My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PW-ENCUTIL-2500879
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2025
>
PW-ENCUTIL-2500501 thru PW-ENCUTIL-2501000
>
PW-ENCUTIL-2500879
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 7:45:52 AM
Creation date
4/3/2025 7:45:36 AM
Metadata
Fields
Template:
Permits_Development
DocName
PW-ENCUTIL-2500879
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2025
Location
Lower Sacramento Rd., alley between Academy St. & E. Carolina St., Lilac St., and alley between Olive St. and Chestnut St., Lodi,CA
Type - Permit Process
CCTV inspection of sanitary sewer pipes
Address
18503 N. HWY 88, Lockeford,CA 95237
Application
Subtronic Corporation
Project #
110005
Type
Utility Encroachment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
X:\ENCROACHMENTS\General Provisions (Encroachment Permits)\Winter Weather Provisions.docx <br /> SPECIAL PROVISIONS <br /> Winter Weather Utility Work <br />__________________________________________________________________________________________ <br />__________________________________________________________________________________________ <br />1. SUPERVISION: The utility company (permittee) shall furnish full-time supervision of all work to insure <br />compliance with the permit provision. <br />2. START OF WORK: No work within the County right-of-way shall be started until the utility company <br />representative has made an evaluation of weather conditions and has determined the work can be <br />accomplished under the provisions of the permit. <br />3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement outside the area of work, <br />and if inadvertently tracked onto the road travel way shall be removed immediately. <br />4. DAILY RESTORATION: Private driveways and road intersections shall be restored daily. <br />5. WEATHER-TIGHT CONDITIONS: All trenches shall be filled and compacted, ditches and other <br />drainage facilities regarded and opened, and the entire work area restored to weather-tight condition prior to <br />any rain.
The URL can be used to link to this page
Your browser does not support the video tag.