Laserfiche WebLink
GENERAL NOTES <br />m <br />u <br />ol <br />PYC OPABS &MISS DIP /S <br />/AD/LAM ON PYAN i PROEi2E SNT. <br />A65 om PVC SINSLE SERVICES -4"D/A. <br />P/PE 4 f/TT/NOS I BWBCE SERY/CES -6"D/A. <br />6x4 1-b 16 •4 WYE <br />PLAN <br />ADAPTER AS REQD. <br />4" <br />-AOD SHADED PORT/ON <br />FOR DOUBLE SERVICE <br />BROOKS "NO. 1-5P OR CMR/STY'NO F-B <br />OR EQUAL WITH CONCRETE COVER <br />T`EXIST CURB, GUrrER ¢SIDEWALK <br />ar- <br />I I <br />ELEVATION CASE 2 <br />(TYPE X CUR5, GUTTER WISIDEWALK <br />j� <br />l <br />A A,PEA W/TN NO S/DEWALK) <br />EXIST 5/0EWVALK 10 <br />i <br />1 B.RA55 PLUG - <br />1 — EX/ST CURB Xj GUT7ER <br />� L _J I •. I III __ <br />T - <br />Q "ABS c2 PVC <br />CLEA/VD//T AG4PTOP <br />O <br />ALTERNATE HOUSE SERVICE TPT 4A85 O.e ~C <br />LOCH TIOA15 - PLUG <br />ON TEST PLUGS <br />W/TH CAP- l SAN/TARK TEG <br />` <br />�'\[� <br />�/... <br />011 <br />_ <br />S+0.02 (Yq "PER fT. J <br />12 6x e-4 WYE READ. FOR DOUBLE <br />0 <br />SERVICE ONLY <br />./ <br />/ <br />GONG TURN <br />rEE WYE <br />ELEVAT/ON CASE J <br />(TYPE D+ORE"CLIRB,GUTTERf SIDEWALK) <br />Q <br />SINGLE DOUBLE MOUSE SERVICE <br />IAMRALS <br />DATE1 4/25184 <br />SCALE: AS NOTED <br />DESIGNED <br />DRAWN: <br />CHECKED JX 7-9-OF <br />PROJ. ENGR.: S.H.C. <br />a'. <br />BY <br />DATE <br />REVISIONS <br />ADD SNORT <br />LENGTH /F <br />NEEDED <br />TEE OF SAME MA7ER/4L <br />45 SEWER MA/N <br />10'M/N <br />TYPE B` <br />GEORGE S. NOLTE AND ASSOCIATES <br />� BY: 'y"t- <br />DATE T'20-94^ 'R.C.E. NO. 77349 <br />COUNTY -OF SAN JOAOUA <br />DATE: 1'g�5W'Ow R.CE. <br />1. LEAD AGENCY FOR THIS PROJECT IS THE COUNTY OF SAN JOAQUIN, AND UPON COM- <br />PLETION, THE PROJECT WILL BE OPERATED AND MAINTAINED BY THE CITY OF STOCK - <br />TON DEPARTMENT OF MUNICIPAL UTILITIES. <br />ALL CONSTRUCTION AND MATERIALS SHALL BE IN CONFORMANCE TO THE CITY OF <br />STOCKTON-STANDARD SPECIFICATIONS AS REVISED JULY 1, 1981, THE CONTRACT <br />DOCUMENTS AND THESE CONTRACT DRAWINGS. THE CONTRACT DOCUMENTS SHALL <br />SUPERSEDE THE CITY OF STOCKTON STANDARD SPECIFICATIONS IN THE EVENT OF CON- <br />FLICT. <br />.2. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITION <br />OF PREMISES ON WHICH THE WORK IS PERFORMED AND FOR SAFETY OF ALL PERSONS <br />AND PROPERTY ON THE SITE, BOTH DURING AND OUTSIDE OF NORMAL WORKING HOURS, <br />UNTIL SUCH WORK IS ACCEPTED BY THE LEAD AGENCY. <br />3. FOR ALL EXCAVATIONS 5 FEET OR MORE IN DEPTH, THE CONTRACTOR SHALL OBTAIN <br />A PERMIT FROM THE DIVISION OF INDUSTRIAL