My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2022_PS-2202501 thru PS-2203000_ - PS-2202668
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2022
>
PS-2202501 thru PS-2203000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2022_PS-2202501 thru PS-2203000_ - PS-2202668
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2025 9:03:36 AM
Creation date
4/18/2025 9:03:08 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2202668
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2022
Location
Qantas Lane s/o Arch Airport Road to W. 99 Frontage Road
Type - Permit Process
Construction of Qantas Lane & East Lane
Address
66 Franklin Street, Oakland, CA 94607
Application
CATELLUS
Project #
PWP760032
Type
Encroachment Permit
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-2- <br />Special Conditions for <br />Encroachment Permit <br />suitable for traffic loadings shall be prepared by a registered civil engineer and submitted for prior <br />approval by the County. <br /> <br />14. The contractor shall use San Joaquin County Improvement Standard R-29 when backfilling <br />trenches within the County right-of-way. Where the existing road structural section is below <br />standard, a minimum section of 3 inches of asphalt concrete over 8 inches of aggregate base <br />shall be required. <br /> <br />15. If pavement cuts occur within Qantas Lane, it shall receive a grind and overlay as per San <br />Joaquin County Department of Public Works Improvement Standards Section 2-5.0 Trench Cut <br />Policy. Shoulder areas shall be brought up to the finish grade as directed by the County. <br /> <br />16. Final paving for trench repair or road resurfacing shall be per Caltrans’ specifications and shall <br />not occur between November 1 and March 31, without prior authorization from the San Joaquin <br />County Department of Public Works Field Engineering Division, contact them at 209-953-7421. <br />17. The utility iron raisings shall be resurfaced and repaired to the San Joaquin County Department <br />of Public Works Improvement Standards Drawing R-30. <br /> <br />18. No paving joints are allowed within paved shoulder; contractor shall pave all the way to outer <br />edge of paved shoulder. <br /> <br />19. Class II Aggregate Base shoulder backing is required from the edge of pavement, a minimum of <br />6-inches thick by 5-feet wide. <br /> <br />20. Contractor shall establish existing roadway and drainage grades within the construction area. <br />Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade <br />changes shall receive prior approval from County. <br /> <br />21. Above ground vaults, panels and/or other similar facilities will be allowed within the right-of-way if <br />located as far to the outside edge as possible. Utility vaults shall be located a minimum of 4’-0” <br />from edge of pavement. <br /> <br />22. County roads and the bypass road shall be kept clean from mud and debris at all times along the <br />access points and work zone areas during entire project. All standard roadway striping and <br />signage shall be clearly visible, maintained and restored throughout the construction zone during <br />and after the project. <br /> <br />23. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br />free of dirt, mud and debris during construction activities. The contractor shall provide daily, and <br />as determined to be necessary by County inspectors, street sweeping using a modern <br />mechanical or vacuum-assisted street sweeper. <br /> <br />24. The contractor shall not conduct construction operations in rain or heavy fog conditions.
The URL can be used to link to this page
Your browser does not support the video tag.