Laserfiche WebLink
E , <br />-----COURT"cau/vrA y V/ffW elaV/V/5/,0AtAW -Pat <br />4 F <br />41 OV-0- lip ♦ e. # k } <br />/. tidy <br />A Baev av Aa.00 5a:0e f0.. 0 i 3a. Aa 50ov 50vo 10.a0 I. <br />Y fry fo3 faF IB3 �aa 107 Boa fos; fro . <br />�O O • o . a �.,p Et 0 I <br />h . <br />a 1Grt7. GA q 5 J ,' B 50. 00 ga, AA 3�9. <br />al WWII`' adw <br />oa rr �v aa� 5p.00 5o_ao: 3d1-5B 50.00 fi <br />d .Go o co <br />i <br />* 5 A-11 � 121 Isi <br />120 rr9 w n ll ' Q fly o rl6 m 1rs o 174 <br />_ 44.15 SSD.dO 50.00 III.C)(J !�6►.as '�vOCJ� �Aa� t <br />41, <br />Mtn •,` °s, o E a ` °' I�� ?, <br />iOo.aL"j l.:Its <br />0.00 gD.00 A0.00 1 5040 Ca3 a� �d i3o <br />C <br />.� � - Gp� - 10J•�� �Q <br />.. <br />1a ova ! �' ` '" A99 Igo 44 <br />I' d <br />c r A ' w `` <br />4t S. DE <br />1.3i' <br />�. <br />�b 1t01: q ; ad, oo �! v <br />a <br />Q _ -.��. �00.4�3 � •h 5�40 50.d!} fo:OlJ,. i .. <br />-19,100 <br />b <br />STRUCTURAL SECTIONS <br />Z, s, <br />NOTE : 411 RoaA'bVy -111 Ta Be 95'/• R_G "M,. <br />A// Fi// To ea 90 %, .9- C -A//i7- <br />~i�Gl/G/GG1 TYf G �� gs ' ��- - o,1�/ A- c• rYi0 '/a " < �2 �/ �IrlaX, WV <br />ant / 5u69 o25'r4. e/• Z r 3/4 "SAX. ) <br />_ D. G7• RC grnQ/ GrorirV <br />11Z44&:VA1aJV 6X . GO//7�d U JfGGi� /O 1"4 /1 /!G <br />LARK STREET WETHERLY CIRCLE <br />T. I• _ 4.0 2"-73 G.E. Provided a O. TO <br />r_n / <br />i <br />4, z; 7/ <br />GQi/�i • 1C./L!G// G/C.�U [�C///��. V- v ♦ - .r %.l / /--&, V♦ <br />CONSTRUCTioN <br />OUANTITIES <br />STREET SYSTEM <br />Roadway Excavation <br />1300 C.Y. <br />Import <br />- Lump Sum <br />Compact Original Ground <br />58,000 S.F. <br />Aggregate Base Cl. II (0.25') <br />35,340 S.F. <br />Aggregate Base Cl. II (0.33') <br />22,660 S.F. <br />Asphalt Concrete Type "B" (0.17`) <br />35,340 S.F. <br />Beveled Curb, Gutter & Sidewalk <br />3,015 L.F. <br />Street Sign <br />3 Each <br />Street Light <br />By P. G. & E <br />Concrete Subgrade Compaction <br />21,635 S.F. <br />Dead End Barricade <br />2 Each <br />Survey Monumentl3ox <br />3 Each <br />Aspho/l concrete , Type "Bp CO.20') <br />zz, 660 5 F. <br />STORM DRAIN SYSTEM <br />10" Storm Drain <br />247 L.F. <br />15" Storm Drain <br />205 L.F. <br />18" Storm Drain <br />241 L.F. <br />24" Storm Drai n <br />120 L.F. <br />Side Inlet Catch Basin <br />6 Each <br />48" Storm Drain Manhole <br />2 Each <br />WATER SYSTEM <br />R" Water <br />Ato valve <br />Fire Hydrant Assembly (Rich Ranger #960) <br />Services or j6gao/ <br />SANITARY SEWER SYSTEM <br />6" Sanitary Sewer <br />48" Sanitary Sewer Manhole <br />Servf ces <br />VICINITY MAP <br />bencnmark Doturn per u.s.e.s. &PmA. <br />19-0 194T-49. Location N.W. cornor <br />of Mosonic builaing in the town of. ... <br />Woodbridge. llsvati*M 4 46.40 <br />_.- <br />B E iV E D I C T <br />D R I V E <br />NOnF = Rel7e,,�Irar1a17 T/'eQr'1re/7r <br />W/ /_ r uid 4.! ,v/r A/f (Grade Sc - 7`O <br />T. E = 5 <br />6. A- Pro viiysd O. B6 <br />D /" S2 50 /5 CC -,0' 4 !` D. ¢ 9d /�59 yQ: <br />/n DnG ti �i7 . <br />NO. <br />DATE <br />REVISIONS <br />BY <br />DESIGN <br />DRAWN BY <br />APPROVED <br />//�� <br />. <br />T' <br />/ <br />2-24- 64 <br />Iewered 51reeY g-odes <br />PCS <br />� <br />!�/L <br />�, 1986 <br />_ <br />SUBMrI TED By <br />c <br />HENRY HIR <br />A RCE 21258 <br />R.C.E. `..