My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for South Collection System - Schedule E
PublicWorks
>
VAULT MAPS
>
References
>
Improvement District No. 51 - East Stockton Sanitary Sewer Project
>
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for South Collection System - Schedule E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 9:11:50 AM
Creation date
1/24/2025 1:39:36 PM
Metadata
Fields
Template:
Reference
Ref Doc Name
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for South Collection System - Schedule E
Non-Public Works
Yes
Division Submitted By
Design Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FOURTH STREET SECT/ON STREET <br />30 <br />4 <br />25 <br />�t <br />20 <br />8 4 <br />8" <br />_ <br />-+A <br />— <br />/0 <br />/4.03. <br />WE57EAST <br />3.8/ NORTH <br />i <br />DATE: <br />R. /-- so', V. /"- 5. <br />JED: C.S. PARKER <br />I: L. A. MAL/N <br />ED: O. T. SCHVLTES <br />ENGR.: R. R. ,vEi,vPN <br />REVISIONS <br />A DEL BERT' A VENUE <br />/6 /7 /8 /9 20 2 / 2 2 <br />GEORGE S. NOLTE ANQ ASSOCIATES <br />BY. 6ecA(.� ■ GEORGE S. NOLTE AND ASSOCIATES <br />DATE: 4.25 84 R.C.E 32717 CIVIL AND ENVIRONMENTAL ENGINEERS • PLANNERS • SURVEYORS <br />COUNTY OF SAN JO QI IN FQEB <br />Y: _ SAN JOSE •WALNUT CREEK SACRAMENTO SAN DIEGO <br />GATE:7O.84 R.C.E. /74 z 14081287-34M 14151 934.8080 19161448a020 (7141 278-9392 <br />t <br />o <br />30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.