My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PW-ENCUTIL-2402230
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2024
>
PW-ENCUTIL-2402001 thru PW-ENCUTIL-2402500
>
PW-ENCUTIL-2402230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2024 9:33:37 AM
Creation date
12/20/2024 9:33:28 AM
Metadata
Fields
Template:
Permits_Development
DocName
PW-ENCUTIL-2402230
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2024
Notes2
Michigan Ave. between Webster Ave. & Plymouth Rd. in Stockton
Type - Permit Process
Road Closure
Address
3136 Boeing, Stockton,CA 95206
Application
Pacific Gas & Electric
Project #
730052
Type
Utility Encroachment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for -2- <br />ENCROACHMENT PERMIT <br />All pipe and pipeline related facilities including, but not limited to, valves, utility boxes and vaults, <br />and frames and covers shall be maintained by Pacific Gas and Electric, including any facilities <br />that are abandoned in place. Pacific Gas and Electric shall be responsible for any and all costs <br />associated with the removal, relocation and/or adjustment of these facilities as determined by the <br />County at Pacific Gas and Electrics expense. (Streets and Highways Code Section 1463) <br />All future maintenance of the pipeline and related facilities within the County right-of-way will <br />require a San Joaquin County Encroachment Permit. <br />Trenches/bell holes shall be maintained in a smooth and even condition to the satisfaction of the <br />County throughout the project limits at all times. <br />All trenches/bell holes shall be completely backfilled or shored and plated at the end of each <br />workday, and the roadway restored to two-way traffic. If plating is to be used, a trench shoring <br />and plating plan suitable for traffic loadings shall be prepared by a registered civil engineer and <br />submitted for prior approval by the County. <br />The contractor shall use San Joaquin County Improvement Standard R-29 when backfilling <br />trenches/bell holes within the County right-of-way. Where the existing road structural section is <br />below standard, a minimum section of 3 inches of asphalt concrete over 8 inches of aggregate <br />base shall be required. <br />Final paving for trench repair or road resurfacing shall be per Caltrans specifications and shall <br />not occur between November 1 and March 31, without prior authorization from the San Joaquin <br />County Department of Public Works Field Engineering Division, contact them at 209-953-7421. <br />No paving joints are allowed within paved shoulder; contractor shall pave all the way to outer <br />edge of paved shoulder. <br />Class II Aggregate Base shoulder backing is required from the edge of pavement, a minimum of <br />inches thick by 4-feet wide. <br />Contractor shall establish existing roadway and drainage grades within the construction area. <br />Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade <br />changes shall receive prior approval from County. <br />Above ground vaults, panels and/or other similar facilities will be allowed within the right-of-way if <br />located as far to the outside edge as possible. Utility vaults shall be located a minimum of 4-0 <br />from edge of pavement.
The URL can be used to link to this page
Your browser does not support the video tag.