My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for North Collection System - Schedule D
PublicWorks
>
VAULT MAPS
>
References
>
Improvement District No. 51 - East Stockton Sanitary Sewer Project
>
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for North Collection System - Schedule D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2025 11:05:06 AM
Creation date
2/10/2025 8:58:59 AM
Metadata
Fields
Template:
Reference
Ref Doc Name
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for North Collection System - Schedule D
Non-Public Works
Yes
Division Submitted By
Design Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5EE SHEET27 <br />STEWART STREET <br />SEE SHEET Z6 <br />JERSEY AVENUE <br />SEE SHEET 4Z <br />"Z r w <br />SANGUINETTI LANE <br />5EE SHEET /7 <br />000�14_� <br />50 0 50 100 <br />� P <br />P � <br />W <br />20 <br />y <br />W <br />h <br />a <br />FUNSTON AVENUE <br />h <br />i <br />EY/ST GR•dDE CO � STREET Q � — <br />t <br />15 �I p <br />�'�... 0), IY"STORM —_ 4 <br />..10 4291.F 8° <br />5=.0035 <br />S =. 0035 7 DE51GN DEPTH <br />82 LF 8" 9'DE5/6NDEPTH <br />_.. 5 s=.006) CONSTR DROP CO//.V. <br />/2'OfS/6NOEPlH <br />0 <br />—5 <br />W <br />V /O*2L5 MAI 27-3 <br />INV. 6.50 B" /N (N) : /NV/0.00 G"TNRU <br />/N V. 4.57 A" /N (S ) la *80.0 MH 70-2 .. . <br />/N V. 4.54 8` /N (W) S`DUT ',. /NV. /L 50 8"' OUT <br />9 10 II 12 13 14 15 16 17 18 19 <br />DATE: 42684 <br />3LiRGic S. N0LTE I SEA <br />BY: -,--A_Z <br />DATE' l'40.84 R.C.E NO 17349 <br />■ <br />lQm <br />GEORGE S. NOLTE AND ASSOCIATES <br />CIVIL AND ENVIRONMENTAL ENGINEERS • PLANNERS • SURVEYORS <br />SAN JOSE • WALNUT CREEK • SACRAMENTO • SAN DIEGO <br />(4081287-3400 (41519344MM (9161446.5020 (714127"392 <br />—EAST STOCKTON SANITARY SEWER PROJECT— <br />NORTH COLLECTION SYSTEM - SCHEDULE D <br />FUNSTON AVE. STA. 10+00 TO 19+00 <br />SHEET <br />70 <br />SCALE /"-50"H45'V <br />- <br />DESIGNED: A.L. <br />-- <br />_. <br />— --- <br />DRAWN :15.U. <br />CHECKED: 79 aev <br />_ <br />''OU!dTV JF SAN JOAQy[rJ <br />p <br />OF ��, SHEETS <br />JOB NO. <br />2181-83-26 <br />PROD. ENGR.: S.H. C. <br />BY <br />DATE: 2�'' 0-84 R.C.E. ND. II 62 <br />BV <br />DATE <br />REVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.