My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PW-ENCROACH-2402967
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2024
>
PW-ENCROACH-2402501 thru PW-ENCROACH-2403000
>
PW-ENCROACH-2402967
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2024 8:46:30 AM
Creation date
12/20/2024 8:46:04 AM
Metadata
Fields
Template:
Permits_Development
DocName
PW-ENCROACH-2402967
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2024
Notes2
12370 W. Ripon Rd., Ripon,CA heading east. West Ripon Rd. W/O Ripon City Limits
Type - Permit Process
Excavation and traffic control within the County ROW (all work already permitted with the City also)
Address
9245 Laguna Springs Dr. Suite 320, Elk Grove, CA 95758
Application
Michels Pacific Energy, Inc.
Project #
110005
Type
Encroachment Permit
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
X:\ENCROACHMENTS\General Provisions (Encroachment Permits)\Winter Weather Provisions.docx <br /> SPECIAL PROVISIONS <br /> Winter Weather Utility Work <br />__________________________________________________________________________________________ <br />__________________________________________________________________________________________ <br />1. SUPERVISION: The utility company (permittee) shall furnish full-time supervision of all work to insure <br />compliance with the permit provision. <br />2. START OF WORK: No work within the County right-of-way shall be started until the utility company <br />representative has made an evaluation of weather conditions and has determined the work can be <br />accomplished under the provisions of the permit. <br />3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement outside the area of work, <br />and if inadvertently tracked onto the road travel way shall be removed immediately. <br />4. DAILY RESTORATION: Private driveways and road intersections shall be restored daily. <br />5. WEATHER-TIGHT CONDITIONS: All trenches shall be filled and compacted, ditches and other <br />drainage facilities regarded and opened, and the entire work area restored to weather-tight condition prior to <br />any rain.
The URL can be used to link to this page
Your browser does not support the video tag.