My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
L863 - L950
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer L
>
L782 thru
>
L863 - L950
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2024 12:41:40 PM
Creation date
11/22/2024 1:48:07 PM
Metadata
Fields
Template:
Large Plans - LP
Project
Lower Sacramento Road Improvements
Limits
Eight Mile Road to South of Harney Curve
Year
2014
Project Engineer
R. Yoshimura
Roads Worked
Lower Sacramento Rd.
Red Lines
Yes
Supplemental fields
Classification
Cross Ref
L863 - L950
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
z <br />0 <br />z <br />F- <br />(/) z <br />0 <br />F- <br />LLI (D <br />z <br />F <br />V) <br /><��zz <br />0 <br />F- <br />V) <br />LLI <br />cr <br />F- <br />0 <br />Z <br />LLI <br />Ld <br />z <br />0LL. z <br />91 Z C-0 <br />IZ c) <br />- O(1) �- <br />01r") <br />12+00 <br />a <br />...... ...... ....... ...... ....... ...... ..... <br />TO "A" LINE <br />STA 10+00 R <br />15-1 <br />FLASHING BEACON <br />0 SIGN W3-3 TO BE RESET TO NEW <br />POST W/ FLASHING BEACON, SEE <br />SIGNAL AND LIGHTING PLANS <br />DRAWN BY <br />A. MacGREGOR <br />R. TORADO <br />L' <br />LL <br />"M" 5+00.00 <br />0 + <br />LSR- 75+97.00 <br />15+00 <br />0 <br />I-- <br />z <br />LLJ LLI <br />:2 z <br />< <br />li <br />Of <br />cn <br />0 <br />FOR DETAILS ON LOWER <br />SACRAMENTO ROAD, <br />SEE <br />PD-7 <br />DATE_ PROJECT ENGINEER DATE <br />6/14 6/14 R. YOSHIMURA 6/14 <br />0) <br />LO <br />+1 <br />00 <br />LO <br />LO <br />+11 <br />CHECKED <br />C. K. HOLT <br />z <br />0 <br />F— <br />V) <br />z <br />w <br />g <br />z <br />N <br />0 w <br />M <br />......... . . <br />22 <br />12' <br />6+00 <br />ij 12' <br />+1 <br />0 <br />0 <br />(D <br />"A" 1 A-L.Qr, nf) <br />it � it . .. — <br />LL <br />uj <br />z <br />af <br />V) <br />(Ex <br />15+00 <br />CN <br />+ <br />0 <br />FOR DETAILS ON LOWER SACRAMENTO ROAD, <br />SEE PID- 10 <br />ARMSTRONG ROAD <br />z <br />0 <br />F- <br />,-'(f) <br />w <br />,z <br />F- <br />IF- F- z <br />LLJ cl. <br />z <br />0 V) <br />o LL- <br />Zoo <br />0 Oz <br />+ (-) wz w <br />...... .... — ...... ...... ...... ...... <br />0.75'J p 700 09 a, As' i <br />tur <br />VIV <br />8+00 <br />15-2 <br />FLASHING BEACON <br />0 0 <br />SIGN W3-3 TO BE RESET TO 0 <br />NEW POST W/ FLASHING BEACON, TO "A" LINE <br />+ <br />ul . . . . ... ... ..... .... .. ..... SEE SIGNAL AND LIGHTING PLANS <br />.t STA 20+00 L <br />. . ............. <br />I 91, <br />4' <br />12' 16+00 <br />12' <br />4 <br />12' <br />17+00 <br />1 <br />12' <br />4' <br />. ... ....... <br />z <br />0 z <br />27B F- 0 <br />V) <br />z <br />IAJ z <br />F- <br />0 <br />U-1 F- z <br />z LAJ 0— <br />FE <br />Ofz <br />z u— <br />0 �— <br />V) <br />0 0 Z C) C) <br />0 14t 0 LJ Ozz <br />FLASHING BEACON <br />W3-3 W/ FLASHING BEACON, <br />SEE SIGNAL AND LIGHTING PLANS <br />:.- W / <br />.. ....................... . ......................... R ... .................... <br />PAVEMENT MARKING <br />"AHEAD" <br />...... ....... ....... ... .... ...... ---- -- ------ <br />0.5'J ... . . . . ....... ...... ...... ....... ...... . . ..... . - -- - ------ ...... - ..... ....... ...... ...... ....... ...... - .... ...... ...... ..... - - .... ...... .. <br />STRIPING LEGEND <br />12 BROKEN LANELINE (4" WHITE) <br />22 SOLID DOUBLE CENTERLINE (4" YELLOW) <br />25 SOLID EDGELINE (4" YELLOW) <br />SOLID EDGELINE (4" WHITE) <br />DATE 1 1. <br />.......... R, ................ ... .... . ........ . <br />Ln <br />01 15-3 <br />• SPECIAL SIGN <br />WARNING NEIGHBORHOOD WATCH <br />• SPECIAL SIGN <br />NO LITTERING OR DUMPING <br />SPECIAL SIGN <br />CAMERA ENFORCED <br />METTLER ROAD <br />29 SOLID DOUBLE MEDIAN ISLAND LINE (4- YELLOW) <br />38 SOLID CHANNELIZING LINE (8" WHITE) <br />LL LIMIT LINE (12" WHITE) <br />6/14 ON ORIGINAL S I CALE DRAWING ADJUST SCALED COUNTY OF SAN J O A Q U I N <br />DIMENSIONS IF THIS DOES NOT SCALE AT 1" <br />SCALE: 1 "=20' <br />0 10 20 40 <br />PAOrPOW <br />AwAr4clunmoff <br />2329 Gateway GoAns Drive <br />SACRAMENTO, CALIFORNIA 95833 <br />Tele: 915-567-2500 <br />Fax 916-925-3517 <br />'w <br />PAVEMENT DELINEATION & <br />SIGN PLANS <br />w <br />Z <br />too WWI: -: <br />PAVEMENT MARKING <br />"SIGNAL" <br />........................ /w ................. .......... I ............ <br />• R2-1 (35) <br />SPEED LIMIT 35 <br />L p <br />a:kslw <br />n <br />Y shim r"a DEPARTMENT OF PUBLIC WORKS <br />C 77483 <br />No. <br />06/30/15 <br />SAN JOAQUIN COUNTY, CALIFORNIA <br />CIVIL <br />% <br />V <br />TOTAL <br />LOWER SACRAMENTO ROAD IMPROVEMENTS SNO.HEET SHEETS <br />EIGHT MILE ROAD TO SOUTH OF HARNEY CURVE 74 87 <br />
The URL can be used to link to this page
Your browser does not support the video tag.