My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for South Collection System - Schedule E
PublicWorks
>
VAULT MAPS
>
References
>
Improvement District No. 51 - East Stockton Sanitary Sewer Project
>
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for South Collection System - Schedule E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 9:11:50 AM
Creation date
1/24/2025 1:39:36 PM
Metadata
Fields
Template:
Reference
Ref Doc Name
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for South Collection System - Schedule E
Non-Public Works
Yes
Division Submitted By
Design Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DEL MAR AVENUE ADRIENNE AVENUE ANTHONY AVENUE THELMA AVENUE WALKER LANE <br />1 <br />0 <br />SCALE: H. /"• SO', V. <br />A DESIGNED: C. S. <br />PARKER <br />DRAWN: _ L.A. MAL/N <br />CHECKED: O.T SCNULMS <br />PROD. ENGR.: R.R. //EINEN <br />WN BY DATE - REVISIONS <br />HOBART AVENUE <br />N <br />W t- <br />y <br />} <br />PAVEMENT PROP,/tE <br />k, <br />1. <br />30 <br />25 <br />25 <br />.5SOf/TN <br />2 .0 NORTH <br />As' <br />ZO <br />^ <br />292 Lf- <br />" <br />`- <br />DE <br />IGN DEPTH 9 TT. <br />:15?7.-Z14NOLRJR�� <br />DESIGN DEPTH 10 <br />FT_,.. <br />/924 SOOTN <br />/7./3 <br />/ 5 <br />/5 <br />CONS_R <br />. Mi/ <br />/9 / <br />CQA/N�C7; <br />-T <br />IV <br />AST WEST <br />10 <br />- <br />5 <br />i <br />Zt <br />.- <br />kn <br />1 2 3 4 $ 6 7 8 9 10 1> 12 <br />ORGE S. N,OOLTTE AND ASSOCIATES <br />BY:--��"-"`""""' <br />■ <br />■ <br />GEORGE S. NOLTE AND ASSOCIATES <br />CIVIL AND ENVIRONMENTAL ENGINEERS • PLANNERS • SURVEYORS <br />SAN JOSE • WALNUT CREEK • SACRAMENTO • SAN DIEGO <br />14081287-3400 14151934-M 191614465020 17141278-9392 <br />-EAST STOCKTON SANITARY SEWER PROJECT- <br />SOUTH COLLECTION SYSTEM - SCHEDULE E <br />HOBART AVENUE STA 0+00 TO 13+00 <br />SHEET <br />101 <br />OF 151 SHEETS <br />DATE: 4.25.84 R.C.E 32717 <br />BY LOU Y FAN JOIUIN <br />JOB NO. <br />2181-83- <br />
The URL can be used to link to this page
Your browser does not support the video tag.