�;1-�� <br />DATE <br />SAN JOAQUIN <br />UNTY DIRECTOR OF PUBLIC WORKS <br />SERVICES <br />958 L.F. <br />4 Each <br />5 Each <br />48 Each <br />897 L. F. <br />4 Each <br />48 Each <br />Street Lights Woodbridge Lighting District <br />Sewage Woodbridge Sanitary District <br />Natural Gas & <br />Electric P. G. & E. <br />Telephone Pacific Bell <br />Television Cable Lodi Cable T. V. <br />Water <br />Storm Drainage > Mokelumne Acres Maintenance district <br />LEGEND <br />S.I.C.B. or Side Inlet Catch Basin <br />L.P. Low Point <br />H.P. High Point <br />T.C. Top of Curb <br />C.O.T.G. Clean Out to Grade <br />S.D. Storm Drain Line Indicating Direction of Flow <br />S.S. Sanitary Sewer Line Indicating Direction of Flow <br />W. Water Line <br />a Fire Hydrant <br />0-11 Street Light <br />BAUMBACH & PIAZZA <br />CIVIL ENGINEERS <br />SURVEYOR6 <br />323 W. ELM ST. LODI , CALIF. <br />85240 PH: 209- 388 - B 818 <br />GENERAL NOTES <br />I. All work shall conform to these plans and any special provisions for this project. <br />2. Refer to the final map of this subdivision for all centerline and property line data. j <br />3. The street light system shall be installed by Pacific Gas & Electric Company. <br />4. Contractor shall receive an approved set of plans prior to beginning construction. <br />5. Baumbach & Piazza (Engineer) shall set all survey controls and construction stakes <br />necessary for completion of work. The Contractor shall be responsible for the preser- <br />vation of all survey and construction stakes. Survey and construction stakes that are <br />lost or destroyed due to Contractor's negligence will be set by the Engineer at the <br />Contractor's expense. <br />6. The existing underground utilities were plotted from available records. The <br />Contractor shall be responsible for contacting all utility agencies to mark their <br />facilities in the field before any excavation. The Contractor shall notify and <br />co-ordinate all work with any agency requiring removal or relocation of their <br />utilities. Pacific Bell, P. G. & E., Lodi Cable T.V., Woodbridge Sanitary <br />District and Woodbridge Lighting District. : USA (800)642-2444. <br />7. Contractor shall be responsible for notifying and co-ordinating all work with any <br />agency requiring removal or relocation of utilities, such as Pacific Bell, P.G.&E., <br />etc. <br />8. House services, fire hydrant laterals, and street light conduit shall be installed <br />prior to curb and gutter construction. All underground utilities within the street <br />area, including gas and telephone lines, shall be installed prior to paving. <br />9. All manholes to be set flush with finish grade unless otherwise indicated. <br />10. All water lines shall have a minimum cover of 3' - 0". <br />11. All existing irrigation lines within the right of way shall be crushed in place or <br />removed. <br />12. Water used in any phase of construction, such as backfill compaction, dust control, <br />testing or other work herein required, shall be included in the unit price or <br />lump sum bid for the respective items of construction. <br />13. Contractor agrees that he shall assume sole and complete responsibility for job <br />site conditions during the course of construction of this project, including <br />safety for all persons and property; that this requirement shall apply continuously <br />and not be