My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for North Collection System - Schedule D
PublicWorks
>
VAULT MAPS
>
References
>
Improvement District No. 51 - East Stockton Sanitary Sewer Project
>
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for North Collection System - Schedule D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2025 11:05:06 AM
Creation date
2/10/2025 8:58:59 AM
Metadata
Fields
Template:
Reference
Ref Doc Name
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for North Collection System - Schedule D
Non-Public Works
Yes
Division Submitted By
Design Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WATERLOO RD. <br />£Z <br />�� a1 <br />r� <br />r <br />,MM' <br />N <br />SEE SHEET 9 <br />SEE SHEET 4 <br />CHEROKEE LANE <br />O �e1�a N <br />\ ap <br />U <br />i466fT ST. <br />'NE,(OKEE LN <br />� O <br />190 - tea \ <br />� <br />/ h <br />W <br />T <br />� <br />SEWER CURVE CA TA <br />R: 200' <br />C• 7" <br />47 20' 27' <br />7A 4 <br />EN STA 33+25 <br />a <br />✓A11L7 <br />50 0 50 100 <br />scoie leer <br />175-CF8` <br />/S' DES/GN DEPTH <br />-------------- <br />22 23 24 25 26 27 28 29 30 31 32 33 34 <br />DATE: 4/25/94e <br />BFOR6` S. NOLTE AND ASSOCIATES <br />By. JKy- <br />DATE:-2D'B4 R.C.E NO. 17349 <br />■. <br />■ <br />GEORGE S. NOLTE AND ASSOCIATES <br />CIVIL AND ENVIRONMENTAL ENGINEERS • PLANNERS • SURVEYORS <br />SAN JOSE • WALNUT CREEK • SACRAMENTO • SAN DIEGO <br />14081207-3400 (415(934-8060 (9161446-5020 17141278.9392 <br />—EAST STOCKTON SANITARY SEWER PROJECT — <br />NORTH COLLECTION SYSTEM - SCHEDULE D <br />FILBERT AVE. STA. 22400 TO 34+00 <br />SHEET <br />53 <br />SCALE: P�-50 h'QS'v <br />DIE SIGNED: K. C, J. <br />—- -- - <br />DRAWN: 6. /. <br />fBY.ATE <br />CHECKED: �2>-9-ev <br />---- — —. <br />.'^LINTY OF SAN 10',01i ,; <br />OF 127 SHEETS <br />JOB NO. <br />2181— 83— 26 <br />PROJ. ENGR.: S.H.G, <br />BY' <br />DATE: -ZD-84_.. P.C.E. <br />_ _ <br />REVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.