My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
L782 - L845
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer L
>
L782 thru
>
L782 - L845
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2024 10:33:13 AM
Creation date
12/31/2024 10:26:20 AM
Metadata
Fields
Template:
Large Plans - LP
Project
Lower Sacramento Road Improvements (Phase 1 - WID Canal to Woodbridge Road)
Limits
Turner Road to Woodbridge Road
Year
2004
Project Engineer
A. Engel
Roads Worked
Lower Sacramento Rd.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
L782 - L845
Type
Improvements
Document Relationships
Agusta Street (Woodbridge)
(Message)
Path:
\VAULT MAPS\*CARD CATALOG*\A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f <br />Abut 1 CL Abut 2 <br />1 1 2" 6" <br />00 See Interlocking Paving (Median ) <br />Sheet LS-8 <br />2—#4 cont 4 x 1 ' -6 " @18 <br />Note : <br />Concrete Curb to be paid as <br />Structural Concrete Bridge . <br />RAISED MEDIAN CURB DETAIL <br />Not to Scale <br />o <br />0 <br />111 +50 N11054 ' 17 " E <br />112+00 LS" Line 112+50 <br />Notes : <br />1 . Contour interval is 0 . 1 Ft . <br />2 . Contours do not include camber or falsework settlement / camber . <br />3 . Indicates half foot contours . <br />Falsework Release <br />Alternative 1 : <br />Falsework shall be released as soon as permitted by the specifications . Closure Pour <br />shall not be placed sooner than 60 days after the falsework has been released . <br />Alternative 2 : <br />Falsework shall be released less than 28 days after the last concrete has been placed .Closure pour shall not be placed sooner than 14 days after the falsework has been released . <br />When Falsework Release Alternative 2 is used , camber values are 7 times those shown . <br />06 <br />d <br />PLAN <br />Edge of Deck , t y p j91 <br />11 <br />Rg h-s }raW nrgoohsIdVeriiM" nfnrrnat#nr a '`Pt),7 r'hrSRF• rlf ti17rM <br />Scale : 1 " = 5 ' <br />Lower Sacramento Road, Bride 29C- 190 Replacement Across WID Canal <br />BEFORE EXCAVATING Revision <br />QROfESSt <br />Nq <br />CALL U.S.A. Na. <br />Description Date By pprove <br />B w <br />UNDERGROUND SERVICE ALERT MARK THOMAS & COMPANY, INC. PO—KAN CHEN z DEPARTMENT OF PUBLIC WORKS800-227-2600 ORIGINAL SCALE IN INCHES <br />7300 FOLSOM BOULEVARD, SUITE 203rn <br />TOLL FREE PLANS ACCEPTA LE 0 WOODBRIDGE IRRIGATION DISTRICT FOR REDUCED PLAN SACRAMENTO, CALIFORNIA 95826 <br />No. S 112 <br />916) 381-9100 Exp . 9 30 os SAN JOAQUIN COUNTY, CALIFORNIA2WORKINGDAYSBEFOREALL <br />srRucruRnLPLANNEDWORKOPERATIONSwit <br />DA ' <br />0 1 23 <br />ANDERS CHRIS SEN, MANAGER fF CPcn ifDRAWNBYDATEPROJECTENGINEERDATECHECKEDDATEAPPROVALRECOMMENDEDDATEC. B ko 5 10 04 <br />LOWER SACRAMENTO ROAD IMPROVEMENTS SNO TOTAL <br />71 -53006 R. TRICUEROS 5/10/04 C. ROCKWAY 5/10/04 ad SO* COUNTY OF SAN JOAQUIN SCALE: AS NOTED DECK CONTOURS <br />SHEET N0. ACAD REVISIONS DATE <br />TURNER ROAD TO WOODBRIDGE ROAD - PHASE 1 42 64FILENAMEDRAWER
The URL can be used to link to this page
Your browser does not support the video tag.