My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for North Collection System - Schedule D
PublicWorks
>
VAULT MAPS
>
References
>
Improvement District No. 51 - East Stockton Sanitary Sewer Project
>
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for North Collection System - Schedule D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2025 11:05:06 AM
Creation date
2/10/2025 8:58:59 AM
Metadata
Fields
Template:
Reference
Ref Doc Name
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for North Collection System - Schedule D
Non-Public Works
Yes
Division Submitted By
Design Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SEE SHEET 69 <br />SEE SHEET 17 <br />FUNSTON AVE. EMPIRE ST. <br />SANGUINETTI LN. <br />50 0 50 100 <br />WEBB STREET <br />la,9Ll- 6- <br />4/SLF B" <br />{ 8"DESIGN DEPTH 5-.0035 429LF 8" <br />10'DE5/6N DEPTH <br />5 <br />/2,DESIGN DEPTH <br />, <br />CONST DROP COW <br />0 <br />IN /0. 50 6" OUT f <br />_5 _ <br />i <br />-10 2 /0,4978—/ <br />/NV, 2.80 6" /,V (W) <br />INV. 9.63 8'"0OT 6+25.0,W76-2 <br />10+525 MH17-? <br />/NV. 8.16 &- nsRu INV.6.688"INIM <br />lNV -17/ /2" /NX $ atr <br />_ 0 I _ 2 3 4 5 6 7 8 9 10 II <br />DATE: ¢/ZS/li4 <br />„ORGE S, NOLTE iVCI lk5YXll;ItS <br />eYa�' ��i.�_ <br />DATE: I.20"84 R.C.E NO 17349 <br />. 1 <br />■ <br />GEORGE S. NOLTE AND ASSOCIATES <br />CIVIL AND ENVIRONMENTAL ENGINEERS • PLANNERS • SURVEYORS <br />SAN JOSE • WALNUT CREEK • SACRAMENTO SAN DIEGO <br />14081297-3400 14151934-8060 (9161446.5020 (1141278.9392 <br />-- <br />—EAST STOCKTON SANITARY SEWER PROJECT— <br />NORTH COLLECTION SYSTEM - SCHEDULE D <br />WEBS STREET <br />SHEET <br />7 $ <br />scA�E:N=-so;ya s'v <br />DESIGNED: A. L, <br />DRAWN; a.✓. <br />CHECKED: DZ�-s-6Y <br />um,Tv or s;1.v Eon <br />- <br />OF �Q7 SHEETS <br />JOB NO. <br />2181- 83-26 <br />PROJ. ENGR.: 5. H C. <br />BY. <br />DATE: � R.C.E.ND. 462 <br />BY <br />DATE <br />REVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.