My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
L863 - L950
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer L
>
L782 thru
>
L863 - L950
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2024 12:41:40 PM
Creation date
11/22/2024 1:48:07 PM
Metadata
Fields
Template:
Large Plans - LP
Project
Lower Sacramento Road Improvements
Limits
Eight Mile Road to South of Harney Curve
Year
2014
Project Engineer
R. Yoshimura
Roads Worked
Lower Sacramento Rd.
Red Lines
Yes
Supplemental fields
Classification
Cross Ref
L863 - L950
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LEGEND: <br />a <br />n <br />N <br />O <br />d <br />I <br />N <br />(O <br />Y <br />I <br />LU <br />W <br />W <br />in <br />I <br />a <br />N <br />V1 <br />N <br />i <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />J <br />I <br />-I( <br />04 <br />N <br />F <br />PROJECT NOTES ,THIS SHEET ONLY <br />1❑ INSTALL NEW TRAFFIC SIGNAL CONTROLLER MODEL 2070 ASSEMBLY <br />WITH MODEL 332 CABINET. THE TRAFFIC SIGNAL CONTROLLER, CABINET AND <br />FOUNDATION SHALL BE INSTALLED PER THE 2006 CALIFORNIA DEPARTMENT <br />OF TRANSPORTATION (CALTRANS) STANDARDS. FRONT DOOR OF TRAFFIC <br />CONTROLLER CABINET SHALL FACE SOUTH. THE TRAFFIC CONTROLLER <br />CABINET SHALL BE SET UP TO HAVE AN ADDITIONAL SIDE MOUNTED CABINET <br />TO ACCOMMODATE THE BATTERY BACKUP SYSTEM. THE BATTERY BACKUP <br />SYSTEMS SHALL MEET THE CALTRANS STANDARD SPECIFICATION. IT IS THE <br />RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE HOOKUP AND INSPECTION <br />FOR SERVICE. <br />0 CONTRACTOR SHALL FURNISH AND INSTALL TYPE III—AF SIGNAL AND <br />LIGHTING SERVICE CABINET, PER CALTRANS AND PG&E COMPANY REQUIREMENTS <br />AND STANDARDS. VERIFY SERVICE LOCATION REQUIREMENT WITH PG&E COMPANY. <br />❑3 FURNISH AND INSTALL NEW 2" CONDUIT AND CONDUCTORS AS SHOWN. <br />4. LOOP DETECTOR SHALL BE INSTALLED PRIOR TO FINAL PAVEMENT LIFT. <br />5. CONTRACTOR SHALL CONTACT SAN JOAQUIN COUNTY TRANSPORTATION DIVISION <br />(209)468-3035, 72 HOURS PRIOR TO SIGNAL ACTIVATION. <br />6. CONTRACTOR SHALL CONTACT CHP TO INFORM OF SIGNAL ACTIVATION. <br />R/W — I I/W <br />71 <br />02-1 <br />212'U <br />02-2 <br />..................... <br />312"C, 2DLC <br />3 2 "C, *6# 10 <br />R W — <br />405' TO <br />LIMIT LINE <br />R/W <br />DRAWN BY DATE <br />14 PROJECT ENGINEER DATE CHECKED DATEAH <br />fle <br />X 6/14 L. PHAM 6/ 14 M. JIM 6/ 14 N NS O SL ISCTALE IS Do LING ADJUST <br />SCALED D <br />2 "C, 2 # 6 —/D—/ <br />D3 (LOWER SACRAMENTO <br />R1 <br />01 <br />0 <br />' OWN— VEHICLE SIGNAL FACE <br />PULL BOX <br />PULL BOX WITH TAMPER PROOF BOLT <br />REINFORCED PULL BOX WITH TAMPER PROOF BOLT <br />LUMINAIRE <br />® CONTROLLER ASSEMBLY <br />p SERVICE EQUIPMENT ENCLOSURE <br />�—► EMERGENCY VEHICLE PRE—EMPTION DETECTOR <br />C=16 No.6 PULL BOX <br />• <br />DETECTOR MANHOLE <br />® <br />ABANDON FACILITY <br />® <br />REMOVE AND RELOCATE <br />® <br />REMOVE AND SALVAGE <br />® <br />INSTALL CONDUIT IN EXISTING PULL BOX <br />® <br />INSTALL PULLBOX IN EXISTING CONDUIT RUN <br />® <br />DETECTOR HANDHOLE <br />E _ :3 <br />VIDEO DETECTION ZONE <br />TYPE A LOOP DETECTOR <br />® <br />TYPE D LOOP DETECTOR <br />R10-12 <br />R3-4 D3 (LO ER SACRAMENTO RD) <br />03I "C, 5DL ,I 6 #10 2"C, 2DLC, 6 10 E <br />r <br />ZC' 2DLC, 6# 10 — 2"C, 2DLC, _6# 10 <br />v 3 2"C, 2DLC, 6#10 -- <br />`— R73-2(CA) <br />sat EV(A) <br />02 <br />2 C, 2#10 02` <br />04 04 04 <br />08-3 <br />EV(B <br />/ <br />I, <br />I <br />ir <br />W <br />J <br />t` <br />t` <br />W <br />COUNTY OF SAN JOAQUIN <br />w <br />O J <br />Lo <br />2 "C, 1 D LC 00 <br />08-1 <br />8J6U <br />SCALE: 1 "=20' <br />0 10 20 40 <br />` D3 (METTLER RD) <br />O <br />LOWER SACRAMENTO ROAD <br />"LSR" LINE 78+nn <br />R/W <br />405' TO <br />LIMIT LINE <br />3 2"C, 2DLC, 3#10 <br />3 2 C, 3# 10 <br />' 06-2 <br />6J2U <br />\E1 06-1 <br />81 +00 <br />R/W <br />06 <br />08 <br />soy � so 1 —sob <br />01 05 02 <br />04 <br />—j <br />02 <br />PROPOSED PHASE DIAGRAM <br />EV(A)=02+05 <br />EV(B)=04 <br />EV(C)=sot +06 <br />EV(D)=08 <br />685' TO <br />LIMIT LINE <br />CONTACT SAN JOAQUINE=9 <br />COUNTY TRANSPORTATION DIVISION 3 DAYS <br />PRIOR TO ANY TIMING ADJUSTMENT <br />ON SIGNAL (209-468-3707) <br />PALFroom <br />M I I ••� <br />A, <br />FiCtIMHOFT <br />W —KW JIM . �, <br />DEPARTMENT OF PUBLIC <br />WORKS <br />LENTO, <br />�• P 06-30-199� * <br />SAN JOAQUIN COUNTY, CALIFORNIA <br />SACRAMENTO, CALIFORNIAOoksDrive <br />SACRAMENTO, AL/P95833 <br />Te%: 916-567-2500 <br />.• CIVIL •: <br />Fax 916-925-3517••rc•••••'• <br />M <br />SIGNAL AND LIGHTING <br />LOWER SACRAMENTO ROAD IMPROVEMENTS <br />SHEET <br />TOTAL E�s <br />METTLER RD/LOWER SACRAMENTO RD <br />EIGHT <br />MILE <br />ROAD <br />TO SOUTH <br />OF <br />HARNEY <br />CURVE <br />83 <br />87 <br />
The URL can be used to link to this page
Your browser does not support the video tag.