SAFETY (1800 COFFEE ROAD, BLDG-J, <br />SUITE 55, MODESTO, CA, PHONE (209) 576-6260) PRIOR TO BEGINNING ANY EXCA- <br />VATION. A COPY OF THIS PERMIT SHALL BE AVAILABLE AT THE CONSTRUCTION SITE. <br />AT ALL TIMES. <br />4. THE COUNTY OF SAN JOAQUIN AND THE CITY OF STOCKTON ARE MEMBERS OF THE UNDER- <br />GROUND SERVICE ALERT (U.S.A.) ONE -CALL PROGRAM. THE CONTRACTOR OR ANY <br />SUBCONTRACTOR FOR THIS CONTRACT SHALL NOTIFY MEMBERS OF U.S.A. 48 HOURS IN <br />ADVANCE OF PERFORMING EXCAVATION WORK BY CALLING THE TOLL -FREE NUMBER <br />800-642-2444. EXCAVATION IS DEFINED AS BEING 18 OR MORE INCHES IN DEPTH <br />BELOW. THE EXISTING SURFACE. <br />5. THE CONTRACTOR SHALL NOTIFY ALL UTILITY AND TRANSPORTATION COMPANIES AND <br />AGENCIES INVOLVED IN THE CONSTRUCTION AREA OF THE PROJECT PRIOR TO BEGINNING <br />OF WORK. SEE SEPARATE LISTING OF UTILITY TRANSPORTATION COMPANIES AND <br />AGENCIES. <br />6. THE TYPES, LOCATIONS, SIZES AND/OR DEPTHS OF EXISTING UNDERGROUND UTILITIES <br />AS SHOWN ON THESE IMPROVEMENT PLANS WERE OBTAINED FROM SOURCES OF VARYING <br />RELIABILITY. THE CONTRACTOR IS CAUTIONED THAT ONLY ACTUAL EXCAVATION WILL <br />REVEAL THE TYPES, EXTENT, SIZES, LOCATIONS AND DEPTHS OF SUCH UNDERGROUND <br />UTILITIES. A REASONABLE EFFORT HAS BEEN MADE TO LOCATE AND DELINEATE ALL <br />KNOWN UNDERGROUND UTILITIES. HOWEVER, GEORGE S. NOLTE AND ASSOCIATES CAN <br />ASSUME NO RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF ITS DELINEATION <br />OF SUCH UNDERGROUND UTILITIES NOR FOR THE EXISTENCE OF OTHER BURIED OBJECTS <br />OR UTILITIES HWICH MAY BE ENCOUNTERED BUT WHICH ARE NOT SHOWN ON THESE <br />DRAWINGS. SEE CONSTRUCTION DOCUMENTS REGARDING UTILITY CONFLICTS. <br />7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING <br />SURVEY MONUMENTS AND OTHER SURVEY MARKERS DURING CONSTRUCTION. THE CONTRACTOR <br />SHALL NOTIFY THE SAN JOAQUIN .COUNTY DEPARTMENT OF PUBLIC WORKS OF ANY CITY, <br />COUNTY, STATE OR U.S.G.S. MONUMENTS THAT ARE IN DANGER OF BEING DAMAGED OR <br />REMOVED, TO PERMIT REFERENCING SUCH MONUMENTS BEFORE DISTURBANCE. ALL <br />SUCH MONUMENTS OR MARKERS DESTROYED DURING CONSTRUCTIN SHALL BE REPLACED <br />AT THE CONTRACTOR'S EXPENSE. <br />-EX/STIN4 SEWER <br />ITAPP/N6 SAOOLE <br />PER SPECS <br />4' LATERAL <br />—CUT 4"O/A. HOLE INTO <br />EX. SEWER W/APPAO✓fU <br />iiiilo CUrT/N6 TOOL <br />"INEOPRENE OAS.PEr <br />EX /S T/IVG SEWff TA P <br />N rs <br />GEORGE S. NOLTE AND ASSOCIATES <br />SAN JOSE • WALNUT CREEK ■ SAN DIEGO ■ SACRAMENTO <br />(408) 287-3400 (415) 