Laserfiche WebLink
"M" Line = <br />Exist Bridge (Approx) <br />In QD <br />N cs� 00 O T N r'7 d f 00 UN t- N <br />W N N W N <br />Q) Q) a) I-' a) C C C C C Q)Q) C C a) a) C C C <br />`� I ml ml m I �I M m ml +,I a)l ail a)l a) ail ml ml a)l a)l ml ml a>I a)IIn (DI <br />Q) C m m m m m m m m m m <br />(!) U7 Ul U? I U3 m ++ ++� (_n �_ + +- �_ cj cn C + � -+� +� <br />L J X X X U X W I X cn rn cn cn cn X X M X O X a) . C0 <br />W W W - W W X X X X X W W X X L i W m � X X Q) I b) X <br />X LLJJ W W W W W W 00 W Li.J m 00 W <br />W C� 'X <br />I �I �I W � I �I '� I (3'I III �I III z �'I (:�'IC--)J z (::)'I <br />I <br />w 0 0 0 0 010 0 00 0 O O 2) C) i N <br />I I I I ( I I I I I I I I I I I I ® 0 IO ® ® 01 ® ® ® (3) 0 ® 0 ® c O <br />w w w w1 I w w w w w w w w1`0 0 0 0 0 0 0 0 0 0 1 0 0 3 0 z <br />(D b-) Q <br />co CD cD co Q0 �D cr Qo O Q c.a N Q0 m 00 0 00 0 00 0 0 0 3 0 0 03 0 -J <br />N ,�� d 6, cU r� CIOo� a_ <br />r� -! r� I rj I I r� I 0 10 0 0 01 ® 00 0 0 0 D(D l z <br />a o o C o0 o C C <br />Q) <br />rn a� a) >1 a) a) Q) a.> 6, a) a) <br />Q oo m 00 m 00 m 001 I m 00 m 00 m 00 m 00 m 00 m 00 m 00 m 00 Q <br />z c3j z (--4j z N z c­)J z z c� z (::)j z (z�J z (::)j z zz <br />Q Q <br />WWLOL O <br />� A � c� Q Q Q c� c� q � <br />0-)1 I I I I I I c� Q I i I I I I I I I I I i I ! i I I I i I I I i I !L <br />0 0 ^ I 0 1 0 0 0 0 0 0 0 0 0 0 0 a) <br />� N I j�,5+00 2+00 N 33+00 I 34+00 I 36 + 00 37+00 38+00 U) <br />0--0 J °II ° I ° I I ° 11 I° ' ° I ° I O I ° q ° „ I If iI I I II o N 00°22'44" W I I I f I i1 C)\ <br />C:5,_0to C)o oo I C_° O° O .° OO ° <br />i <br />I + 1 .79 32+81 .04 33+20.04 0 34+76.04 36+32.04 36+71 .04 ' 37+ 10.04 37+49.04 37+88.04 <br />32 5 1 Q of \33+98.04 35+15.04 35+54.04 35+93.0434+37.04 <br />11� O O O O O O O O O O O O O O O <br />E ©~ NI <br />a O O O O� O CD O O O O O O O <br />0-4 L0 7 -2 f �- <br />W W LO L o O 1_0 o O O O o o O O 0 0 0 <br />I <br />0 <br />"I -Remove Existing Buried Remove Existing <br />� I89 35 See Note 1 Concrete Arch Culvert <br />CDBridge (Stage 2) <br />(2 opening) <br />Br. No. 38C-0032 <br />O <br />PLAN <br />1" = 20' HYDROLOGIC SUMMARY LEGEND: <br />C Drainage Area: 1,050 square miles � - Bottom of footing elevation <br />PILE DATA TABLE 0 - 24" Octagonal PC/PS Concrete Piles <br />N Design Base Flood of USACOE Overtopping - Class 140 Piles <br />Location Pile Design Nominal Resistance (kips) Specified Design Ti Specified Tip Permanent Flood Flood Record Flood 0 - 3's� Stone Column (Stage 1 Const <br />cn Loading p Cut-off ( ( ) Steel Casing y y y y y - ( g ) <br />Type (kips) Compression Tension Elev. (ft) Elev. ft Elev. ft Tip elev (ft) Frequency50- r 100- r >100- r 200- r »500- r Exist Piles <br />Discharge 8,000 ft3/s 8,000 ft3/s 9,019 ft3/s 13,100 ft3/s 41,300 ft3/s <br />L Abut 1 Class 140 140 280 N A _ <br />m / i 89.6 44.6 (1) 44.6 (1) NA Water Surface Elevation at Bridge 81.4 ft l 81.4 ft 82.2 ft 83.8 ft 89.8 ft NOTES: <br />Bents 2-20 24" PC/PS _ 550 - 98.3-108.9 15 (4) 15 (4) NA Flood plain data are based upon information available when the plans were prepared and are 1. For pile layout see "ABUTMENT 1 LAYOUT" sheet. <br />Octagonal shown to meet federal requirements. The accuracy of said information is not warranted by the <br />Bent 21 24" PC/PS _ 550 - 108.5-109.4 30 (1) 30 (1) NA Counties and interested or affected parties should make their own investigation. 