My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PW-ENCUTIL-2501415
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2025
>
PW-ENCUTIL-2501001 thru PW-ENCUTIL-2501500
>
PW-ENCUTIL-2501415
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 7:58:34 AM
Creation date
4/10/2025 7:57:53 AM
Metadata
Fields
Template:
Permits_Development
DocName
PW-ENCUTIL-2501415
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2025
Location
1621 Report Ave. & 2806 Waterloo Rd.
Type - Permit Process
TCP Needed for Shoulder Closure to Pole #01625 Acccess on John Ct. & Lane Shift to MH#327 Access on Waterloo Rd. AT&T Job #A057M42
Address
1445 Van Ness Ave., Fresno
Application
AT&T California
Project #
730079
Type
Utility Encroachment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for -2- <br />ENCROACHMENT PERMIT <br />12. Above ground vaults, panels and/or other similar facilities will be allowed within the right-of-way if <br />located as far to the outside edge as possible. Utility vaults shall be located a minimum of 4-0 <br />from edge of pavement. <br />13. County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. All standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br /> <br />14. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br />free of dirt, mud and debris during construction activities. The contractor shall provide daily, and <br />as determined to be necessary by County inspectors, street sweeping using a modern <br />mechanical or vacuum-assisted street sweeper. <br /> <br />15. The contractor shall not conduct construction operations in rain or heavy fog conditions.
The URL can be used to link to this page
Your browser does not support the video tag.