My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C590 - C620
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer C
>
C500 thru
>
C590 - C620
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 11:50:10 AM
Creation date
4/16/2025 10:18:16 AM
Metadata
Fields
Template:
Large Plans - LP
Project
Project Plans for Cardinal Avenue Improvements
Limits
Main Street to Weber Avenue
Year
2005
Project Engineer
Jerry Violett
Roads Worked
Cardinal Ave.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
C590 - C620
Type
Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ON <br />133HS <br />0 <br />83MV8(l <br />30 <br />Base Bid xV, <br />SANITARY SEWER CONNECTION DETAILS. <br />Offset Rim Lateral PVC Pipe Invert <br />No. Type I Station Grate <br />Left I Right Elev. Diu. l Length slope In I out I I I I W 1 <br />--- Lamphole 32+26 31.0 Match X LU <br />Exist. <br />K <br />6' 110' 1.00% <br />SS603 SS M/H 31+17 38. 0' Match 18. 62' X Place �O L.F. CA <br />Pavement 12' Diih, R,C,P, <br />Note: Exact Location of Lamphole and Pipe Alignment to be determined by x i I (Cl. IVY open pipe <br />the Resident Engineer and the City of Stockton Representative. <br />1conne to exist. <br />II 1 lateralldrai i <br />X <br />46 <br />X X ----------- J1111111161,44AIII 011MAIII <br />x )K x X <br />IC <br />c7RP <br />S603 <br />0 j <br />+ <br />60'l CARDINAL <br />Z <br />4_0 <br />--SD-SD-SD-SD-SD SD-SD-SD-SD-SD- <br />1,31+00 <br />1 <br />[--SS-SS-SS-SS30+00 -Ss-ss-ss-ss-ss-SS-SS- Ss_SS 1 1 SS -SS -S60 <br />C: S 601 <br />_j (1) - - - - - - - - - - - - - - <br />7- <br />.A-- to L CB602 <br />G - <br />0 <br />X -*"X X CE16 <br />B609 <br />STORM DRAIN CONNECTION DETAILS FB605 <br />Rim Latera <br />Offset I Pipe Invert LO <br />No. Type Station I Grate + <br />Left Right Elev. Dia. Length Slope In out CB <br />CB603 18* SDI 30+94 53.0 27. 17' 12' 61' 0.25% 24. 86' <br />SD601 <br />SD M/H 1 <br />31+22 <br />0. <br />5' <br />29. 50' 1 1 24.71 - <br />CB608 <br />18' SDI <br />31+04 <br />54. <br />0' 1 <br />29. 13' <br />1 <br />26.38'1 <br />12- <br />13' 1 <br />0,25% 1 <br />CB605 <br />Curb SDI <br />31104 <br />1 41.0'1 <br />28. 76' <br />1 26.35 <br />CB610 <br />18- SDI <br />31+39 <br />1 53.0' <br />29.12'1 <br />26. 40' <br />12" <br />12' <br />0.25% <br />C8618 <br />Curb SDI <br />31+39 <br />4 1. <br />0' <br />28. 78' <br />1 <br />26. 37' <br />at <br />+0 nr-W C_?)(;0I8 an'A <br />;5. <br />If j <br />107' <br />Conform Transition for Base Bid <br />(In the event only Base Bid is awarded, <br />,* II conform at Sta 31+90) <br />Additive Bid Alternate A <br />new G& V <br />+ <br />en <br />U <br />0 <br />00 <br />+ <br />r <br />Cd <br />+ <br />0 <br />X 1" 0 <br />r ) A <br />i <br />X <br />I X <br />(A <br />LU <br />X <br />(A <br />W <br />X <br />X <br />X <br />X <br />LA <br />I � <br />U) <br />L <br />� I <br />*CB 06 0 <br />0 un _j _Lr) -X-X-X-X-x- <br />L0 �k 'AI 0�� X L11111- X III IN 111111111 + L -x-x-x-x-x-X-X-x <br />_X <br />+ <br />-Ri6ht-of-Way <br />4A <br />"'Construction CB 15 W _42* CB614 <br />6# Center Line <br />Center Line <br />Ln <br />CM60 + <br />CB 16 Ln <br />L 4 <br />W------- VI <br />W w Y� W <br />w ------- L W W 6 <br />W2 it <br />A I Ln <br />Ns LA AV "N E 41 <br />Q) <br />D603 <br />L ,I I /7 -C <br />8 1 1 X= - - -- --- 35+00 V) <br />-ss-ss-ss-ss-ss-ss-ss-ss-ss-ss-ss-I <br />0 --- ss 33 P-OG-ss-ss-ss-ss--ss-SS-Ss---(M/ Ss C: <br />f-ft SS_SS -ss- SS -ss-ss- <br />SD602 32+00 SS602 <br />% Q) <br />fs Cc <br />V) <br />- - - - - - - - - - <br />-4� <br />-- - - - - - - - - - - - - - - <br />(�EI617 <br />G __4Q _G G__ G In. L <br />V <br />G IS G[- G G, G G <br />IM <br />\' � � ;�B6,i2'l � � I - ___ .- _ - - -...- -- I I H <br />LI.L=,�iiiiiiiiiiiiiipL--�X-X-X-X-x-x-x-x-x-x x x _x x_x_X_x_x_xi <br />-X-X-X-,A-x Lm 0 0, �11 x x x x-x-x-x <br />X X�x X �_X-x <br />x-x-xl---X-x- <br />*CB614 STORM DRAIN CONNECTION DETAILS. <br />tg <br />.0 /, Offset Rim / Lateral Pipe I Invert STORM DRAIN CONNECTION DETAILS, <br />X No. Type Station Grate Offset Rim Main Drainage Pipe Invert <br />Place 8 L.F. Left Right Elev. Dia. Length Slope In Out No. Type Station <br />Curb SDI 34f36 2 1. 