2. For ground improvement details, see "GROUND <br />Octagonal <br />i IMPROVEMENT DETAILS" sheet. <br />Bent 22 54" CIDH - 1210 - 81 10 (1) 10 (1) 40 <br />L <br />o Bent 23 72" CIDH - 3030 - 60 -50 (4) - 50 (4) 35 BENCHMARK DATA <br />o Point Northing Easting Elevation Description <br />Bent 24 72" CIDH - 3020 - 58 -50 (4) -50 (4) 35 501 2099928.92 6418186.05 119.55 KSN control, a 5/8" rebar with a yellow plastic cap marked "KSN CONTROL" located on the <br />west levee of the SSJID canal, on the south end of the north -south canal run, on the west <br />Bent 25 54" CIDH - 1290 - 88 20 (1) 20 (1) NA side of McHenry Avenue, north of River Road. <br />�I 55001 2102597.53 6418301.62 120.74 City of Escalon BM 10, a brass disk located in the southwest headwall of the SSJID canal on <br />00 Abut 26 Class 140 140 280 N/A 105.2 60.2 (1) 60.2 (1) NAC114 the west side of McHenry Avenue, and the south levee of SSJID canal. <br />N <br />Design ti elevation is controlled b the followin demands: 55003 2099786.40 6418330.53 113.52 T 957, a survey benchmark set in the northwest abutment of the bridge over the Stanislaus <br />0 (1) Compression, (2) Tension, (3) Lateral. (4) Liquefaction ACTUAL PILE TIPS IN BENTS 2 TO 19 VARY River, see NGS PID HS22242 for additional information. Note that benchmark is located on <br />FROM ELEV. 15 TO ELEV. 25 DUE TO HARD west side of the bridge not east as described on the NGS data sheet. <br />COBBLE DEPOSITS UNDER GRAVEL. SEE <br />NOTE: Survey Control: Bearings and coordinates are based on the California Coordinate System of 1983 (CCS 83), Zone 3. <br />U THE CONTRACTOR SHALL VERIFY ALL CONTROLLING FIELD DIRECTED PILE TIP CHANGES FOR STAGE 2, Elevations are based on the North American Vertical Datum of 1988 (NAVD 88 CGPS). <br />DIMENSIONS BEFORE ORDERING OR FABRICATING ANY MATERIAL. ON ,;HFFT 5-112A The Unit of measurement is the US Survey Foot, 2007.00 Epoch date adjustment. <br />t � e <br />o SURVEY I REVISION I DESCRIPTION BY DATE SCALE PREPARED BY DATE SA N J O AQ U I N COUNTY PUBLIC WORKS <br />DATUM: p <br />c, McHenry Ave Corridor Improvement Project HORIZONTAL: DRAWN: H. SULLIVAN 09-29-16 �M <br />/n VERTICAL: J. FREKING 09-29-16 cn A, BROWN <br />o �'0 t 2 DESIGNED: AECOM Technical Services, Inc. McHENRY NaRINC48859 <br />AS -BUILT I I I I I N. CA R N 9- -1 2020 L Street, Suite 300 * Ex , 09-30-18 <br />� CHECKED: LDE O E 0 29 6 •'. • p <br />INCHES Sacramento, CA95811 McHENRY AVE BRIDGE OVER STANISLAUS RIVER (REPLACE) `rTq CIVIL <br />z E Resident Engineer - Mauricio Rivera P.E. T 916.414.5800 F 916.414.1557 ,�-�. r <br />w ' - i 1I 2I 30 4i I0 APPROVED: 0. BROWN 09-29-16 �'q`,/ a�P FOF cn��F° <br />FILE No. : Structure Representative - David Franco, P.E. MIUIME4RS F.o. R r FOUNDATION PLAN N0. 1 STAGE 1 <br />Revisions By 9/28/2021 <br />DRAWING <br />S-112 <br />OF <br />S-153 <br />SHEET <br />1 16OF176 <br />