My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for North Collection System - Schedule D
PublicWorks
>
VAULT MAPS
>
References
>
Improvement District No. 51 - East Stockton Sanitary Sewer Project
>
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for North Collection System - Schedule D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2025 11:05:06 AM
Creation date
2/10/2025 8:58:59 AM
Metadata
Fields
Template:
Reference
Ref Doc Name
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for North Collection System - Schedule D
Non-Public Works
Yes
Division Submitted By
Design Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5EE sHBEr 26 <br />PROBABLECONCAf <br />�� <br />l <br />PAVEMENT LIMITS <br />r <br />a <br />• <br />a <br />t <br />} <br />sure <br />T. <br />0 <br />sm 0 + 4 : A040.4C AYE <br />2 00 e <br />'7.a•.2 . 8g9 v, w Wi+Y <br />MH35-L31 <br />` <br />070-19 <br />/O A70-48 .S <br />{ <br />jjs so <br />2t80 <br />J <br />I <br />7 <br />rt7 Ord -r8 <br />n7 O7O [7j <br />(a' LAT (0 I = EtEV i3 S* <br />t .» <br />j'fs�" <br />I'M <br />.,,,. [ <br />« <br />'- <br />... S✓ ,.� `q4,;. '*,.�. <br />.. <br />i <br />are^ °' <br />WILSON <br />WAY <br />ROBINDALE AVE. <br />0 I 2 3 4 ----- <br />DATE: 4116l84 <br />GEORGE S. NOLTE AIVD ASSOCIATES <br />BY: � �� a <br />■■ <br />GEORGE S. NOLTE AND ASSOCIATES <br />CIVIL AND ENVIRONMENTAL ENGINEERS • PLANNERS • SURVEYORS <br />SAN JOSE • WALNUT CREEK • SACRAMENTO • SAN DIEGO <br />408 2 ) 1714j 278-M2 <br />( ) 87-3400 (415) 934.8060 I9�6 446.5020 <br />—EAST STOCKTON SANITARY SEWER PROJECT— <br />NORTH COLLECTION SYSTEM - SCHEDULE D <br />ROBINDALE AVE. STA. 0+00 TO 4+00 <br />SHEET <br />� 5 <br />OF 127 SHEETS <br />SCALE: �'=soy s•v <br />DESIGNED: A.L. <br />DATE: 1'20.84 R.C.E NO. 17349 <br />CUUIJ?Y J� Sr'�,^' l0AQU1 <br />DRAWN: B.✓. <br />CHECKED: l <br />-- - <br />BY: <br />JOB NO. <br />2181-83— 26 <br />11C. <br />PROJ. ENGR.:S.H.G. <br />20-64 N <br />DATE: R.C.E. D.1T4G7 <br />BY <br />DATE <br />REVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.