Laserfiche WebLink
DEPARTMENT OF PUBLIC WORKS <br />P.O. BOX 1810-1810 E. HAZELTON AVENUE <br />STOCKTON, CALIFORNIA, 95201 <br />(209) 468-3000 <br />FAX # (209) 468-9324 <br />UTILITY ENCROACHMENT PERMIT <br />To: AT&T California <br />1445 Van Ness Ave <br />Fresno <br />Permit No: PW-ENCUTIL-2500620 <br />Date Issued: <br />Start Date: 02/24/2025 <br />Exp. Date: 02/12/2025 <br /> Project No. 730079 <br />Extended To: <br />UE/CR/PM NO: A02VNQG <br />Encroachment Type: FROM (E)SB#677 DIRECTIONALBORE AND INSTALL ±580' (1)-2" CPC TO NEW <br />FLOWER POTS IN VARIOUS LOCATIONS. INSTALL (2) NEW FLOWER POTS (9"X12"). REMOVE AND <br />RESTORE OF 3' X 5' (15 SQ FT) CONCRETE SIDEWALK. <br />TCP NEEDED FOR LANE SHIFT TO ACCESS MH #5 ON THORNTON RD., HH#103 ON N PERSHING AVE., <br />MH AND HH #3 ON N PERSHING AVE., FOR SHOULDER CLOSURE TO ACCESS POLE #51 AND POLE #52 <br />ON BALBOA AVE.,FOR SOFT CLOSURE FOR AERIAL PLACEMENT ON BALBOA AVE., FOR SHOULDER <br />CLOSURE TO ACCESS HH #2 ON ARROYO WAY.,FOR SOFT CLOSURE FOR AERIAL PLACEMENT ON <br />PORTOLA AVE., SANTA ROSE WAY,, SANTA GABRIEL WAY, SANTA PABLO WAY, CORTEZ AVE.,, <br />SEVILLE AVE., SOLANO AVE. AT&T JOB #A02VNQG. <br />Location:EAST SIDE OF THORNTON RD APPROX 230' FROM PORTOLA AVE <br />In compliance with your request of 02/11/2025,permission is hereby granted to do work in County right-of-way as <br />shown on attached application and subject to all the terms, conditions and restrictions written below or printed as <br />general or special provisions on any part of this form. See reverse side and attached sheets, if any. <br />Trench excavations for service connections will not be permitted within ten feet of pavement centerline unless <br />otherwise approved by the Director. Surface of trench patches shall match in kind and be smooth and <br />even with that of abutting surface. Special attention shall be given to depth of utilities through roadside area in <br />anticipation of future draining facilities, road profile and/or frontage development. All underground utility facilities <br />are to be established and accurately dimensioned on sketches from surveyed centerline of road right-of-way, or <br />from right-of-way lines. <br />Permittee shall call the Department of Public Works, Field Engineering Division (Permit Inspection) at (209) 953- <br />7421 at least two business days prior to beginning any work within the County right of way. All work performed <br />under this permit shall conform to the rules and regulations pertaining to safety established by the California <br />Division of Occupational Safety and Health (Cal-OSHA.) <br />The jobsite shall be kept in a safe condition at all times by the daily removal of any excess dirt or debris which <br />might be a hazard to either pedestrian or automobile traffic. All necessary traffic convenience and warning devices <br />and personnel shall be provided, placed and maintained by and at the sole expense of the Permittee in <br />accordance with the latest edition of the CALTRANS MUTCD. <br />After completion of the work permitted herein, all debris, lumber, barricades, or any excess material shall be <br />removed and the jobsite left in a neat workmanlike manner. Immediately following completion of construction <br />permitted herein, Permittee shall call the Department of Public Works, Field Engineering Division (Permit <br />Inspections) at (209) 953-7421 to complete the permit. <br />Special Comments: <br />Traffic Control per MUTCD*No Bollards*No Road Closures* <br />SS/WW General Provisions R29 Trench Cut Policy <br />Forms: <br />Permit Fee: <br />11/01/2025