Laserfiche WebLink
I <br />i <br />GRAVE RD <br />. � p <br />z 4�' `�- <br />O f, <br />• Couniy. <br />S <br />RIPON CITY — <br />LIMITS <br />ZO'�T o <br />q� <br />. F� w <br />CITY OF MANTECA CITY OF <br />G �� RIPON <br />MANTECA CITY <br />LIMITS <br />i <br />Know whafs 1 elm <br />i Call811 before you dig. <br />.1 1 N 0 �/ MIN <br />NO SCALE <br />ECORD DRAWN(... <br />rectbna By <br />'. bwirw ihmw Vol* <br />oaf. O The 640 M <br />PROJECT ENGINEER DATE CHECKED <br />05/2024 r¢� <br />DATE ACCEPTED <br />05/2024 -lam <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />STOCKTON, CALIFORNIA <br />SOUTH 99 FRONTAGE ROAD <br />EAST RESURFACING 2024 <br />(Austin Road to Ripon City Limits) <br />To Be Supplemented by Standard Plans Dated 2023 <br />and Revised Standard Plans <br />COUNTY OF SAN JOAQUIN <br />Submitted MAY 7 2024 <br />NAJ E RI <br />DEPUTY DIRECTOR OF PUBLIC WORKS <br />INDEX OF SHEETS <br />SHEET <br />NO. <br />1 <br />TITLE PAGE <br />SHEET <br />NO. <br />2 <br />GENERAL NOTES AND TYPICAL SECTIONS <br />SHEET <br />NO. <br />3 <br />TYPICAL SECTIONS <br />SHEET <br />NO. <br />4-6 <br />PLAN <br />SHEET <br />NO. <br />7 <br />CONSTRUCTION DETAILS <br />SHEET <br />NO. <br />8 <br />SUMMARY OF QUANTITIES <br />THE STANDARD PLANS <br />APPLICABLE TO THIS CONTRACT <br />ARE INCLUDED <br />IN THE <br />PROJECT SPECIFICATIONS BOOK. <br />ABBREVIATIONS <br />(In addition to abbreviations shown on SP A3A, A313 & A3C and <br />Standard Specifications 1 —1.06 Abbreviations) <br />D = District (Supervisorial) <br />SJ Co Std = San Joaquin County Standard <br />SP = Standard Plans <br />TE = Tapered Edge <br />UPRR = Union Pacific Railroad <br />DATE <br />5/6/24 <br />l] <br />Z <br />a No. 76379 M <br />9T C(V 1\- <br />Q <br />� F OF CAS\F� \ <br />Jayna Rutz <br />RCE 76379 <br />Sheet No. <br />1 of 8 <br />