0Left Right <br />' 28,85' 25. 85' Elev. Dia. Length Slope In out <br />SD602 18" Dia, R.C.P. (Cl. IV) CB613 I � , <br />B Plug Pipe End 12' 28' 0.25% SD701 S 1.9 .. D M/H 36+43 _Vre 40 25. 19 <br />0 4 <br />SS <br />Invert 0 M/H=26.84', S=0,08% 18, 298' 0.03% <br />CB614 18* SDI 34+12 35.0, 28. 25. 7 25. 68' <br />(in the event only Base Bid 8, 12' I 48' 0.25% I SD603 SD M/H 33+46 0.6 25. 10' 25. 10' <br />X L�ls awarded) 18- 187' 0.03% <br />0 28. 18' 25. 56' 25. 53' <br />CB615 18' SDI 33+64 35. SD602 SD M/H 31+60 0.3, kvq. 1 'r ' 25. 04' <br />I j 1 12' 27' 0.25% 1 <br />CB616 Curb SDI 33+41 21.0, N <br />1 ' 25. 46' 25. 37' <br />-7 28. 64Sta. 31+60 12' 22' 0.2 r7ECORD DRAW <br />Construct Manhole •RV <br />i (7orrections 041-- e <br />SD603 SD M/H 33+46 0. 6' 1 I�q, <br />CB617 J Curb SDI 33+46 21. 0' 1 28. 63' 25. 63' P,11- r.hanges Rv&' <br />1 <br />12' 22' 0.25% <br />1 <br />25. 58' Any Person Using This Drawing Should Verity <br />SD603 I SD M/H 33+46 1 0.6 29. 25' 1 <br />CCU (0 1 <br />A111 k4offnation Ely inspecting 1116 OIL" W1 VVIVI rk <br />31 +17 (8' Rt.) <br />*C6604(Lt.) Exist. M/H SS601 Exist. Center Line Original Ground (Lt.) -original Ground (Rt.) Construction <br />B61 1 (Rt.) - - - - - - - - - - - <br />*CB609(Rt.) - <br />- - - --- ------ <br />1 U0 <br />:i <br />CB606(Lt.) itH M/H SD603 <br />it <br />_ _ _ - I - <br />- - - - - - - - <br />- - - - - - - - - - - - - - - - - ______ <br />CV <br />it it it L0 <br />it <br />- - <br />it it <br />C6614(Lt.) Z <br />V) <br />C8605 Larnphole 4-a � 11 [Exist. Gas Main <br />(Rt.) 11 <br />Exist. Water Main II C8618 C8613<Lt.) <br />-Flow Line (Lt. & Rt. CB616Q�Q <br />-7-777-7- �--777-7-71 7 <br />(Rt.) <br />t _ CB608(R ]-77 <br />------- �77-, --7777-7 _�77-7--77- <br />____L , , CB615 <br />7 7 7 E j-, 7j:77`7,_I_!-,---_'__,LL <br />77"<� - - - - - - <br />I I it J Q) <br />'I r it --------------------- -------- ------- ---------------------------------� <br />- - - --------------- ---- --- --------------------------- <br />- - - - - - - - - - - - Z: IV[ cz V) <br />it <br />4-1 -------- ----- <br />H tTygl -- ------------------------------ <br />---------------------------------------------------------------------------- ------ ----- -- --- ------------------------------------------- ------ ------------------------------ <br />--- ---------------------- <br />CB610(Rt.) S:!,003% <br />L <br />0 S:�0037. <br />LO 0,25%_ - -- --- - <br />G. <br />18"0 RCP CL-IV - - - - - - - - - <br />C8603(Lt.) I Sanitary Sewer t <br />Exist. 8" Di <br />Exist. 24' Dia. i i I Exist. 8" Dia. <br />CB617(Rt.) <br />Sanitary Sewer <br />6 6 Storm Drain <br />-+- Z 12" 0 R.C.P.- <br />GO (Class IV) i 131+35± <br />Exist. 42" Dio. Exist. M/H S602 <br />Water Main <br />U <br />I A20 <br />--,Exist. 8" Dia. I 6 Dia. PVC Pipe <br />Sanitary Sewer <br />ij <br />Inv. Ele.=18.62 <br />M/H SD602 <br />li <br />31+22 (@ CL) <br />M/H SD601 <br />_SS603 Exact locations to be determined by R.E. and <br />Representatives of the City of Stockton. <br />15 <br />STA <br />DRAWN BY <br />Y, ?,I"& <br />C)TIA&WHI <br />FILE NAME <br />30 <br />31 <br />DATE <br />PROJECT ENGINEER <br />DATE <br />CHEC-KED <br />DATE <br />APPROVAL RECOMMENDED <br />DATE <br />8105 <br />; <br />8/11/os- <br />DRAWER. <br />SHEET NO <br />ACAD <br />REVISIONS <br />DATE <br />A• <br />If <br />C <br />00% <br />4 <br />E:\Projects\2006\Cardinal\Plans\FinaI Plon\Utility Plan & Profile <br />3 11 2 33 <br />SCALE: 1 "=20' Horizontal UTILITIES <br />COUNTY OF SAN JOAQUIN 1 of =2' Vertical PLAN AND PROFILE <br />34 35 <br />CARDINAL AVENUE IMPROVEMENTS <br />(Main Street to Weber Avenue) <br />30 <br />25 <br />20 <br />15 <br />ST4 <br />SHEET TOTAL <br />NO. SHEET` <br />20 31 <br />Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.