My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
M590 - M778
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer M
>
M558 - M
>
M590 - M778
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 9:36:09 AM
Creation date
4/25/2025 9:47:25 AM
Metadata
Fields
Template:
Large Plans - LP
Project
McHenry Avenue Corridor Improvements
Limits
1487' South of River Road to 190' South of Jones Avenue
Year
2016
Project Engineer
R. Gibson
Roads Worked
McHenry Ave.
Red Lines
Yes
Federal #
STPL-5929(196), BRLS-5929(166), BRLS-5929(167), CML-5929(247)
Supplemental fields
Classification
As-Builts
Cross Ref
M558 - M778
Type
Corridor Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
rn <br />w[a <br />0 <br />E <br />v� <br />�o <br />i <br />i <br />0 <br />s <br />i <br />i DATUM: <br />n <br />d <br />L <br />c <br />FILE NO. <br />ti <br />PROJECT <br />CONTROL SURVEY DATA <br />NOTE: <br />NO, <br />COORDINATES <br />ELEV <br />STATION t OFFSET <br />DESCRIPTION <br />NQRTHING <br />FASTING <br />1 � BASIS OF CONTROL: BEARING AND DISTANCES SHOWN ARE <br />501 <br />2099928.92 <br />641$186.05 119.55 <br />"M" 45+02.53, 173.90E <br />KSN CONTROL A 5/8" REBAR WITH A YELLOW PLASTIC CAP <br />BASED ON THE NORTHERN AMERICAN DATUM OF 1983 <br />i <br />- <br />MARKED "KSN CONTROL" LOCATED ON THE WEST LEVEE OF THE <br />(NAD 83) CONVERTED TO THE CALIFORNIA COORDINATE <br />t <br />SSJID CANAL, ON THE SOUTH END OF THE NORTH —SOUTH <br />SYSTEM OF 1983. ZONE 3 (CCS-83 III) AS REFERENCED <br />CANAL RUN, ON THE WEST SIDE OF MCHENRY AVENUE, NORTH <br />BY AVAILABLE NGS PUBLISHED CONTROL. MONUMENTS <br />OF RIVER ROAD. <br />GRID DISTANCES. ELEVATIONS SHOWN ARE BASED ON THE <br />55001 <br />2102597.53 <br />6418301.82 120.74 <br />"M" 71 +70.83, 133.32L <br />CITY OF ESCALON BM10, A BRASS DISK LOCATED IN THE <br />NORTHERN AMERICAN VERTICAL DATUM OF 1988(NAVD 88) <br />SOUTHWEST HEADWALL OF THE SSJID CANAL ON THE WEST SIDE <br />AS REFERENCED BY AVAILABLE NGS AND LOCAL <br />OF M HENRY AVENUE, AND THE SOUTH LEVEE OF THE SSJID <br />PUBLISHED BENCHMARKS UNITS SHOWN ARE BASED ON <br />THE U.S. SURVEY FOOT. 2007.00 EPOCH DATE <br />ADJUSTMENT <br />55003 <br />2099786.40 <br />6418330.53 113.52 <br />"M" 43+57.56, 30.72L <br />T 957, A SURVEY BENCHMARK SET IN THE NORTHWEST <br />ABUTMENT OF THE BRIDGE OVER THE STANISLAUS RIVER, SEE <br />NGS PID HS2242 FOR ADDITIONAL INFORMATION. NOTE THAT <br />BENCHMARK IS LOCATED ON THE WEST SIDE OF THE BRIDGE <br />1 <br />NOT EAST AS DESCR D IN THE NGS DATA SHEET. <br />1 <br />1 <br />� t <br />1 <br />I <br />I <br />q , 1 <br />.0p ';�l <br />*orb <br />01 <br />R W Q <br />_ <br />r <br />4 <br />— 35 <br />-r <br />R W _ _ <br />1 <br />1 � <br />r <br />K RIVER ROAD <br />1 <br />"R" LINE <br />MCHENRY AVENUE <br />"M11 LINE <br />_ <br />Li <br />.. rmwe�wcnc.xasrrae�a- � � ,._ <br />`. R/W <br />1 <br />a 1 <br />00*1 <br />1 <br />SURVEY <br />REVISION DESCRIPTION BY DATE SCALE <br />PREPARED BYI <br />HORIZONTAL. NO SCALE <br />DRAWN: <br />f . <br />DeMARCO <br />VERTICAL: <br />GIBSON <br />DESIGNED.-R. <br />. <br />I i I i <br />CHECKED. <br />K. <br />OAKS <br />INCHES <br />0 10 20 30 40 50 <br />APPROVED: <br />T. <br />BARNARD <br />— _- — — MILLIMETERS <br />I <br />� 14 <br />I <br />LL' W <br />>_ a <br />...,..,., L�'' . <br />•.., ,•��` ��Km>: :,e ,�::� ~ � �• r� .,�,¢„ �l ecrx.... M..ssw*a�r-a..x.x.a.;�v;v�: es �:�.;w :xe::�u:zxcy.:.�: �a :<. <br />r xis crass':. c <br />'•�-s�arsm..::.:x:xz:raw: xa.M. +,.<,w:mam:.xnx: :;wM'•;: sr::>.,xw;�:-s"�xrac -- » , <br />-: <br />.:.. .......... .. .. .. ..,....... ...... ww.tM• ..a.xrcmns:axan+x-.ue...•.:, ..,. . .. .... .. lsk''7�.".tp'.. Nys3j:vk°. <br />w,�� sxmx.... ...... .. ... .. . <br />A <br />1 1 1 <br />I 1 <br />1 <br />I � <br />Q <br />z 1 1 <br />C4 <br />3 1 _j ! i <br />c� 0- NO CHANGES <br />c <br />cn <br />MO nrY Ave CWMW impt&eM Wt Pl <br />1 1 0&M AoCepted <br />1 AS -BUILT <br />ReWent Engin wer - Mwfk;lo Wwara. P.E. <br />Revisiam By 0- PWAA1 eV June 8, 2021 <br />I <br />1 <br />DATE SAN JOAQUIN COUNTY PUBLIC WORKS DRAWING <br />u . �. N � SS/ <br />� _� _ �a O CCU •• •• F <br />PC--1 <br />qr <br />IMPROVEMEN Sr <br />09-29-16 'n K, :� OF <br />•, � ,McHENRYAVE CORRIDOR No. c�os99 <br />TECHNICAL SERVICES, INC. l� �,.� <br />09-29-16 2020 L STREET, SUITE 300„,..;' : e * ;•Exp. 0s—so-17 : PC-1 <br />SACRAMENTO, CA95811 PROJECT CONTROL ,�^9••c.'!!!_•••���, SHEET <br />09-29-16 T 916,414.5800 F 916.414.1557 �'� --� �P if Of hO�� �F <br />14 176 <br />FILE NO. <br />
The URL can be used to link to this page
Your browser does not support the video tag.