Laserfiche WebLink
EXCAVATION <br />BACKFILL <br />T.. M ff <br />-7.4 Cr, <br />PIPE IN TRENCH <br />Roa&dy ' Emrrieni <br />Original <br />�N'` Ground_ <br />See Notes <br />I New Embankmennf ` <br />T PIPE IN NEW EMBANKMENT T <br />Height of Top of Embankment Before Excavating For Pipe <br />Shall Be As Follows - <br />For pipe �4 or less dia; 6 above top of pipe <br />For C. M.P. over 24 to 94 ' dia.. 30 above bottom of pipe <br />For C• M. P over 90t'dia: 1/3 paint of dia. above bottom of pipe <br />For R.C. P. over 24"dia - 30.,above bottom of pipe <br />For field assembled plate culvert: 1/3 point of dia above.bottom of pipe <br />Structure Backfill 6" Above Top of Pipe <br />For payment quantities excavation and backfill concrete pipe T=minimum <br />wall thickness as shown in section 45-1954 Standard Specifications. <br />For C. M. P T = 0.00 <br />PIPES, RODS Sc DEADMEN <br />Except Underdrains a Downdrains <br />EXCAVATION BACKFILL <br />Original Ground, <br />•P <br />CULVERT IN TRENCH <br />zDub raae -- <br />Top of Bo \ Roadway. <br />mbankmen't <br />Ground a• - ti' _ d <br />CULVERT IN EMBANKMENT <br />Su <br />EXCAVATION BACKFILL <br />Subgrade <br />New Embankment�� <br />Pipe ti.. Pipe <br />Flow Line <br />--4II- <br />PIPE HEADWALLS <br />Slope or <br />Subgrade <br />n <br />Roadway b <br />Excavation <br />Ortg. Ground ° - <br />Q <br />or Subgrade _ - <br />a <br />- - <br />,6 <br />•—i i I--- � i , I� D: a _ � I <br />RETAINING WALLS <br />Note: If no roadway excavation is involved at the wall <br />Structure excavation will be measured from <br />the original ground. <br />I CULVERT <br />� B <br />'VIP V <br />PLAN OF WING WALL <br />EXCAVATION Roadway <br />Embankmenl <br />I D. <br />Orig. Ground <br />t-I I r-4 ---r 1 r-- <br />SECTION A —A <br />Roadway <br />Embankment <br />t 4 Culvert <br />Culver <br />Ditch & Channel <br />'•`f I' — Excavation <br />-Raving Notch SECTION B—B <br />Subgrade <br />Roadway Embankment WI NG WALLS <br />A' a <br />GRADE TOP CULVERT <br />BOX CULVERTS EXCAVATION BACKFILL <br />qr <br />j� Embankment or Syr' •r <br />Original Ground <br />Orig. Ground Channel or Orig. Gr. 4 <br />Ditch SI Channel <br />Excavation <br />Top limit of structure excavation and backfill is original <br />ground if channel is not excavated <br />MONOLITHIC CONCRETE SLOPE PAVING <br />orig. Ground <br />Line <br />Embankment or <br />Original Ground <br />Roadway cut before <br />Bridge Construction <br />Subgrade• - 7__EmbonKrnPnt in place before ELEVATION <br />structure excav'tion is made <br />D D <br />C ;1;1 C A lily A DID <br />B j I I II I r I I <br />I <br />II I <br />g PLAN <br />Toe of Embankment <br />EXCAVATION <br />Roadway Excovatior <br />iround <br />Subgrade <br />SECTION A —A <br />BACKFILL <br />Orig. Ground <br />Orig. Ground <br />FISCAL. <br />FISCAL <br />SHEET <br />TOTAL <br />V N N, i,7Z <br />F£DEF�AL F'RQ.J E: i No. <br />N:-: <br />5H EFTS <br />CA'_I <br />EKCAVATION <br />D" <br />5=C"!10:q <br />rHL`i <br />01. <br />HL <br />L <br />Approval Recommended <br />y Assistant Stata Highway Engineer —Bridges <br />tU,1nYHighway gineer-0peratiana <br />Approved— August. 17 1953 <br />fate R+ghway Engineer <br />Civil gineerr License 208A} <br />To Accnmpony Plans Dated �Une +, '_95f <br />BACKFILL <br />Ground surface at time <br />excavation is made ° <br />••a <br />a: <br />P <br />,� <br />Orig. Groun <br />SECTION B—B <br />Side Slope <br />or Subgrade <br />Ground surface at time structure Subgrade _ <br />excavation is made -- _ <br />5 ~ n <br />. ° . Orig Ground `- <br />9.ti n � -c <br />ad \ <br />Roadway Embankment <br />"A <br />Orig. Ground ° Rdwy. Excavation <br />�. �. <br />Subgrade <br />Subgrade <br />Roadway Excavation Subgrade ° <br />- Elevation <br />SECTION C--C SECTION D—D <br />BRIDGE ABUTMENTS 8i ADJOINING WING WALLS <br />Note: It no roadway excavation is involved at the bridge LEGEND <br />Structure excavation will be measured from the <br />original ground. Structure Excavation <br />Structure Backfill <br />ROM Ditch SI Channel Excavation <br />EXCAVATION BACKFILL Roadway Embankment <br />Roadway Excavation <br />f, Note Subgrade shall be lowest Subgrade as <br />defined in the Standard Specifications <br />Embonlcment or Embankment or <br />.,p . <br />R n a Original Ground Original Ground STATE Or CALIFORNIA <br />Const. Joint �- DEPARTMENT OF PUBLIC WORKS <br />o' a DIVISION Of HIGHWAYS <br />Channel or Orig. Gr. <br />�r ,. ■ „ ,. Const. Joint <br />Ditch a Channel <br />Excavation a <br />Top limit of structure excavation and backfill is original <br />ground if channel is not excavated <br />CONCRETE SLOPE PAVING w M=='F.-�"' <br />;�„ <br />Revised 7__ 1- �8 Revi5ed 1-Z3-58 <br />Pipe. Paq Uuan-iifies Retain" Wails 5r.'Abuf• 4 Adjoining Wing Wal15 <br />Side Slope - <br />or Subgra[ <br />Rdwy. Emb. <br />Rdwy. Emb,� <br />STRUCTURE EXCAVATION AND <br />STRUCTURE BACKFILL <br />SCALE: BRIDGE: FILE: TRAWING: oaR <br />Revised-- 5-19-55 Revised:10+S4 Revised 2-19-54 A 62 <br />Keg on Retaining Walls Title Coping <br />z <br />23' <br />