My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PW-ENCUTIL-2501560
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2025
>
PW-ENCUTIL-2501501 thru PW-ENCUTIL-2502000
>
PW-ENCUTIL-2501560
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2025 7:59:56 AM
Creation date
4/21/2025 7:59:37 AM
Metadata
Fields
Template:
Permits_Development
DocName
PW-ENCUTIL-2501560
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2025
Location
8 loc. SEE MAIN DOCUMENT FOR FURTHER DETAILS
Type - Permit Process
Copper reclamation project requires AT&T to access (8) AT&Texisting manholes, (1) existing sub box & (11) existing poles to remove unused copper cables for recycling.
Address
1445 Van Ness Ave., Fresno
Application
AT&T California
Project #
730079
Type
Utility Encroachment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for -2- <br />ENCROACHMENT PERMIT <br />and/or adjustment of these facilities as determined by the County at AT&Ts expense. (Streets <br />and Highways Code Section 1463) <br /> <br />12. All future maintenance of the pipeline and related facilities within the County right-of-way will <br />require a San Joaquin County Encroachment Permit. <br /> <br />13. County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. All standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br /> <br />14. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br />free of dirt, mud and debris during construction activities. The contractor shall provide daily, and <br />as determined to be necessary by County inspectors, street sweeping using a modern <br />mechanical or vacuum-assisted street sweeper. <br /> <br />15. The contractor shall not conduct construction operations in rain or heavy fog conditions.
The URL can be used to link to this page
Your browser does not support the video tag.