Laserfiche WebLink
cj�i <br />a <br />E E <br />W <br />—i <br />J <br />i--- <br />3 C? <br />LJ <br />I <br />c <br />LOWER SACRAMENTO ROAD <br />LOWER SACRAMENTO ROAD <br />FOR GENERAL NOTES, TYPICAL DETAILS, AND LEGEND SEE SHEET CS-1 <br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE �» » > <br />A. MacGREGOR 6/14 COUNTY OF SAN JOAQUIN SCALE: 1 =300 <br />R. TORADO 6/14 R. YOSHIMURA 6/14 C. K. HOLT 6/14 ON DIMENSIONS IFCALE TH S DOESINNOTDJUST SCALESATL1" O 300 600 <br />No <br />STAGE 2 NOTES <br />1. CONTRACTOR SHALL COORDINATE WITH W.I.D. DURING STAGE 2 CONSTRUCTION AND ALLOW THEM TO ACCESS THE CONSTRUCTION <br />SITE FOR THEIR REMOVAL AND INSTALLATION OF THE WESTERN PORTION OF THE PIXLEY LATERAL IMPROVEMENTS. <br />2. CONTRACTOR SHALL BE RESPONSIBLE FOR WATER POLLUTION CONTROL AT ALL TIMES DURING CONSTRUCTION, INCLUDING THE <br />DURATION OF W.I.D. OCCUPATION OF THE PROJECT SITE. <br />STAGE 2 <br />VEHICULAR TRAFFIC <br />SHIFT TRAFFIC TO NEW LANES ON EAST SIDE OF LOWER SACRAMENTO ROAD FROM PIXLEY SLOUGH TO "LSR" STA 100+00. <br />TRANSITION TRAFFIC FROM EAST TO WEST "LSR" STA 100+00 to 110+00. <br />SHIFT TRAFFIC TO NEW LANES ON WEST SIDE OF LOWER SACRAMENTO ROAD FROM "LSR" STA 110+00 TO END OF CONSTRUCTION. <br />MAINTAIN ONE 11' MINIMUM LANE IN EACH DIRECTION ON LOWER SACRAMENTO ROAD, EXCEPT AS NOTED. <br />REDUCE TO ONE LANE USING FLAGGERS TO COMPLETE WORK AT LOWER SACRAMENTO ROAD STA 148+00 to 151 +00. WORK SHALL <br />BE COMPLETED DURING OFF PEAK HOURS. PEAK HOURS ARE MONDAY THROUGH FRIDAY 7-9 AM AND 4-6 PM, AND SUNDAY <br />8:30-1 1:30 AM. <br />CONSTRUCTION <br />1. PREPARE SUBGRADE. <br />2. DEMOLISH PORTION OF KETTLEMAN SLOUGH STRUCTURE AND CONSTRUCT PORTION OF STORM DRAINAGE SYSTEM. <br />TEMPORARY CONNECTION BETWEEN NEW AND EXISTING REQUIRED. <br />3. W.I.D. TO COMPLETE PIXLEY LATERAL IMPROVEMENTS INCLUDING REMOVAL OF EXISTING FACILITIES NORTH OF <br />KETTLEMAN SLOUGH AND CONSTRUCTION OF NEW FACILITIES SOUTH OF KETTLEMAN SLOUGH. <br />4. CONSTRUCT DRAINAGE DITCHES, DRIVEWAYS, CULVERTS AND PORTIONS OF SIGNALS AT METTLER ROAD AND <br />ARMSTRONG ROAD. <br />5. PLACE AB AND PAVEMENT. <br />6. RELOCATE EXISTING TRAFFIC SIGNALS AT THE INTERSECTION OF LOWER SACRAMENTO ROAD AND ARMSTRONG ROAD <br />TO ACCOMMODATE STAGE 3 CONSTRUCTION. SEE SIGNAL PLANS FOR TEMPORARY LOCATION. <br />7. STRIPE LOWER SACRAMENTO ROAD FOR STAGE 3 CONSTRUCTION. <br />2329 Goteway Oaks Drive <br />SACRAMENTO, CAL/FORN/A 9583.3 <br />Teie: 916-567-2500 <br />Fax 916-925-,3517 <br />CONSTRUCTION STAGE 2 <br />ADDENDUM #2 — DESIGN REVISIONS <br />CS=7 <br />DATE: 7/24/14 <br />• <br />Flol`r " �N DEPARTMENT OF PUBLIC WORKS <br />No. C 30/1 SAN JOA UIN COUNTY P. Q CALIFORNIA <br />'• Ex 06/30/16 •� <br />* CIVIL <br />'CCOT <br />TOTAL <br />LOWER SACRAMENTO ROAD IMPROVEMENTS SNE. SHEETS <br />EIGHT MILE ROAD TO SOUTH OF HARNEY CURVE 48A 87 <br />I <br />