS, ETC. <br />TO THE ENGINEER IMMEDIATELY UPON DISCOVERY. IF SO DIRECTED BY THE ENGINEER, THE CONTRACTOR <br />SHALL STOP WORK UNTIL REMEDIAL ACTION CAN BE TAKEN. ANY COSTS RESULTING FROM THE <br />CONTRACTOR'S FAILURE TO REPORT OR FAILURE TO STOP WORK AS DIRECTED WILL BE THE <br />RESPONSIBILITY OF THE CONTRACTOR. <br />PROPOSED TRAFFIC PHASE DIAGRAM <br />20' 11 <br />\ ��TMU17- N� 3F:) <br />7(0) S7;1 r . <br />±90'. <br />----- &±130' <br />L <br />a <br />22 <br />G7-1(Austin Rd) <br />7 BACK-UP PEC0 <br />- <br />lff� SAMPLER DH <br />SAMPLER 25' TO <br />RETURN <br />5 <br />1A <br />1-770� <br />R34-2 <br />Q� <br />041 <br />x <br />02 <br />DH <br />30111 <br />02 ! <br />15+00 a C' MR--L.INE <br />_I <br />'-R61-20.1 <br />R961(Mariposa Rd) <br />THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY <br />No Changes <br />Date ' <br />Any Person sing, is Drawing Should Verify <br />All information By inspecting The Site Of Wo6_ <br />D <br />01 <br />6 x10 - <br />G7-1(Austin Rd <br />. <br />O2 � 5 <br />DELAY <br />73-3 <br />OTO <br />/NOSE F MEDIAN <br />SPMP LER <br />DH 17 <br />iR96 <br />O s <br />D <br />_ <br />DH <br />4 � 6'x10'111 = p <br />Sp J 4 <br />INSTALL TYPE B DETECTOR HANDHOLE. SEE DETAIL C <br />ON DRAWING NO. SP -02. <br />OpD 18 INSTALL NO <br />INTERCONNECT PULL BOX. S€€ DETAIL F <br />5R ON DRAWING NO. SP -03. <br />O <br />PQ►�Q 19 INSTALL 2"C, 10, 1 PULL ROPE (FUTURE FIBER OPTIC <br />M CABLE). SEE DETAIL G ON DRAWING NO. SP -03. <br />20 PLACE 2" RIGID HOT DIPPED GALVANIZED CONDUIT AND <br />RAISER. RISE UP POLE 12' AND PLACE A PULL ROPE <br />IN CONDUIT AND RAISER PER PG&E REQUIREMENT. <br />THE CONTRACTOR SHALL COORDINATE WITH PG&E, <br />STEVE OKANOTO AT (209)942-1494, FOR SERVICE <br />CONNECTION. <br />r221 CONSTRUCT CONTROLLER WALKWAY PER DETAIL H ON <br />DRAWING NO. SP -03. <br />±110' <br />±90 J. <br />INFORMATION CONFIDENTIAL: DESIGNED BY CONTRACT NO. <br />All plans, drawings, information <br />KIN Y. CHAN Burlin ton Northerrn Santa Fe o e��F�S��"�` MARIPOSA ROAD GRADE SEPARATION <br />cations, and or information ❑RAWN BY � ��� �yG' DRAWING N0. <br />furnished herewith shall SP -01 <br />remain the property of the STEVE W. LEU N G Railway Company � KIN Y. CHAN AND REALIGNMENT <br />Burlington Northern Santa CHECKED BY w <br />Fe Railway Company and oC No. 5`5391 REVISION SHEET N0. <br />shall be held confidential: K. DANIEL YAU <br />and shallbe used for APPROVED BY Y & C Transportation Consultants, Inc. E 1X31 * TRAFFIC SIGNAL INSTALLATION P LAN 25 OF 51 <br />any purposea net provided <br />for in agreements with the A. B°ONE SCALE <br />Burlington Northern Santa DATE 1851 H e r i t o g e L a n e, Suite 265 qT , <br />REV. DATE DESCRIPTION Yr SUB 18 �1 <br />APP. Fe Railway company. SEPTEMBER 18, 2001 Sacramento, CA 95815 Ph. (916)564-9626 Fax. (916}564-9643 F OF CA��F° 1 =20 <br />04 <br />01 <br />X02 <br />06 <br />06 -10- <br />PROPOSED TRAFFIC PHASE DIAGRAM <br />20' 11 <br />\ ��TMU17- N� 3F:) <br />7(0) S7;1 r . <br />±90'. <br />----- &±130' <br />L <br />a <br />22 <br />G7-1(Austin Rd) <br />7 BACK-UP PEC0 <br />- <br />lff� SAMPLER DH <br />SAMPLER 25' TO <br />RETURN <br />5 <br />1A <br />1-770� <br />R34-2 <br />Q� <br />041 <br />x <br />02 <br />DH <br />30111 <br />02 ! <br />15+00 a C' MR--L.INE <br />_I <br />'-R61-20.1 <br />R961(Mariposa Rd) <br />THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY <br />No Changes <br />Date ' <br />Any Person sing, is Drawing Should Verify <br />All information By inspecting The Site Of Wo6_ <br />D <br />01 <br />6 x10 - <br />G7-1(Austin Rd <br />. <br />O2 � 5 <br />DELAY <br />73-3 <br />OTO <br />/NOSE F MEDIAN <br />SPMP LER <br />DH 17 <br />iR96 <br />O s <br />D <br />_ <br />DH <br />4 � 6'x10'111 = p <br />Sp J 4 <br />INSTALL TYPE B DETECTOR HANDHOLE. SEE DETAIL C <br />ON DRAWING NO. SP -02. <br />OpD 18 INSTALL NO <br />INTERCONNECT PULL BOX. S€€ DETAIL F <br />5R ON DRAWING NO. SP -03. <br />O <br />PQ►�Q 19 INSTALL 2"C, 10, 1 PULL ROPE (FUTURE FIBER OPTIC <br />M CABLE). SEE DETAIL G ON DRAWING NO. SP -03. <br />20 PLACE 2" RIGID HOT DIPPED GALVANIZED CONDUIT AND <br />RAISER. RISE UP POLE 12' AND PLACE A PULL ROPE <br />IN CONDUIT AND RAISER PER PG&E REQUIREMENT. <br />THE CONTRACTOR SHALL COORDINATE WITH PG&E, <br />STEVE OKANOTO AT (209)942-1494, FOR SERVICE <br />CONNECTION. <br />r221 CONSTRUCT CONTROLLER WALKWAY PER DETAIL H ON <br />DRAWING NO. SP -03. <br />±110' <br />±90 J. <br />INFORMATION CONFIDENTIAL: DESIGNED BY CONTRACT NO. <br />All plans, drawings, information <br />KIN Y. CHAN Burlin ton Northerrn Santa Fe o e��F�S��"�` MARIPOSA ROAD GRADE SEPARATION <br />cations, and or information ❑RAWN BY � ��� �yG' DRAWING N0. <br />furnished herewith shall SP -01 <br />remain the property of the STEVE W. LEU N G Railway Company � KIN Y. CHAN AND REALIGNMENT <br />Burlington Northern Santa CHECKED BY w <br />Fe Railway Company and oC No. 5`5391 REVISION SHEET N0. <br />shall be held confidential: K. DANIEL YAU <br />and shallbe used for APPROVED BY Y & C Transportation Consultants, Inc. E 1X31 * TRAFFIC SIGNAL INSTALLATION P LAN 25 OF 51 <br />any purposea net provided <br />for in agreements with the A. B°ONE SCALE <br />Burlington Northern Santa DATE 1851 H e r i t o g e L a n e, Suite 265 qT , <br />REV. DATE DESCRIPTION Yr SUB 18 �1 <br />APP. Fe Railway company. SEPTEMBER 18, 2001 Sacramento, CA 95815 Ph. (916)564-9626 Fax. (916}564-9643 F OF CA��F° 1 =20 <br />