My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
M590 - M778
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer M
>
M558 - M
>
M590 - M778
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 9:36:09 AM
Creation date
4/25/2025 9:47:25 AM
Metadata
Fields
Template:
Large Plans - LP
Project
McHenry Avenue Corridor Improvements
Limits
1487' South of River Road to 190' South of Jones Avenue
Year
2016
Project Engineer
R. Gibson
Roads Worked
McHenry Ave.
Red Lines
Yes
Federal #
STPL-5929(196), BRLS-5929(166), BRLS-5929(167), CML-5929(247)
Supplemental fields
Classification
As-Builts
Cross Ref
M558 - M778
Type
Corridor Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
E <br />0 <br />N <br />CN <br />r-i <br />CD <br />0 <br />43 <br />E <br />CD <br />M <br />L_ <br />Q) <br />CU <br />C_ <br />U <br />Ln <br />0 <br />Ile <br />N <br />CURVE DATA TABLE (EOD) <br />ID R A L <br />B 48-25" 15008'2511 6.41 1 2.75' <br />D 5 3.2 5 " 13) 41 '50'' 6. A 0' 12.731 <br />SCOUR DATA TABLE <br />SUPPORT LONG TERM (Degradation and SHORT TERM (Local) <br />Contraction) SCOUR ELEVATION (ft) SCOUR DEPTH (ft) <br />23 NA/NA 7 <br />24 NA/NA 7 <br />25 NA/NA 7 <br />NOTE: <br />THE CONTRACTOR SHALL VERIFY ALL CONTROLLING FIELD <br />DIMENSIONS BEFORE ORDERING OR FABRICATING ANY MATERIAL. <br />SURVEY REVISION DESCRIPTION BY DATE SCALE <br />DATUM: i;".f HORIZONTAL: <br />10e4 L- t I <br />A/e -c- 4.4.* 1 1:11AAN&% D Fit,! VERTICAL: <br />all 44r.ik. r 1 0 <br />� C> g I I <br />INCHES <br />A <br />0 10 20 30 40 <br />FILE No. MILLIMETERS <br />PLAN <br />1" = 20' <br />Column — <br />Pile <br />Column <br />OG <br />/% Pile Cut—off <br />Elevation <br />PREPARED BY <br />DRAWN: H. SULLIVAN <br />DESIGNED: J. FREKING <br />2 <br />1 CHECKED: N_ CALDERONE <br />5 1 0 APaRCVED: 0. BROWN <br />* Measured <br />from face <br />of column <br />DATE <br />Column — <br />Pile <br />Column <br />C OG <br />Pile Cut—off <br />Elevation <br />McHenry Ave Co *br Wnprwamwt pmjw <br />Date ACMPW <br />AS -BUILT <br />Resident Enowwr - Maudoo RN*m, P.E. <br />Struck" RW*@wft*A - DrM Franco. P.E. <br />Rw,W,,, By r- R- '- 1< %( e Jar IL 201 <br />PAY LIMITS FOR STRUCTURE <br />EXCAVATION AND BACKFILL <br />No Scale <br />09-29-16 AECOM <br />09-29-16 <br />AECOM Technical Services, Inc <br />09-29-16 2020 L Street, Suite 300 <br />Sacramento, CA 95811 <br />09-29-16 1-916414.5800 F916.414.1557 <br />T <br />Structure Excavation <br />(Bridge) <br />Structure Backfill <br />(Bridge) <br />LEGEND: <br />E=, — <br />Bottom of <br />footing elevation <br />0 — <br />72"0 CIDH <br />Piles <br />0 — <br />54"0 CIDH <br />Piles <br />0 — <br />24" Octagonal PC/PS Concrete Piles <br />— <br />Class 140 <br />Piles <br />— <br />Class 140 <br />Piles Battered 1:3 <br />— <br />3'0 Stone <br />Column (Stage 1 Const) <br />— <br />Exist Piles <br />0 — <br />3'0 Stone <br />Column (Stage 2 Const) <br />NOTES: <br />1. For pile layout see "ABUTMENT 26 LAYOUT" and <br />"ABUTMENT 26 FOOTING LAYOUT" sheets. <br />2. For Ground Improvement details, see "GROUND <br />IMPROVEMENT DETAILS" sheet. <br />SAN JOAQUIN COUNTY PUBLIC WORKS <br />McHENRY AVE CORRIDOR IMPROVEMENTS�� <br />McHENRY AVE BRIDGE OVER STANISLAUS RIVER (REPLACE) <br />FOUNDATION PLAN NO. 2 <br />ORIN A. BROWN <br />Na. CIM9 <br />*r',Exp. <br />lF CV V9L <br />DRAWING <br />S-113 <br />0 F_-_ <br />S-153 <br />SHEET <br />1 17OF11 76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.