Laserfiche WebLink
LOAD SCHEDULE- PHASE 1 <br /> SWITCHBOARD SB-1 LOAD SCHEDULE v_1.31.2 <br />CKT NO <br />TRIP <br />AMPS DESCRIPTION <br />VOLT-AMPS VOLT-AMPS <br />DESCRIPTION <br />TRIP <br />AMPS CKT NOABCABC <br />1 600 SUPERCHARGER #1 129,000 --129,000 --SUPERCHARGER #2 600 2 <br />3 ""-129,000 --129,000 -""4 <br />5 ""--129,000 --129,000 ""6 <br />7 600 SUPERCHARGER #3 129,000 --129,000 --SUPERCHARGER #4 600 8 <br />9 ""-129,000 --129,000 -""10 <br />11 ""--129,000 --129,000 ""12 <br />13 600 SUPERCHARGER #5 129,000 --129,000 --SUPERCHARGER #6 600 14 <br />15 ""-129,000 --129,000 -""16 <br />17 ""--129,000 --129,000 ""18 <br />19 600 SUPERCHARGER #7 129,000 --129,000 --SUPERCHARGER #8 600 20 <br />21 ""-129,000 --129,000 -""22 <br />23 ""--129,000 --129,000 ""24 <br />25 15 LIGHTING 375 --50 --MONITORING 15 26 <br />27 -50 -""28 <br />29 30 <br />31 32 <br />33 34 <br />35 36 <br />TOTALS <br />PHASE A B C <br />PHASE 1 APP. POWER 516 kVA 516 kVA 516 kVA <br />PHASE 1 CURRENT 1862 A 1862 A 1862 A <br />FUTURE TOTALS <br />FUTURE TOTAL APP. <br />POWER <br />1032 kVA 1032 kVA 1032 kVA <br />FUTURE TOTAL <br />CURRENT <br />3724 A 3724 A 3724 A <br />AC CIRCUIT SCHEDULE <br />CIRCUIT #CONDUCTOR <br />METAL UON <br /># OF <br />CONDUITS <br /># PHASE <br />CONDUCTORS <br />PER CONDUIT <br />PHASE <br />CONDUCTOR <br />SIZE <br />EGC LVDC SIGNAL WIRE DC MID <br />MAX <br />CIRCUIT <br />LENGTH <br />WIRE <br />TYPE <br />CONDUIT <br />TYPES <br />MIN <br />CONDUIT <br />SIZE (IN) <br />DC-POST** <br />(FACTORY WIRED)AL 1 4 350 KCMIL <br /> AWG 2/0 (AL) <br />OR <br />AWG 1 (CU) <br />-TESLA <br />PROVIDED -330'XHHW-2 <br />(1000V) <br />PVC, RMC, <br />EMT 4 <br />DC-POST-V4** <br />(FACTORY WIRED)AL 1 4 600 KCMIL AWG 2/0 (CU)(2) AWG 6 (CU)TESLA <br />PROVIDED -330'XHHW-2 <br />(1000V) <br />PVC, RMC, <br />EMT 4 <br />DC-BUS AL 1 4 600 KCMIL 1/0 AWG (CU)--3/0 AWG 900'XHHW-2 <br />(1000V) <br />PVC, RMC, <br />EMT 3.5 <br />MP-RS*CU 1 2 AWG 14 ----20'THWN-2 PVC 1 <br />DC CIRCUIT SCHEDULE <br />CIRCUIT #CONDUCTOR <br />METAL UON <br /># OF <br />CONDUITS <br /># PHASE <br />CONDUCTORS <br />PER CONDUIT <br />PHASE <br />CONDUCTOR <br />SIZE <br />NEUTRAL <br />CONDUCTOR <br />SIZE <br />EGC SSBJ <br />MAX <br />CIRCUIT <br />LENGTH <br />WIRE <br />TYPE <br />CONDUIT <br />TYPES <br />MIN <br />CONDUIT <br />SIZE (IN) <br />AC-PSU AL 2 3 500 KCMIL 500 KCMIL <br />AWG 2/0 (AL) <br />OR <br />AWG 1 (CU) <br />-300'XHHW-2 PVC, RMC, <br />EMT 4 <br />AC-PSU-SP*AL 2 3 500 KCMIL 500 KCMIL <br />AWG 2/0 (AL) <br />OR <br />AWG 1 (CU) <br />-300'XHHW-2 PVC, RMC, <br />EMT 4 <br />AC-SPR <br />(FACTORY WIRED)AL 2 3 500 KCMIL 500 KCMIL 1 AWG (CU)--XHHW-2 PVC, RMC, <br />EMT 4 <br />AC-MP*AL 3 3 600 KCMIL -250 KCMIL (AL)-20'-0"XHHW-2 PVC 4 <br />AC-GXR*AL 2 3 250 KCMIL 250 KCMIL AWG 01 --XHHW-2 PVC 3 <br />AC-PV*AL 2 3 250 KCMIL 250 KCMIL AWG 01 -20'-0"XHHW-2 PVC 3 <br />AC-IN-50*-1 -------PVC, EMT 2 <br />AC-IN-60*-1 -------PVC, EMT 2 <br />AC-LGT CU 1 1 12 AWG 12 AWG 12 AWG -150'THWN-2 PVC, RMC, <br />EMT 1 <br />* CONDUCTORS TO BE INSTALLED UNDER SEPARATE PERMIT, <br />CONDUITS INSTALLED UNDER THIS PERMIT. <br />**"DC-POST" CIRCUIT APPLIES TO "V3" TYPE CHARGING <br />POSTS AND "DC-POSTS-V4" APPLIES TO "V4" TYPE CHARGING <br />POST. THESE CIRCUITS ARE FACTORY-WIRED, SO CIRCUIT <br />WILL DEPEND ON WHICH PSU IS DEPLOYED ON SITE. <br />NOTE: GRAYED OUT VALUES ARE FOR PHASE 2 <br />DESIGN. <br />1"12"0 <br />PROPRIETARY AND CONFIDENTIAL <br />ABCDEFGH <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />DATENO.REVISIONORIGINAL SIZE 24"X36" <br />SHEET SIZE ARCH "D" <br />3500 DEER CREEK RD. <br />PALO ALTO, CA 94304 <br />(650) 681-5000 <br />3/27/2024AARCH SITE PLAN COMMENTS10/18/2024BCIVIL AND BUILDING COMMENTS14700 THORNTON RDLODI, CA 95242, USLOAD <br />SCHEDULES <br />E-202 <br />REV: B IFP <br />MVANDERWALPLOT DATE: 10/25/2024 9:24 a. m. <br />JB-9528024TESLA SUPERCHARGER_LODI, CAPHASE 1: 16 SUPERCHARGERS3AL <br />3 <br />XHHW-2 <br />XHHW-2