Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for South Collection System - Schedule E
PublicWorks
>
VAULT MAPS
>
References
>
Improvement District No. 51 - East Stockton Sanitary Sewer Project
>
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for South Collection System - Schedule E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 9:11:50 AM
Creation date
1/24/2025 1:39:36 PM
Metadata
Fields
Template:
Reference
Ref Doc Name
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for South Collection System - Schedule E
Non-Public Works
Yes
Division Submitted By
Design Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1-44 <br />0 <br />7 <br />EAST STOCKTON SS (BENCHMARKS) <br />NO. <br />ELEV. <br />DESCRIPTION <br />13 <br />20.23 <br />CO B.M. HIS Oro and RR <br />13-A <br />27.15 <br />12' FLT. x S/O RR, N/O and Railroad Ave. E/O <br />Sinclair <br />21 <br />27.81 <br />Spike in Pine @ NW cor Oro and Horner <br />21-A <br />27.96 <br />Co,nc. Nail @ EPNN cor Horner and Sinclair <br />21-3 <br />28.66 <br />Nail @ Horner and Dawes <br />21-C <br />29.82 <br />Nail in PP t9047 N/side Horner, 150' E/O <br />Delmar <br />21-D <br />30.52 <br />Nail @ Horner and Walker <br />21-E <br />29.23 <br />N/rim MB int Walker and Marsh <br />21-F <br />29.25 <br />N/rim MH int walker and Lafayette <br />23 <br />26.92 <br />Nail N/side Horner 50. E/O Hinkley <br />23-A <br />29.29 <br />Nail in PP W/panel E/side Hinkley 4th pule <br />S/O Horner <br />23-D <br />27.80 <br />Boat spike in PP 573783 NIB cor Hinkley and <br />Main <br />26 <br />24.89 <br />CHIS • ❑" B/walk 525 Garden Ave. <br />26-A <br />25.32 <br />N/rim MH int S. Broadway and Horner <br />26-B <br />27,.42 <br />Nail in TP #902 @ BE cor Broadway and Main <br />44 <br />22.37 <br />MN Bolt light ■td and Shell eta Fremont and <br />Filbert <br />90 <br />40.31 <br />Nail @ top of Levee @ end of Ellen <br />90-A <br />32.07 <br />Spike in PP 200 ft South of end of Stokes @ N <br />Y.L. of Del Monte 416 <br />96 <br />26.20 <br />CHIS '[I* Bass Econo Gas Sign @ Sinclair and <br />Washin ton <br />100 <br />26.81 <br />Cut • U.on TIC parking area @ 4926 <br />Washington <br />101-A <br />28.84 <br />Nail 8 int Anthony and Elvin <br />101-E <br />30.05 <br />Spike in PP M side of Elvin 300' R/O Walker <br />101-C <br />31.39 <br />Nail int Elvin and Cardinal <br />106 <br />30.27 <br />SE cor of drain inlet 8 NE cor Cardinal and <br />Washington <br />106-A <br />31.65 <br />Nail int Cardinal and Marsh <br />109 <br />31.41 <br />Cut •❑ • MN corner concrete walk at 5674 <br />Nashington <br />112 <br />27.69 <br />C.O. BM N/end NIB ret Main and Oro <br />112-A <br />30.00 <br />Boat spike in TP 44340 Ely end of Centro Mart <br />lot S/side Main <br />112-N <br />29.61 <br />N/rim MH NIB Dawes and Main <br />112-C <br />29.43 <br />Nail C. L. Dawes Opp PP 73133 on B side Dawes <br />114-A <br />27.68 <br />N a T in! Guarnsay and Hinkley <br />114-5 <br />to.SS <br />Solt and Panal 8 int Guernsey and Broadway <br />nn <br />�uf 111il 1! <br />i <br />NO. <br />ELEV. <br />DESCRIPTION <br />117 <br />27.39 <br />Cut '❑ " TIC HIP NW ret Oro and