Laserfiche WebLink
To the Honorable Board of Supervisors of San Joaquin County, California: <br />GENTLEMEN: We, the undersigned viewers, appointed as such by your <br />Honorable Board, on the ........ 5..... h....................day o£....... PT11.................... .............................. 190...I, in the <br />' Matter of the Petition of.,., ........... <br />for a public road, respectfully submit this, our report as such viewers, for your con- <br />sideratloti, to -wit: <br />Having been first duly sworn, to discharge our duties faithfully, we met <br />at........................................ Trac.y ..... ;............. ................................... .......... .....-.......... _.... ....._................ ....... ,... ...,............ ,.:.............. ............. on <br />the...9..... th...................day of. ....... -April ............ ..._...........I ........... 190.4.. at..,...1.0.............. ....... o'clock ... a .... . m. <br />We notified the resident owners, or agents of ,the owners, of the lands, of the <br />proposed route. <br />We then viewed `and laid out the proposed new road over the most practical <br />route, and over the same lands mentioned in the Petition. <br />[Section 2686 of the Political Code of the State of California, subdivision one, requires as follows: <br />The course, terminii, length and probable cost of construction of the proposed road.] <br />We find the course, terminii and length of said proposed road to be as follows: <br />Commencing for the center line at a poimt on the section line <br />between sections 28. and 29 of T. 2 S. R.3' E. M. D.B. &,. M. and 62 feet <br />South of the South line of the right of way of the S.P.R.R, <br />running between Tracy and Bethany, and run thence South on <br />the section line between sections 28 & 29 Z2 & 33 T.�2 S. R.5 E. <br />and sections 4&5, 8&9, 16&17, 2o& 21, of T.3 S.R.5 E. <br />a distance of five miles 4053 feet to the convnon corner to secs. <br />20, 21, 28& 29 T. 3 S. R. 5 E.� M. D.B &. M. <br />The probable cost <br />of construction of the <br />road <br />above <br />described is , the sum of <br />^5 ?- !70--. , <br />including the purchase <br />of the <br />right <br />of way. <br />76 <br />