934-8060 (714) 278-9392 (916) 446-5028 <br />8. CONTRACTOR SHALL NOTIFY GEORGE S. NOLTE AND ASSOCIATES 48 HOURS PRIOR TO <br />REQUESTING CONSTRUCTION STAKING. <br />9. WHENEVER THE WORK AREA IS ADJACENT TO A TRAFFIC LANE AND THERE IS A PAVEMENT <br />CUT, DITCH OR TRENCH OVER 2 INCHES DEEP, THE CONTRACTOR SHALL MAINTAIN <br />CONTROL, WARNING AND GUIDANCE DEVICES IN ACCORDANCE WITH WORK AREA TRAFFIC <br />CONTROL HANDBOOK PUBLISHED BY BUILDING NEWS, INC., THIRD EDITION, AND THE <br />CONTRACT DOCUMENTS. SEE CONTRACT DOCUMENTS FOR LOCATIONS OF SPECIAL <br />TRAFFIC REQUIREMENTS. <br />10. PAVEMENT REPLACEMENT SHALL BE 12 INCH THICK ASPHALTIC CONCRETE FOR ALL <br />TRENCHES WITHIN THE FOLLOWING STREETS AND FOR ALL TRENCH CROSSINGS OF THESE <br />STREETS: <br />FRESNO GRANT <br />CHURCH, GARFIELD TO LINCOLN UNION <br />CHURCH, STANISLAUS TO SIERRA NEVADA AIRPORT <br />LINCOLN WILSON <br />MADISON MAIN <br />CENTER COURT <br />EL DORADO WATERLOO <br />SAN JOAQUIN MINER <br />CAL IFORNLA OAK <br />STANISLAUS PARK <br />PAVEMENT REPLACEMENT FOR STREETS NOT INCLUDED IN THE ABOVE LIST SHALL BE <br />7 INCH THICK ASPHALTIC CONCRETE. <br />11. THE EXISTING SEWERAGE FACILITIES SHALL BE MAINTAINED IN OPERATING CONDITION <br />AT ALL TIMES THROUGHOUT THE CONSTRUCTION AREA. <br />ANY WATER ENTERING THE SANITARYSEWER SYSTEM TO BE CONSTRUCTED UNDER THESE <br />PLANS SHALL NOT BE DISCHARGED TO THE EXISTING SYSTEM. PLUGS MUST BE <br />INSTALLED IN EXISTING MANHOLES AS NECESSARY TO PERMIT PUMPING THE NEW <br />SYSTEM CLEAR OF WATER AND DEBRIS PRIOR TO ACCEPTANCE. CARE SHALL BE <br />EXERCISED IN LOCATING PLUGS TO AVOID INTERRUPTING SERVICE TO EXISTING <br />CONNECTIONS. <br />12. INVERT OF ALL SERVICE LATERALS ENTERING A MANHOLE WILL BE TO CROWN OF <br />EXIT PIPE UNLESS OTHERWISE INDICATED. <br />13. ALL SERVICE LATERALS SHALL HAVE 4.0 FEET OF COVER TO INVERT AT THE PROPERTY <br />LINE UNLESS OTHERWISE INDICATED AND SHALL BE LOCATED AS SHOWN ON THE CON- <br />TRACT DRAWINGS OR AS STAKED IN THE FIELD. <br />14. THE CONTRACTOR IS ADVISED THAT AT CERTAIN LOCATIONS THE PROPOSED SEWER TRENCH <br />IS IN CLOSE PROXIMITY TO OR IN CONFLICT WITH THE HORIZONTAL ALIGNMENT OF <br />EXISTING GAS MAINS. SPECIAL CARE WILL BE NECESSARY IN EXCAVATING IN THESE <br />AREAS. RELOCATION OF GAS MAINS BY PG&E CO. MAY BE REQUIRED. THE CONTRACTOR <br />SHALL COORDINATE WITH PG&E CO. TO DETERMINE IF AND WHEN RELOCATION WILL BE <br />MADE OR IF OTHER PROTECTIVE ACTION BY PG&E COMPANY WILL BE TAKEN. <br />15. THE CONTRACTOR IS ADVISED THAT AT CERTAIN