My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for North Collection System - Schedule D
PublicWorks
>
VAULT MAPS
>
References
>
Improvement District No. 51 - East Stockton Sanitary Sewer Project
>
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for North Collection System - Schedule D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2025 11:05:06 AM
Creation date
2/10/2025 8:58:59 AM
Metadata
Fields
Template:
Reference
Ref Doc Name
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for North Collection System - Schedule D
Non-Public Works
Yes
Division Submitted By
Design Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SEE SHEET 38 <br />ROBINDALE AVE. <br />_ ............. . <br />SEE SHEET 41 <br />BACON ST. <br />ibl <br />VIP - <br />A 4, <br />T --- <br />/I <br />—1 <br />2637 40 , —1""'�'� " /`� <br />I z <br />?oo - 0/ 1445 f I I ' I I <br />?S17 <br />Idsa <br />H 4-1 '�W ?89'7 2947 <br />11.9 ?937 11,9-050- 03 ")�q' <br />/12_-40 -27 06 -240- <br />+ 24 1 1 1 1 <br />IN % - <br />SL 77 fi43 It 2449 N . <br />2461 <br />All <br />r <br />"o. -2-50-03 <br />-,94 <br />I <br />Aw W <br />r <br />—17 —1 48 4 -4 <br />4 <br />o— ---------- i— <br />D <br />5 <br />8 '9 <br />/- ?4364; llog34 <br />mvituf JS9"- il <br />e Z' 640 Z3�-G7 <br />-046& ese 5 <br />lw# 59 <br />Z' <br />mg <br />M 9-� <br />,� ___, - �, v, 5r4 2a 014 p M YRA'v AVE <br />7A Iz • 6IA6 (o -A AVE 97A. 30 rSZ?, La Ra,61lV,?.4Z*1,4,_-9 ,V�m, <br />Z, <br />5 TA 4? 91.5 <br />D15'T_-1C7- 50UMOARY <br />14, 4 <br />A <br />CHEROKEE LN. SEE SHLIEr 38 <br />SEE SHEET 5 <br />50 0 50 '00 <br />z MYRxole <br />AN AVENUE <br />25 S <br />377b' 3" <br />20 400 IF 8" 6'49151&V DEPTH140 LF 0' 175 LF 8" 3' DISIGN DEPTH 8' XPTH <br />91 DE5/0 DEPTH z' 0035 <br />S 003s: <br />15 S _. 0026 5-,00.36 <br />10 <br />/2-P7,fr MH5-4 /4 *so MH 5,9_1 ls'Lro MHS,9-? 19-1- 90 A4# 59-3 23.67 W59-4 <br />5 INV. 15.09 9" IN(E) INV. 15,71 8"771RU INV. /6. 20 all TPRU INV. /7. 60 6" 7'14RU INV. 18.92 8"OUT <br />1AIV15.03 &'IA((N) <br />IAIV.)*.q8 9" OUT <br />0 <br />-5 <br />-10 <br />12 13 14 15 16 17 18 19 20 21 22 23 24 25 <br />DATE: 4125184 <br />SHEET <br />SCALE: /`L50;V& Si/ BY: GEORGE S. NOLTE AND ASSOCIATES — EAST STOCKTON SANITARY SEWER PROJECT— 59 <br />DESIGNED: kC.1 <br />DRAWN OW DATE: R.C.E��NG-1?349 CIVIL AND ENVIRONMENTAL ENGINEERS 9 PLANNERS * SURVEYORS NORTH COLLECTION SYSTEM - SCHEDULE D OF 127 SHEETS <br />CHECKED:,�z � 9-R,/ SAN JOSE -WALNUT CREEK - SACRAMENTO SAN DIEGO JOB NO. <br />PROJ. ENGR.: SHC BY: 14081287-3400 14151934-8060 19161446-5020 (7141278-9392 MYRAN AVE. STA. 12t00 TO 25+00 <br />BY —REVISIONS <br />DATE:_3�LO-A_4 R.C.E.;0�71762 PRELIMINARY REVISIONS 2181-83-26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.