Laserfiche WebLink
WALKER AVENUE <br />CARDINAL AVENUE <br />MARSH STREET <br />e�p <br />/2 /3 /4 /5 /6 /7 /8 /9 20 2/ 22 23 24 25 26 <br />DATE: <br />gEORGE S. NOL E AND ASSOCIATES <br />BY: Q% 1: ..;� <br />■ <br />■ <br />GEORGE S. NOLTE AND ASSOCIATES <br />CIVIL AND ENVIRONMENTAL ENGINEERS • PLANNERS* SURVEYORS <br />SAN JOSE • WALNUT CREEK • SACRAMENTO • SAN DIEGO <br />(4081287-.3400 (4151 934.8060 19161446-5020 1714 278.9392 <br />I <br />—EAST STOCKTON SANITARY SEWER PROJECT— <br />SOUTH COLLECTION SYSTEM - SCHEDULE E <br />MARSH STREET STA 12+00 TO 27+00 <br />SHEET <br />99 <br />OF 151 SHEETS <br />SCALE: N./^ 50 V. r-5 <br />DESIGNED: C. S. PARKER <br />DATE: 4.25.84 R.C.E 32717 <br />DRAWN: it. MAL/N <br />COUNTY 0 AN JOAQ IN <br />CHECKED: O. T. 3CNUL M <br />JOB NO. <br />2181-83— <br />PROJ. ENGR.:R R. NE/NEN <br />BY <br />DATE: ' Z�'B4 R.C.E. /7 6z <br />BY <br />DATE <br />REVISIONS <br />