My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PW-ENCDRWY-2403198
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2024
>
Driveway Permits
>
PW-ENCDRWY-2403001 thru PW-ENCDRWY-2403500
>
PW-ENCDRWY-2403198
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 8:47:37 AM
Creation date
4/7/2025 8:45:30 AM
Metadata
Fields
Template:
Permits_Development_Driveway
DocName
PW-ENCDRWY-2403198
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2024
Location
N. Thornton Road near Capitol Ave.
Driveway Type
Commercial
Address
3500 Deer Creek Road, Palo Alto, CA 94304
Application
Tesla
Project #
PWP110005
Type
Driveway Encroachment
Text box
ID:
1
Creator:
Created:
4/7/2025 8:46 AM
Modified:
4/7/2025 8:46 AM
Text:
10/30/2024
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MAIN SWITCHBOARD SB-1, MCB 4000A ZPOWER <br />PHASE GROUND <br />DESIGNATION FRAME AMPS 4,000 4,000 <br />AIC kA 100 100 <br />FRAME MFR EATON EATON <br />TYPE MODEL MPS-C40 MPS-C40 <br />TRIP UNIT <br />SENSOR AMPS 4,000 4,000 <br />PLUG AMPS 4,000 4,000 <br />DESCRIPTION LSI, 4000AF GF, 800-6000AF <br />TYPE/MODEL MAGNUM PXR20 MAGNUM PXR20 <br />TRIP UNIT <br />SETTINGS <br />(4000A TRIP) <br />LONG DELAY PICKUP (lr)1 (4000A) <br />LONG DELAY TIME (tr)4s <br />SHORT DELAY PICKUP (lsd)2 (8000A) <br />SHORT DELAY TIME (I2t)0.1s <br />INSTANTANEOUS PICKUP (li)4 (16000A) <br />GROUND FAULT PICKUP (Ig)0.3 (1200A) <br />GROUND FAULT DELAY TIME (tg)0.5s <br />SUPERCHARGER CABINET <br />BREAKERS <br />PD-3 THERMAL-MAG TRIP UNIT <br /> (600A TRIP) <br />INSTANTANEOUS (li): 5 (3000A) <br />BREAKER SETTINGS <br />E501.100 REBAR UFER GROUNDING DETAIL RC NTS <br />REBAR CAGE CONNECTED <br />BY REBAR TIES <br />CONCRETE <br />EQUIPMENT PAD <br />ATTACH GEC OR COMBINED <br />GEC/EGC TO 20' OF <br />CONTINUOUS OR SPLICED <br />REBAR USING LISTED REBAR <br />GROUNDING CONNECTOR <br />GEC OR COMBINED <br />GEC/EGC FROM GROUND <br />BAR IN EQUIPMENT <br />CONCRETE-ENCASED ELECTRODE FOR <br />CAST-IN-PLACE PADS ONLYB E501.1208 GROUNDING DIAGRAM RA <br />BREAKER SETTINGS - SWITCHBOARD "SB-1" <br />E501.1208 GROUNDING DIAGRAM RA <br />GROUNDING DIAGRAM <br />·REFER TO ONE-LINE DIAGRAM FOR <br />SPECIFIC CIRCUIT IDENTIFIERS <br />BETWEEN EQUIPMENT. <br />·REFER TO AC & DC CIRCUIT <br />SCHEDULES FOR NEUTRAL/GROUND <br />SIZING PER CIRCUIT. <br />NOTES <br />LEGEND <br />IRREVERSIBLE SPLICE OR <br />CRIMP PER NEC 250.64(C) <br />NEC 250.52(A)-COMPLIANT <br />GROUNDING ELECTRODE <br />PRIMARY OR SECONDARY <br />COMMON TERMINAL, AS <br />APPLICABLE <br />G <br />TERMINAL ON NEUTRAL <br />OR GROUND BUSBAR <br />N <br />O <br />NEUTRAL BUSBAR <br />GROUND BUSBAR <br />G <br />TO ADDITIONAL <br />POSTS <br />(N) EGC, TYP. <br />"DC-POST", "DC-POST-V4" <br />GN <br />(N) 3/0 CU GEC, <br />SEE DETAIL B. <br />(N) EGC, TYP. <br />"AC-PSU" <br />GN <br />MAIN BONDING JUMPER <br />(FACTORY-INSTALLED) <br />TO OTHER <br />SUPERCHARGER <br />CABINET(S) <br />TO UTILITY <br />TRANSFORMER <br />GROUNDED CONDUCTOR <br />(NEUTRAL) AND CONNECTIONS <br />PER UTILITY REQUIREMENTS <br />(N) MAIN SERVICE <br />EQUIPMENT <br />(N) SUPERCHARGER <br />CABINET, TYP. <br />(N) SUPERCHARGER <br />POST, TYP. <br />G <br /> FUTURE MEGAPACK "MP-2" <br />(UNDER SEPARATE PERMIT) <br />FUTURE EGC, <br />TYP. "AC-MP" <br />(N) NEUTRAL, TYP. <br />"AC-PSU" <br />(N) 3/0 CU GEC, SEE DETAIL B. <br />ENSURE THE GEC CONDUCTOR <br />CONNECTION IS PROVIDED <br />NOW FOR FUTURE MEGAPACK <br />TO OTHER <br />SUPERCHARGER <br />CABINET(S) <br />(N) EGC, TYP. <br />"DC-BUS" <br />N <br />FUTURE GROUNDING <br />TRANSFORMER <br />"GND-XR" (UNDER <br />SEPARATE PERMIT) <br />FUTURE EGC <br />AND NEUTRAL, <br />TYP. "AC-PV" <br />FUTURE NEUTRAL, <br />TYP. "GND-XR" <br />FUTURE EGC, <br />TYP. "GND-XR" <br />G <br /> FUTURE LINE REACTOR <br />"LR-1" (UNDER SEPARATE <br />PERMIT) <br />G <br />FUTURE EGC, <br />TYP. "AC-MP" <br />A <br />FUTURE NEUTRAL, <br />TYP. "AC-PV" <br />FUTURE EGC, <br />TYP. "AC-PV" <br />1"12"0 <br />PROPRIETARY AND CONFIDENTIAL <br />ABCDEFGH <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />DATENO.REVISIONORIGINAL SIZE 24"X36" <br />SHEET SIZE ARCH "D" <br />3500 DEER CREEK RD. <br />PALO ALTO, CA 94304 <br />(650) 681-5000 <br />3/27/2024AARCH SITE PLAN COMMENTS10/18/2024BCIVIL AND BUILDING COMMENTS14700 THORNTON RDLODI, CA 95242, USELECTRICAL <br />DETAILS <br />E-502 <br />REV: B IFP <br />MVANDERWALPLOT DATE: 10/25/2024 9:25 a. m. <br />JB-9528024TESLA SUPERCHARGER_LODI, CAPHASE 1: 16 SUPERCHARGERS
The URL can be used to link to this page
Your browser does not support the video tag.