Laserfiche WebLink
SIGNAGE QUANTITY SUMMARY CONCRETE QUANTITY SUMMARY <br />REMOVE RESET RELOCATE INSTALL OBJECT MINOR MINOR MINOR MINOR MINOR MINOR MINOR MINOR <br />ROADSIDE ROADSIDE ROADSIDE ROADSIDE MARKER CONCRETE CONCRETE CONCRETE CONCRETE CONCRETE CONCRETE CONCRETE CONCRETE <br />LOCATION — DESCRIPTION SIGNS SIGNS SIGNS SIGNS TYPE K )LOCATION — DESCRIPTION CURB & GUTTER) (ROLLED C&G) (MEDIAN C&G) CURB RAMP ) ( S I DEWALK ) (DWY TYPE A2) ( CURB ) VALLEY GUTTER) <br />EA EA EA EA EA LF LF LF SY SY SY LF LF <br />CAROLINA to W . I . D . BRIDGE 1 1 CAROLINA to W . I . D . BRIDGE 70 32 70 16 <br />107+50 to 112+00 107+50 to 112+00 <br />W . I . D . BRIDGE to INDIANA 2 5 1 W . I . D . BRIDGE to INDIANA 400 32 30 300 104 <br />112 . 00 to 114+20 112 . 00 to 114+20 <br />INDIANA to AUGUSTA 2 4 INDIANA to AUGUSTA 480 180 48 265 124 <br />114+20 to 118+40 114+20 to 118+40 <br />AUGUSTA to MOKELUMNE 2 4 3 4 AUGUSTA to MOKELUMNE 150 231 53 520 72 815 682 <br />118+40 to 122+60 118+40 to 122+60 <br />MOKELUMNE to OVERFLOW BRIDGE 1 1 1 2 MOKELUMNE to OVERFLOW BRIDGE 320 310 85 14 225 55 <br />122+60 to 126+85 122+60 to 126+85 <br />TOTAL 4 3 11 4 12 TOTAL 1420 310 560 145 1380 371 815 682 <br />UTLITY QUANTITY SUMMARY PAVEMENT DELINEATION QUANTITY SUMMARY <br />1 " 8" BLOW FIRE THERMOPLAST I C THERMOPLAST I C THERMOPLAST I C THERMOPLASTIC PAINTED PAVEMENT <br />8 SEWER <br />WATER WATER <br />8 UTILITY <br />OFF HYDRANT PAVEMENT 4" TRAFFIC 6 " TRAFFIC 8 " TRAFFIC 4" PARKING MARKERS <br />LOCATION — DESCRIPTION SEWER PIPE MANHOLE SEVICE PIPE GATE VALVE CROSSING VALVE ASSEMBLY LOCATION — DESCRIPTION MARKING STRIPE STRIPE STRIPE STRIPE REFELECTIVE) <br />LF EA EA LF EA EA EA EA SF LF LF LF LF LF <br />CAROLINA to W . I . D . BRIDGE CAROLINA to W . I . D . BRIDGE 152 1622 40 <br />107+50 to 112+00 107+50 to 112+00 <br />W . I . D . BRIDGE to INDIANA 1 W . I . D . BRIDGE to INDIANA 290 524 40 34 <br />112 . 00 to 114+20 112 . 00 to 114+20 <br />INDIANA to AUGUSTA INDIANA to AUGUSTA 505 1282 40 160 50 <br />114+20 to 118+40 114+20 to 118+40 <br />AUGUSTA to MOKELUMNE 68 1 4 692 3 2 1 AUGUSTA to MOKELUMNE 410 760 140 1570 41 <br />118+40 to 122+60 118+40 to 122+60 <br />MOKELUMNE to OVERFLOW BRIDGE 3 162 2 1 MOKELUMNE to END OF PROJECT 420 10152 80 150 240 <br />122+60 to 126+85 122+60 to 146+50 <br />ALLOWANCE <br />1 <br />4 <br />TOTAL 68 1 7 854 5 7 1 1 TOTAL 1775 14430 80 370 1730 405 <br />ALLOWANCE OF 4 ADDITIONAL CROSSINGS INCLUDED IN ESTIMATE . <br />p <br />xorreCtions :y <br />Changes Ry <br />Any ersan Us is r wing Should Veri}y A/ <br />ar# rnfrrrrnatinn Eau in,Ttio RHn flf Q iw, <br />QROFESSIONq <br />BEFORE EXCAVATING Revision. Description Date By ° <br />ve <br />o CDN RQC <br />CALL U.S.A. <br />By MARK THOMAS & COMPANY, INC. y DEPARTMENT OF PUBLIC WORKS <br />UNDERGROUND SERVICE ALERT ORIGINAL SCALE IN INCHES 7300 FOLSOM BOULEVARD, SUITE 203 No. 35 70 <br />A <br />800-227-2600 FOR REDUCED PLAN SACRAMENTO, CALIFORNIA 95826 <br />TOLL FREE 916) 381-9100 Exp. 9 30 05 SAN JOAQUIN COUNTY, CALIFORNIA <br />2 WORKING DAYS BEFORE ALLCIVIL <br />PLANNED WORK OPERATIONS 0 1 2 3 <br />OF <br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE APPROVAL RECOMMENDED DATE LOWER SACRAMENTO ROAD IMPROVEMENTS <br />SHE <br />SHEETST. NCUYEN s10 4 COUNTY OF SAN JOAQUIN SCALE: NO SCALE QUANTITIESA. ENCEL s/o/04 C. ROCKiYAY s/%a A%mvs A&zs 1 TURNER ROAD TO WOODBRIDGE ROAD — PHASE 1 64 64 <br />FILE NAME DRAWER I SHEET NO. ACAD REVISIONS DATE