My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
M590 - M778
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer M
>
M558 - M
>
M590 - M778
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 9:36:09 AM
Creation date
4/25/2025 9:47:25 AM
Metadata
Fields
Template:
Large Plans - LP
Project
McHenry Avenue Corridor Improvements
Limits
1487' South of River Road to 190' South of Jones Avenue
Year
2016
Project Engineer
R. Gibson
Roads Worked
McHenry Ave.
Red Lines
Yes
Federal #
STPL-5929(196), BRLS-5929(166), BRLS-5929(167), CML-5929(247)
Supplemental fields
Classification
As-Builts
Cross Ref
M558 - M778
Type
Corridor Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NOTES: <br />1 For deck drain details and drainage pipe details, see "DECK DRAINAGE <br />DETAILS — SPANS 22-25" sheet. <br />EOD 104'---4 7/8" Max to 80'--8 3/4" Min EOD 2. For Plan and Elevation, see "STRUCTURE PLAN NO. 3" sheet. <br />3. For Signal Pole support details, see "MISCELLANEOUS DETAILS" sheet. <br />69'-8 3/8" Max to 46'-11 3/4" Min 34'-8 1/2" Max to 33'-9" Min <br />Stage 2 Construction Stage 1 Construction <br />ES ETW Varies Moo Line Varies ETW ES <br />$ <br />6'-9" 5'-0" 14'-23/4" Min 3 lanes @ 12'-0" - 36'-0" 12'-0" Min 5'- 0 to 1 _9" S <br />W.- ShId Barrier --Type 1 -A ES-7 <br />Sidewalk ShId to 36'- 11 Crown Line-,,., to 12'-- 1 1,Y2" Standard OA- 1 <br />Metal Bicycle Max Lane $I Max Lane <br />18'-0" 3''- 9 Signal <br />Signal Pole <br />Railing, T <br />RS Typ utter Line <br />B1 1-64 8 1-63 1-6 Concrete Barrier <br />- - - Type 80SW -------------- <br />ttt S16 <br />of <br />2 0 Conduit <br />for Signal pole <br />12" 0 Drain Pipe <br />EOD <br />--W <br />Closure Pour Gutter Line----,.- Conc Barrier rBlqlS'60 B�11-61 <br />2-20 Conduit Type 80 <br />—2%0 Const Jt <br />for Signal ---�,_ <br />Signal Pole Support, <br />see Note 3 <br />Cast —in —Place <br />60 <br />4" CVIN F/O Reinforced Conc Slab <br />12"0 Drain Pipe— (/—Approx OG = FG <br />TYPICAL SECTION (FRAME 5) <br />1/81111-01 <br />80'--8 3/4" Max to 78'-6" Min <br />46'-11 3/4" Max to 44'-9" Mir 33'-9 it <br />Stage 2 Construction Stage 1 Construction <br />51 KA" I <br />.6 <br />91-- <br />ES ETW Varies H r-- ETW ES <br />6 ' — 9 to 51-0y%__.,12'-0" Min_ 4 Lanes @ 12'-0 48 P-01) 5)-011 1'_9" <br />Sidewalk S h I d to 14'— 2 3/4 Crown Line $—Opp ShId Barrier <br />Metal Bicycle Max Lane 3 C:) Gutter SR_ S <br />Railing, Typ ,---Gutter Line 18'— 0 to Closure Pour ;i 11 Bll-61 <br />-04 No.- Line Conc Barrier 11?-60\i�(�� <br />Ln /-12"0 Drain Type 80 <br />T, <br />Pipe 2-1 1/2"0 Conduit for Signal <br />• <br />4" CVIN F/O <br />1111A <br />CIP/PS Conc Box Girder <br />--Approx 0 G <br />FG 48"0 Circular Conc <br />Column, Typ <br />rJ ----- L -I <br />72"0 CIDH Pile, <br />Bent 23 & Bent 24 only <br />NOTE: <br />THE CONTRACTOR SHALL VERIFY ALL CONTROLLING FIELD <br />DIMENSIONS BEFORE ORDL_RING OR FABRICATING ANY MATERIAL. <br />SURVEY REVISION DESCRIPTION BY <br />DATUM: <br />A <br />FILE No. <br />TYPICAL SECTION '(FRAVE 4) <br />1/8" = 1'-0' <br />DATE SCALE <br />PREPARED BY <br />HORIZONTAL: <br />DRAWN: <br />H. <br />SULLIVAN <br />VERTICAL: <br />DESIGNED. <br />J. <br />FREKING <br />0 1 <br />2 <br />1 1 I I <br />I CHECKED: <br />N. <br />CALDERONE <br />INCHES <br />INC <br />0 10 20 30 40 <br />50 APPROVED: <br />0. <br />BROWN <br />MILLIMETERS <br />DATE <br />09--29-16 <br />P"=C0M <br />09-29-16 <br />AECOM Technical Services, Inc. <br />09-29-16 <br />2020 L Street, Suite 300 <br />Sacramento, CA 95811 <br />09-29-16 <br />T 916.414.5800 F 916.414,1557 <br />Ma <br />a. <br />94LIr 6 <br />LEGEND. <br />Existing Structure <br />NO CHANGES <br />W>W" Ave Carldw IrVowneM Project <br />Daft Acompted <br />AS -BUILT <br />Resident Engwow - Mawkgo Wm, RE <br />Structure PhWeavyh0a - David Franco, P E. <br />RevWws Sy D. rV&v( d Jur% 8, 2021 <br />SAN JOAQUIN COUNTY PUBLIC WORKS DRAWING <br />S-106 <br />4V <br />Fyn <br />ORIN A. BROWN i OF <br />McHENRY AVE CORRIDOR IMPROVEMENTS Uj 30918 <br />No. S-153 <br />EXP. 09- <br />McHENRY AVE BRIDGE OVER STANISLAUS RIVER (REPLACE) CIVIL <br />ri SHEET <br />OF cikL\ <br />STRUCTURE PLAN NO. 4 11 0op-1 76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.