limited to normal working hours and that Contractor shall defend, <br />indemnify, and hold the Owner and the Engineer harmless from any and all liability, <br />real or alleged, in connection with the performance of work on this project, <br />excepting for liability arising from the sole negligence of the Owner or the <br />Engineer. <br />14. Contractor shall give Engineer -a minimum of 48 hours notification prior to staking <br />any utilities. <br />15. Water services shall be marked by the curb and gutter Contractor with "W" stamped <br />on the top of curb. Sewer Services shall be similarly marked with an "S". <br />16. All work will be required to be inspected by the Department of Public Works. They <br />shall be notified not less than 24 hours in advance of commencement of work. <br />17. Lot grading shall be completed before starting any underground construction. <br />Refer to attached grading plan. <br />18. Each SS service to have C.O. at property line. See detail oo sht. �. <br />19. Note that sanitary inspection will be performed by San Joaquin County Department <br />of Public Works and Woodbridge Sanitary District Engineer and /or District staff <br />(Kjeldsen-Sinnock & Associates 209-946-0268). Must have inspection before backfill <br />and notify inspector 48 hours prior. <br />20. No materials resulting from tapping procedures may enter District sewer. <br />' 21. Separation of water and sewer mains (including crossings) and sewer laterals crossing <br />over water mains shall meet or exceed the latest standards of the State of <br />California Department of Health Services. Where water crosses SD or SS use <br />an 18-20 ft. length of Cl. 200 pipe, centered over the SS or SD if: a) The water <br />is under the SS or SD. b) The vertical clearance is less than 1 ft. <br />22. It is agreed that field conditions may require changes to these plans. It is <br />further agreed that the Director of Public Works may require changes, alterations <br />or additions to these plans, when the Director deems them to be necessary or <br />desirable for the proper completion of the work, provided that such than es, <br />alterations --.or additions shall not exceed 10% of the original estimate o? the <br />cost for the improvements without prior approval of the surety. <br />23. Fire Hydrant bid shall include the following: Tee, 6" Lateral, 6" Valve and complete fire hydrant <br />assembly. <br />24. All water lines shall be pressure tested, disinfected, flushed and tested for bacteria in conformance <br />with the San Joaquin County Health Code Requirements prior to connecting to existing water line. <br />Contractor shall notify Mokelumne Acres Maintenance District for approval prior to connecting <br />water line to existing water line. <br />SHEET INDEX <br />T KEY SHEET <br />QQ,® PLAN 81 PROFILE <br />OO ,OO DETAILS <br />OO GRADING PLAN <br />APPROVED BY <br />SAN=d6AQUiN LOCAL HEALTH DISTRICT <br />DATE <br />C'Jtst� <br />�' <br />�- <br />�J• <br />SAN A'QUIN FIRE <br />WARDEN <br />DATE <br />C7C-: <br />F OODBRIDGGEE <br />FIRE DISTRICT <br />DATE <br />,r <br />l�-gyp. <br />Fs -- <br />ENGINEER WOODBR <br />GE SANITARY DISTRICT <br />DATE <br />COUNTRY VIEW SUBDIVISION <br />KEY SHEET UNIT 100, 3 <br />SUBDIVISION IMPROVEMENTS <br />SHEET(' , OF <br />JOB NO. 09P,9 _3 <br />FILE G� <br />NO. 1 <br />