Section <br />118 <br />28.82 <br />Cut '[I' on NW cor gas pump island @ SE cor <br />Section and Adelbert <br />121 <br />26.64 <br />Cut -[I- TIC NIP BE ret Adelbert and Fourth <br />123 <br />28.08 <br />Cut '[I" TIC NIP BE ret Adelbert and Sixth <br />125 <br />29.09 <br />CHIS " ❑ " MW cor box culvert Highway 4 and <br />Adelbert <br />125-C <br />32.63 <br />CRIS " ❑ " BE cor box Culvert Mormon Slough <br />125-D <br />31.56 <br />Nail int Main and Walker <br />125-B <br />34.18 <br />Nail in mailbox 45340 E. Main <br />125-F <br />34.91 <br />N S T int Main and Flower <br />125-G <br />35.55 <br />Nail E/O RR Spike @ int Main and Bird <br />125-H <br />33.74 <br />CHIS " ❑ " @ end curb 772 Bird E/side <br />125-J <br />34.76 <br />Top fire hydrant NW cor BirdandArdelle <br />125-K <br />31.63 <br />Nail and washer int Cardinal and Ardelle <br />144 <br />29.02 <br />Nail N side of Fremont, E side of Hwy 99, top <br />of her., Opp Los Angeles, 49, Sacramento <br />144-A <br />24.71 <br />Nail and tag, fit X, 11' N of 614 Anteros <br />144-B <br />24.51 <br />Pin and washer @ Anteros and Miner <br />144-C <br />27.27 <br />Top of hydrant NE corner Miner and Lillian <br />144-D <br />26.33 <br />Spike and washer @ Miner and Oro <br />149 <br />28.03 <br />S/side, N Lane, Highway 26 w/o Highway 99 <br />149-A <br />24.31 <br />Pin and washer @ end of Broadway <br />149-B <br />24.00 <br />P.K and washer @ Broadway and Miner <br />149-C <br />22.37 <br />P.R. int Miner and Alice <br />149-D <br />21.31 <br />Spike in PP 49300 s/w cor Miner and Shasta <br />149-B <br />19.56 <br />Nail and washer @ Miner and Filbert <br />151 <br />24.08 <br />USGS Brass Disc B-965 top head wall N.E. ret <br />Fremont and Broadway <br />154 <br />22.79 <br />Cut " ❑ " TIC M/P SW ret Fremont and Shasta <br />® B-42 SOILS INVESTIGATION TEST SORING - LOCATION AID LOG <br />NUMBER (SEE CONTRACT DoCDIQm - ArrENDIx •A' Pm won <br />LOGS) <br />® 125D SENCHMARK NUMBER AND LOCATION - (SEE BELOW FOR <br />ELEVATION AND DESCRIPTION). <br />'NOTE: THE DATUM FOR THE VERTICAL CONTROL SURVEY IS PURPORTED TO RE NATIONAL <br />GEODETIC VERTICAL DATUM OF 1929 (FORMERLY SEA LEVEL DATUM OF 1929). <br />FOR THE PURPOSES OF THE EAST STOCKION SEWER PROJECT, SAN JOAQUIN COUNTY <br />BENCHMARK GR-22.7, ON THE BRIDGE AT STATE HIGHWAY 26 AND THE STOCKTON <br />DIVERTING CANAL, WITH A PUBLISHED ELEVATION OF 42.366, HAS ARBITRARILY <br />BEEN TAKEN AS THE BASIS OF ELEVAIION FOR THE VERTICAL CONTROL SURVEY. <br />DATE CITY APPROVAL 6LUN6L S. NULIL AND ASSOCIATES <br />=��1�- EAST STOCKTON SANITARY SEWER PROJECT SHEETSCALE. I' 4DO' By DATE By. <br />DEWSMEDC.s.PARXER GEORGE S. NOLTE AND ASSOCIATES SOUTH COLLECTION SYSTEM - SCHEDULE E 150 <br />DRAWN:f. r *Asco DATE: 4 25 84 R.C.E. 32717 <br />OF 161 sMEEn <br />N N J AQUI! SOIL BORING AND BENCHMARK LOCATIONS JOB No. <br />CHECKED: n.z scNce7Es � SAN JOSE ■ WALNUT CREEK ■ SAN DIEGO ■ SACRAMENTO <br />PROD. ENSR:RR. NEINEN By: I (408) 287-34W (415) 934-8080 (714) 278-9392 (916) 446-5028 2181 - 83 - <br />By DATE REVISIONS DATE: Z0'84 RCE.174 Z SHEET 2 OF 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.