My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for South Collection System - Schedule E
PublicWorks
>
VAULT MAPS
>
References
>
Improvement District No. 51 - East Stockton Sanitary Sewer Project
>
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for South Collection System - Schedule E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 9:11:50 AM
Creation date
1/24/2025 1:39:36 PM
Metadata
Fields
Template:
Reference
Ref Doc Name
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for South Collection System - Schedule E
Non-Public Works
Yes
Division Submitted By
Design Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NETHERTON AVENUE <br />A <br />E <br />BROADWAY <br />GARDEN AVENUE H/GHWAY 99 <br />0 41ERAIS E Y A VENUE <br />aim <br />'-�--,.-.__Ism <br />ammmmmimwuum <br />■������� <br />_-��iii7i9il�i3i3��� <br />Ems <br />Mimi <br />IMEMEM <br />W-i <br />■==== <br />sm8�m <br />MMIM <br />�mmmm <br />mmmo <br />mmi <br />q <br />lw <br />O / 3 4 S 6 7 8 9 <br />DATE: <br />GEORGE S. NOLTE AND ASSOCIATES <br />BY: -�.:.� <br />■■ <br />■ <br />GEORGE S. NOLTE AND ASSOCIATES <br />AND ENVIRONMENTAL ENGINEERS •PLANNERS •SURVEYORS <br />SAN JOSE • WALNUT CREEK • SACRAMENTO • SAN DIEGO <br />14081287-3400 (41519344M 19161446-5020 17141278.9392 <br />SCALE: H./•.SO' V^ 51 <br />DESIGNED: C. 5. PARKER <br />DATE: 4"25,84 R.C.E 32717 <br />DRAWN: I.A.AorAZIN <br />COUM SAN ��NCIVIL <br />CHECKED: II T. SCNLLTEJ <br />PROJ. ENGR.: R. R. M&Nek <br />B <br />a.C.E.i7 42 <br />DATE: 7 O.8R <br />BY <br />DATE <br />REVISIONS <br />- EAST STOCKTON SANITARY SEWER PROJECT - <br />SOUTH COLLECTION SYSTEM - SCHEDULE E <br />GUERNSEY AVENUE STA 0+00 TO 10+00 <br />25 <br />SHEET <br />144 <br />OF 161 SHEETS <br />JOB NO. <br />2181- 83- <br />
The URL can be used to link to this page
Your browser does not support the video tag.