Laserfiche WebLink
PS-2004093 - Rider #1 April 2, 2025 <br />SPECIAL CONDITIONS FOR <br />LAMMERS WATER MAIN <br />ENCROACHMENT PERMIT <br /> <br />1. Placement of temporary traffic control devices, including striping, an operable temporary traffic <br />signal, K-rails, and associated signage, shall all be completed by 7:00 AM. <br /> <br />2. Upon completion of any jack and bore operation, the removal of temporary traffic control devices <br />and the restoration of the original traffic configuration shall also be completed by 7:00 AM. <br />3. Bore pits and any other removed pavement sections associated with the jack and bore operation <br />shall be restored per County Standard R-29, “Trench Cut Policy”. Temporary cutbacks will not be <br />allowed <br /> <br />4. Two weeks prior to rolling lane closures, CMS boards shall be updated to notify the traveling <br />public of upcoming lane closures, dates of lane closures, and times of lane closures. Rolling lane <br />closures may not start before 8:30 am. <br /> <br />5. The temporary traffic signal timings are shown in the attached “Temporary Traffic Signal Timings” <br />document. Field Engineering staff shall be notified of any modifications to the timings listed. <br />Field Engineering staff shall be notified of any signal outage immediately. <br /> <br />6. Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br />Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br />plated. During working hours, two-way traffic control shall be maintained with one lane open and <br />appropriate flaggers. The contractor shall submit traffic control plans for all signing, detours, and <br />any lane closure impacting County right-of-way. Traffic control plans shall be submitted two <br />weeks prior to the closure date. <br /> <br />7. Access to all properties shall be maintained at all times except when work is occurring at the <br />access point. Minimal delays will be allowed to provide access within the work zone area. <br />Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br />contractor shall be replaced with in-kind or better materials. <br /> <br />8. Residents and businesses shall be notified in writing, as approved by the County, 48 hours in <br />advance of any impacts to their access. <br /> <br />9. Any areas where parking is to be restricted shall have signs noting the restrictions in place at <br />least 48 hours in advance. <br /> <br />10. School Buses shall be passed through the work zone with minimal delays. <br /> <br />11. Existing fences shall not be removed without written consent of the property owner. Such consent <br />shall be submitted to the County prior to the removal. Fences removed shall be restored with in- <br />kind or better materials. Restored fences shall not encroach into County right-of-way. <br /> <br />12. Work shall not be permitted within the San Joaquin County right-of-way between November 1 and <br />March 31 without prior authorization from the San Joaquin County Department of Public Works <br />Field Engineering Division, contact them at 209-953-7421.