LOCATIONS THE PROPOSED SEWER TRENCH <br />IS IN CLOSE PROXIMITY TO THE BASE OF EXISTING POWER POLES, WHICH MAY REQUIRE <br />THAT THESE POWER POLES BE BRACED DURING CONSTRUCTION. THE CONTRACTOR SHALL <br />-COORDINATE WITH PG&E CO. TO DETERMINE IF BRACING OR OTHER PROTECTIVE ACTION <br />IS NECESSARY. <br />THE UTILITY COMPANIES, TRANSPORTATION COMPANIES AND PUBLIC AGENCIES KNOWN <br />TO HAVE FACILITIES IN THE PROJECT AREA ARE THE FOLLOWING: <br />A. COUNTY OF SAN JOAQUIN, DEPARTMENT OF PUBLIC WORKS, 1810 E. RAZELTON AVE., <br />STOCKTON, CA 95201, AL BLEVINS, PROJECT COORDINATOR, PHONE (209) 944-2281. <br />B. CITY OF STOCKTON, DEPARTMENT OF MUNICIPAL UTILITIES, 2500 NAVY DRIVE, <br />STOCKTON, CA 95206, WALT NICHOLS, PROJECT COORDINATOR, PHONE (209) 466-5261. <br />C. ATCHISON, TOPEKA AND SANTA FE RAILWAY COMPANY, 61 SANTA FE PLAZA, <br />5200 SHEIIA STREET, LOSS ANGELES, CA 90040, Q. W. TORPIN, GENERAL <br />MANAGER, PHONE (213) 267-5400. <br />D. CENTRAL CALIFORNIA TRACTION COMPANY, 1645 CHEROKEE LANE, STOCKTON, CA <br />95207, K. J. TINKER, GENERAL MANAGER, PHONE (209) 466-6927. <br />E. SOUTMERN PACIFIC TRANSPORTATION COMPANY, P. 0. BOX 3036, BAKERSFIELD, CA <br />93385, R. J. VINCENT, ASSISTANT REGIONAL ENGINEER, PHONE (805) 327-2645. <br />F. STOCKTON TERMINAL AND EASTERN RAILROAD, 1330 NORTH BROADWAY AVENUE, <br />STOCKTON, CA 95205, B. D. SCHNEIDER, PRESIDENT, PHONE (209) 446-7001. <br />G. UNION PACIFIC RAILROAD COMPANY, 526 MISSION STREET, ROOM 500, SAN FRANCISCO, <br />CA 94105, J. T. SMITH, DISTRICT ENGINEER, PHONE (415) 982-2100 EXT 294. <br />H. PACIFIC GAS AND ELECTRIC COMPANY, 4040 WEST LANE, STOCKTON, CA 59204; <br />ERNIE ONETO, GAS SUPERINTENDENT; CARL NEILSEN, ELECTRIC SUPERVISOR (209)466-2261. <br />I. CALIFORNIA WATER SERVICE COMPANY, 1111 NORTH EL DORADO STREET, STOCKTON, <br />CA 95202, MITCHELL R. WYMAN, GENERAL SUPERINTENDENT, PHONE (209) 446-8971 <br />OR 464-8311. <br />J. PACIFIC BELL COMPANY 1313-C ROBINHOOD DRIVE, STOCKTON, CA 95207, PONCE <br />CONZALEZ, PHONE (209) 474-4734. <br />K. BIG VALLEY CABLEVISION, 4955 NORTH WEST LANE, STOCKTON, CA 95201, TERRY <br />MAST, ENGINEERING DIRECTOR, PHONE (209) 473-1800. <br />L. STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION, DISTRICT 10, P. 0. BOX <br />2048, STOCKTON, CA 95201, R. B. SMITH, PERMIT ENGINEER, PHONE (209) 948-3849. <br />-EAST STOCKTON SANITARY SEWER PROJECT - <br />NORTH COLLECTION SYSTEM - SCHEDULE D <br />DETAIL SHEET AND NOTES <br />SHEET <br />125 <br />OF 127 SHEETS <br />JOB NO. <br />2181-83-26 <br />