Laserfiche WebLink
T T1f'l T-M T IM <br />83MV8(1 <br />'ON 133HS <br />AT&T <br />MH <br />0 <br />(b,w,r,g) <br />Sto 225+92 (20' Lt.) <br />Install lighting standard. <br />o <br />3 <br />O <br />Existing right-of-way. <br />New edge of pavement. <br />Existing edge of pavement. <br />Existing fence to remain in place. <br />Electrical conduit & No. 5(T) pull box unless otherwise <br />shown on plans. 2" conduit except 2 Y2" service as shown. <br />Conductors as indicated. <br />Existing electrical line. <br />Existing overhead line. <br />Area of roadway widening. <br />Con st —� <br />Existing ditch/swale FL. -- - " <br />P / ----LOWER SACR QROAD--- _ <br />_ AME Proposed ditch swale FL - _ ._.-- _ _. _ _ _ _ N T -- <br />-- ..... - -- - -220 <br />- — - — - <br />Existing Kinder Morgan underground ` _ - 219 221 - <br />pipeline. (Approximate location) r- <br />Existing AT&T underground line. - _ -- --- _ - E -- - —-E-•-•-•-•-•-E- -E- <br />-- "1 <br />(Approximate location) _--" __. -, <br />Existing underground communucations. -1 - _•- "E 3-#10 (b,w,g) <br />(Approximate location) : - �' .1►- - - _-.E- (metered) - �• <br />Existing utility pole & guy anchor. <br />-- ti 3-#10 <br />Street YP P light Type 15 pole and 165 W. ,- - +r metered) <br />9 X Sta. 220+00 ( ) 30' Rt. SPEED R/W l� <br />LED luminaire with PEC. See S.P. ES-6A. ""- �. Y _ 6 <br />V Install radar speed LIMIT <br />�. <br />��{�► � feedback sign. <br />Existing AT&T maintenance hole. See detail on Sheet 10. _35-1 <br />Sta. 218+00 (30' Rt.) W1-4 YOUR SPEED <br />Type III-AF Service Equipment Enclosure. Flashing Beacon Type 1-A Pole <br />See S.P. ES-21). Omit items 9, 10, 11, and FBCA, ES-313, ES-7J. <br />12, 14, 18 thru 26. U ,'A o <br />Wire Black &0 Black, <br />Red White (Neutral), Red,re` (Ground BEGINNING OF PROJECT <br />Black & White = 120 V <br />RAH Ar white a 120 V <br />Sta. 228+60f 55 Lt. approximate location of boring. <br />-n - For detail and instruction on boring and installing 2" Dia. steel conduit, refer to UPRR <br />�_ Wireline Crossing Agreement. The agreement is attached in the back of the Special <br />t: f '.�,, f 9 9 9 P <br />L �` Provisions. This work shall be considered as included in the contract lump sum price <br />�•�'1� �2�+^ paid for electrical highway lighting, flashing beacon, and radar speed feedback sign <br />` t systems and no additional compensation will be allowed. <br />PG&E power point '. <br />Y�`U' <br />' 1 t <br />1 <br />IMi1pi {Wl�lll np�eiY�lly� N �.I!Hy�fYl :�, <br />225 - <br />3-i%8 (b,r,g) (unmetered) <br />3-#8 (b,r,g) (unmetered) r: 2-#10 (b,w) (metered) , <br />2-#10 (b,w) (metered) y _ <br />f' <br />Zr <br />' E- <br />(unmetered) 4 / - Sta 230+11 (19' Lt.) ° r" <br />. , <br />la <br />w F-E�, <br />• <br />Install lighting standard <br />on slope See detail on <br />J <br />C., `C <br />Sheet 10. , <br />3 #8 (b,r,g) <br />(unmetered)- <br />r <br />} - P House , , <br />___ _._ __ �-_ � � j�ee Pump Q ( r <br />- -. E - _ �` Service Power _ ed) <br />--- -- - - a - - F� unm er ) <br />- r <br />Connection <br />—_. <br />i <br />. VC., <br />e <br />Detail, <br />Sheet <br />1 - - 3 <br />lighting . r <br />-I <br />-C, <br />' � o • - -^- -P - . <br />--- -- __ <br />-_-- -- _ -.- <br />- l <br />rn. <br />#8 <br />E •(unm e(tbere ) - to 228+07 (17 Lt - <br />Install li htin sta <br />� <br />/ <br />— _ 2 2 7 In s of pe. See detai on- <br />- <br />`_ - - --- ----- -- Sheet <br />eet -10. - - .r2-_2_8226 <br />ra <br />_ LOWER <br />- —S A-C --R ------- _E NTO ROAD_ <br />_ - <br />� <br />229mztere b <br />(b ,9 metered") <br />) s 230 + i _ <br />Z = — - V <br />-—E�. <br />n <br />— D <br />Sta 231+18 <br />:T <br />3-#8 (b,r,g) y • -•-•-•_. ---- --- ----- j - ._• -•� Install lighting 2standard. <br />3-#10 ( w,9) (,unmetered) c� --E-.._. ,-• .-•--E <br />b' Sta 227+00 (18' Rt.) <br />(metered) Install lighting standard., 3_#g (b�ro9) y G <br />rin slope. See detail onSta 229+11 (17' Rt.) (unmetered) ,, CO R D D RAW1 N <br />Sheet 10. r' Install lighting standard <br />Corrections <br />on By <br />- on sloe See detail <br />_- --- _ _f- - __.iY <br />Additional pullbox needed <br />Sta. 224+00 Rt. not <br />shown on the plans. <br />3-#8 (b,r,g) (unmetered) <br />-2-#10 (b,w) (metered) <br />DRAWN BY DATE PROJECT ENGINEER <br />Enrique Silva 1113 <br />DRAWER SHEET NO. <br />1.5tp f <br />DATE <br />DATE <br />41 <br />L <br />CHECKED BY DATE <br />COUNTY OF <br />/713 <br />PCof <br />Sheet 10. NoChanges By <br />r v Date <br />Any Person Using This Drawing Should Verify <br />AN information By ftpectirg The Site Of Wort <br />�Qv?Qt°;RNq� oe�°;RS QR�R UNDERGROUND <br />r 0 r,/ F �' 0 <br />9sy 3�� SERVICE ALERT <br />W No. TR41 No. E6215 No. C27470 <br />~9j�.TRAFF� '��.�FCTR\,,� fqj�. CIV1� <br />OF CAS- OF CPS- OF CPS, <br />Uj <br />i., <br />_31Wilbur Elias Wilbur Elias Wilbur Elias <br />Registered Traffic Engineer Registered Electrical Engineer Registered Civil Engineer (811) <br />LOWER SAC RAM ENTO ROAD SAFETY IMPROVEMENTS SHEET TOTAL <br />SAN JOAQUIN SCALE: 1 20' LIGHTING PLAN (1,000' s/o Undercrossing to 600' n/o Collier Road) 6 SHEETS <br />6 11 <br />