My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
L782 - L845
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer L
>
L782 thru
>
L782 - L845
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2024 10:33:13 AM
Creation date
12/31/2024 10:26:20 AM
Metadata
Fields
Template:
Large Plans - LP
Project
Lower Sacramento Road Improvements (Phase 1 - WID Canal to Woodbridge Road)
Limits
Turner Road to Woodbridge Road
Year
2004
Project Engineer
A. Engel
Roads Worked
Lower Sacramento Rd.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
L782 - L845
Type
Improvements
Document Relationships
Agusta Street (Woodbridge)
(Message)
Path:
\VAULT MAPS\*CARD CATALOG*\A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A <br />r MIN. -2" MAX. QUICK COUPLER <br />FROM FIXED VALVE IN BOX,IMPROVEMENT <br />14" X 19" IIIIII <br />RECTANGULAR <br />VALVE BOX. IIII II IIII <br />23" X 33"g <br />RECTANGULAR VIIIVARIESVALVEBOX. <br />2--0" AIIII= <br />TO MAIN LINE I I III I II I I 12 12 12 <br />N IMIN.Tu D <br />18. o <br />E <br />11 <br />12 N Z 0.0z G <br />O B MSN <br />T I H <br />8..3.. 2' <br />MIN MI <br />B TOP VIEW EDGE OF, WALK, I <br />C <br />C <br />CURB, ETC. <br />D <br />E <br />LEGEN <br />LEGEND LEGEND A) PLASTIC VALVE BOX W/ LOCK E) #4 REBAR STAKE (18" LENGTH) <br />BOLT SET - SET 1" ABOVE FINISH <br />1) CENTER BOX OVER REMOTE CONTROL VALVE TO FACILITATE SERVICING GRADE IN SHRUB AREA F) PEA GRAVEL - 4" DEEP BELOWA) CONTROL WIRE: TAPE & BUNDLE WIRING AT VALVE. Q.C.V.10' 0' INTERVALS. COMMON TRENCHING OF 2) SET BOXES 1" ABOVE FINISH GRADE OR MULCH COVER IN GROUND <br />B) QUICK COUPLING VALVEIRRIGATIONPIPESANDREMOTECONTROL G) SINGLE MARLEX STREET ELLCOVER/SHRUB AREA AND FLUSH WITH FINISH GRADE IN TURF AREA. <br />C) STAINLESS STEEL CLAMPVALVEWIRINGTOBEDONEWHENEVERLEGEND <br />POSSIBLE . 3) SET RCV AND VALVE BOX ASSEMBLY IN GROUND COVER/SHRUB H) TEE - SCH. 80 P.V.C.A) 12" POP-UP SHRUB HEAD AREA WHERE POSSIBLE. INSTALL IN LAWN AREA ONLY IF GROUND D) <br />IRRIGATION LATERAL - ALL PVC COVER DOES NOT EXIST ADJACENT TO LAWN. I) MAIN LINE - SCH. 40 P.V.C.PIPES TO BE SNAKED IN TRENCHES. B) DOUBLE MARLEX STREET ELL 4) SET BOXES PARALLELTO EACH OTHER AND PERPENDICULAR TO EDGE. <br />C) MAIN LINE C) NIPPLE - SCH. 80 P.V.C. 5) AVOID HEAVILY COMPACTING SOIL AROUND VALVE BOX EDGES TO QUICK COUPLER VALVE <br />D) TEE - SCH. 40 P.V.C.PREVENT COLLAPSE AND DEFORMATION OF VALVE BOX SIDES. <br />E) LATERAL LINE - CLASS 200 P.V.C. <br />6) VALVE BOXES SHALL HAVE BOLT DOWN LIDS. A <br />TRENCH DETAIL IN MEDIAN 12" SHRUB POP-UP ASSEMBLY VALVE BOX INSTALLATION DETAIL <br />B (DIAGRAMMATIC) <br />N.T.S. <br />N. T. S. <br />FLOW <br />C <br />D <br />E <br />12" MIN F <br />A A <br />A <br />B <br />C <br />Bn FLOW - G.P.M. 12" MAX. <br />B 18" MIND2.5 - GROUNDCOVER <br />y <br />C0 o <br />D SHRUBS M <br />C <br />F <br />y <br />G <br />D C' <br />H <br />FLOW H METER IN BOX (N.T.S.) LEGEND <br />r) <br />08 E c A) STRONGBOX ENCLOSURE OR APPROVED EQUAL. <br />F <br />Ib <br />o <br />IIII <br />C B) REDUCED PRESSURE BACKFLOW <br />r I PREVENTER FEBCO 825YA OR EQUAL. <br />IIII <br />C, 14 LEGEND r+?Ctic fw <br />C) SHUT-OFF VALVES (2). <br />e t' 'lpec 8 r • ._. <br />1 D) 12 MIN. CLEARANCE ON TEST PETCOCK SIDE. <br />LEGEND D A) CARSON 910 BOX E) SHUTOFF GATE VALVE. <br />Are / <br />2 <br />0 _ <br />f GI E) SLEEVE, SCH. 40 P. V. C.LEGEND <br />B) FINISH GRADE. F) PEA GRAVEL 4" DEEP All V tD o rh ry„ <br />NO SOIL IN BOX). fnrmBp?Cr t3„ <br />F) CONCRETE PADA) CONTROL WIRES WITH LOOPS - 36” D) ADAPTER A) HUNTER MODEL: SG-MC RAIN SENSOR <br />EXTRA WIRE FOR MAINTENANCE MOUNT W/ U-BOLTS. C) 1" IN SHRUB OR <br />G BRICK- 2 TOTAL. <br />FLOW - G.P.M. flnrl rte, SN, ' <br />1r <br />G <br />N <br />E) PEA GRAVEL BED GROUND µxk FLANGE - OPTIONAL . <br />7\ <br />B) PLASTIC VALVE BOX W/BOLT DOWN B) 2" DIA. x 5' STAINLESS STEEL MOUNTING COVER AREA. 2.6 - GROUNDCOVERSLIDSET1" ABOVE FINISH GRADE. F) BRICK SUPPORTS POST W/ CAP. H) PVC MAIN LINE (18" DEPTH). 0.5 TREE BUBBLER H) WATER METER INSTALLED BY CONTRACTOR. <br />C) UNION (SCH. 80) G) MAINLINE <br />D) 6" PVC PIPE. <br />I) PVC MALE ADAPTER.C) CONCRETE FOOTING. <br />TYPICAL DIAGONAL & SIDEWALK 2" REDUCED PRESSURED) TWO CONDUCTOR WIRE TO CONTROLLER. <br />PLANTER - IRRIGATION BACKFLOW W/ WATER METER <br />REMOTE CONTROL VALVE RAIN SENSOR ISOLATION GATE VALVE - MEDIANS <br />SCALE: 1/4" 1'-0" N.T.S. <br />N.T.S N.T.S. LS-V <br />BEFORE EXCAVATING Revision <br />HAFIRINGT <br />GPPEARCy/ <br />CALL U.S.A. No <br />Description Date By PProv <br />vDAVIDBUNDERGROUNDSERVICEALERTRDEPARTMENTOFPUBLICWORKS <br />800-227-2600 D C A <br />924 NORTH YOSEMITE STREET sGN TU E <br />TOLL FREE <br />con $ t r U C t I on STOCKTON, CALIFORNIA 95203 9 <br />2/2aDATES <br />oP <br />e <br />SAN JOAQUIN COUNTY, CALIFORNIA2WORKINGDAYSBEFOREALLT209.462.2873 - F209.462.8308 e <br />PLANNED WORK OPERATIONS arch I t e c t U re Ewww . dcaaia . com FCA0 <br />DRAWN BY DATE DESIGN DATE CHECKED DATE SUBMITTED DATE APPROVALRECOMMENDED DATE <br />IRRIGATION LOWER SACRAMENTO ROAD IMPROVEMENTS SHEET TOTALDC" COUNTY OF SAN JOAQUIN SCALE:NO. SHEETSL-MD DCH 5/11/04 i DETAILS TURNER ROAD TO WOODBRIDGE ROAD - PHASE 1 58 64 <br />L 1 $
The URL can be used to link to this page
Your browser does not support the video tag.