Laserfiche WebLink
JOB STORY: <br />PER N1NY, PGE TO INSTALL 120V ELECTRIC <br />SVC DROP IN 1/2" CONDUIT TERMINATING <br />IN POLE-MOUNTED RECTIFIER. <br />GAS RECTIFIER TO BE USED: JA ELECTRONICS <br />40V DC / 10A DC. <br />VOLTAGE & LOAD REQUIREMENTS: 120V / <br />3600W <br />PG&E CONSTRUCTION NOTES <br />LOC 1: <br />REMOVE POLE (UNKNOWN <br />SIZE/CLASS/PLDBID. INSTALLED MAYBE 1965 <br />PER GM429711) <br />INSTALL 35' CLASS 5 POLE, 2- #10 AWG SVC <br />CABLE (31') IN 1-1/2" RISER (30'). <br />TRANSFER 1-6A DPX OH SVC CABLE & <br />STREETLIGHT. <br />REQUIRED PERMITS