My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for South Collection System - Schedule E
PublicWorks
>
VAULT MAPS
>
References
>
Improvement District No. 51 - East Stockton Sanitary Sewer Project
>
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for South Collection System - Schedule E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 9:11:50 AM
Creation date
1/24/2025 1:39:36 PM
Metadata
Fields
Template:
Reference
Ref Doc Name
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for South Collection System - Schedule E
Non-Public Works
Yes
Division Submitted By
Design Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
OANA AVENUE <br />ELV/N AVENUE <br />w9. <br />DATE: <br />SCALE: N. /'•50'. V. /'• <br />36 <br />CHECKED: O.T. SCHU47ES <br />PROJ. ENOR.: AR, NE/NE <br />BY DATE REVISIONS <br />3? 38 <br />0. <br />39 <br />DATE: <br />Z� ■■ <br />DATE: 4. 25 .84 R.C.E 32717 <br />COUNTY OF SAN J ■ <br />BY: <br />CARDIAIAL A VENUE <br />40 4/ 42 43 44 <br />GEORGE S. NOLTE AND ASSOCIATES <br />CIVIL AND ENVIRONMENTAL ENGINEERS • PLANNERS • SURVEYORS <br />SAN JOSE • WALNUT CREEK • SACRAMENTO SAN DIEGO <br />(4081287-3400 (4151934-8060 (9161446-5020 17141278-9392 <br />- EAST STOCKTON SANITARY SEWER PROJECT - <br />SOUTH COLLECTION SYSTEM - SCHEDULE E <br />CARDINAL AVENUE STA 36+00 TO 44+00 <br />SHEET <br />OF 151 I SHEETS <br />JOB NO. <br />2181- 83- <br />
The URL can be used to link to this page
Your browser does not support the video tag.