Laserfiche WebLink
PW-ENCUTIL-2501274 April 9, 2025 <br />SPECIAL CONDITIONS FOR <br />PG&E – SAN RAFAEL AVE. – PM# 35593940 <br />ENCROACHMENT PERMIT <br /> <br />1. Maintain traffic controls for all roads. Two-way traffic shall be maintained during non-working <br />hours with excavated areas backfilled or plated. <br /> <br />2. San Rafael Ave. – Full road closure allowed for 1-day(s) on 6/26/2025 from 7:00 AM to 3:30 PM, <br />opened nightly during non-working hours. <br /> <br />3. Applicant shall notify and coordinate with all emergency services (fire, police, etc.), local schools <br />and the local postmaster a minimum of seven (7) days prior to the road closure. <br /> <br />4. Permittee/contractor MUST email County Field Engineering at PWroadclosure@sjgov.org, a <br />minimum of (2) business days prior to start of road closure with location, date, duration, and <br />emergency contact information (name and phone number). <br /> <br />5. Access to all properties shall be maintained at all times except when work is occurring at the <br />access point. Minimal delays will be allowed to provide access within the work zone area. <br />Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br />contractor shall be replaced with in-kind or better materials. <br /> <br />6. Residents and businesses shall be notified in writing, as approved by the County, 48 hours in <br />advance of any impacts to their access. <br /> <br />7. Any areas where parking is to be restricted shall have signs noting the restrictions in place at <br />least 48 hours in advance. <br /> <br />8. All destroyed or obliterated pavement markings must be replaced in kind by the permittee. Typical <br />pavement markings include but not limited to lane lines, centerlines, stop and stop ahead <br />legends, limit lines, raised pavement markers and miscellaneous delineators. <br /> <br />9. The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted. Prior to the start of construction, survey monuments that potentially may <br />be disturbed shall be located and referenced by a Licensed Land Surveyor, and a Corner Record <br />filed with the County Surveyor. Any Survey Monuments disturbed during the course of <br />construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br />with the County Surveyor. (Land Surveyors’ Act Section 8771) <br /> <br />10. County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. All standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br /> <br />11. The contractor shall not conduct construction operations in rain or heavy fog conditions.