My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PW-ENCUTIL-2402624
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2024
>
PW-ENCUTIL-2402501 thru PW-ENCUTIL-2403000
>
PW-ENCUTIL-2402624
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2025 9:01:17 AM
Creation date
1/2/2025 9:01:09 AM
Metadata
Fields
Template:
Permits_Development
DocName
PW-ENCUTIL-2402624
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2024
Location
PM 35557406 - Road Closure on Euclid Ave., between Wallace Ave. and Kirk Ave. for electric distribution pole replacement via crane set in rear of 3131 Alpine Ave.
Type - Permit Process
Road Closure
Address
3136 Boeing, Stockton,CA 95206
Application
Pacific Gas & Electric
Project #
730052
Type
Utility Encroachment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PW-ENCUTIL-2402523 December 17, 2024 <br />REVISED <br />SPECIAL CONDITIONS FOR <br />PG&E – MIGHIGAN AVE. – PM# 35516589 <br />ENCROACHMENT PERMIT <br />Maintain traffic controls for all roads. Two-way traffic shall be maintained during non-working <br />hours with excavated areas backfilled or plated. <br />Applicant shall notify and coordinate with all emergency services (fire, police, etc.), local schools <br />and the local postmaster a minimum of seven (7) days prior to the road closure. <br />Contractor/Applicant will notify San Joaquin County Road Maintenance (209-468-3074) and Field <br />Engineering (209-953-7421) 48-hours prior to any road closures with location, date and duration. <br />Access to all properties shall be maintained at all times except when work is occurring at the <br />access point. Minimal delays will be allowed to provide access within the work zone area. <br />Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br />contractor shall be replaced with in-kind or better materials. <br />Residents and businesses shall be notified in writing, as approved by the County, 48 hours in <br />advance of any impacts to their access. <br />Any areas where parking is to be restricted shall have signs noting the restrictions in place at least <br />48 hours in advance. <br />All destroyed or obliterated pavement markings must be replaced in kind by the permittee. Typical <br />pavement markings include but not limited to lane lines, centerlines, stop and stop ahead legends, <br />limit lines, raised pavement markers and miscellaneous delineators. <br />The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted. Prior to the start of construction, survey monuments that potentially may <br />be disturbed shall be located and referenced by a Licensed Land Surveyor, and a Corner Record <br />filed with the County Surveyor. Any Survey Monuments disturbed during the course of <br />construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br />with the County Surveyor. (Land Surveyors’ Act Section 8771) <br />County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. All standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br />The contractor shall not conduct construction operations in rain or heavy fog conditions.
The URL can be used to link to this page
Your browser does not support the video tag.