My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
M590 - M778
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer M
>
M558 - M
>
M590 - M778
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 9:36:09 AM
Creation date
4/25/2025 9:47:25 AM
Metadata
Fields
Template:
Large Plans - LP
Project
McHenry Avenue Corridor Improvements
Limits
1487' South of River Road to 190' South of Jones Avenue
Year
2016
Project Engineer
R. Gibson
Roads Worked
McHenry Ave.
Red Lines
Yes
Federal #
STPL-5929(196), BRLS-5929(166), BRLS-5929(167), CML-5929(247)
Supplemental fields
Classification
As-Builts
Cross Ref
M558 - M778
Type
Corridor Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
mi <br />cu <br />E <br />rn <br />M <br />c- <br />C/) <br />Col -_ <br />CIDH Pile� <br />0 <br />C I I <br />#5 N OR -cN <br />Alt both ways, sets of 3 <br />parallel to girder, <br />space sets 18 along <br />0 <br />bent, hook around <br />Cal Reinf top deck Reinf. <br />Box Girder soffit <br />0 <br />Q) <br />0 <br />Z <br />0 = C) <br />N <br />Q) _0 <br />0 <br />�4� <br />-:: 0) Q) <br />0 0 <br />0 Z <br />< <br />C: a) OG & FG <br /> <br />U) -0 <br />3: U <br />0 <br />Pile Cut-off <br />Elev, see Note 1 <br />B <br />OIL <br />4-d <br />as <br />CD <br /># 10 I Q) C: <br />0 <br />(D <br />4d 4-- <br />06 � <br />0 <br />CN <br />-4- 00 <br />Q) �, <br />0 0 <br />> _ ' <br />0 <br />< 0 0 <br />V) Z 00 E <br />0) <br />Q) <br />10 <br />a <br />Cn <br />- � <br />Optional <br />Const Jt <br />Permanent <br />Steel Casing <br />Tip Elev <br />0 <br />CD <br />< <br />Specified Tip Elev <br />see Note 1 <br />C: <br />72 0 CIDH PILE BENTS 23 & 24 <br />00 ft _0$1 <br />NOTE: <br />CN 1/$ <br />2 1 <br />C14 <br />o THE CONTRACTOR SHALL VERIFY ALL CONTROLLING FIELD <br />C) DIMENSIONS BEFORE ORDERING OR FABRICATING ANY MATERIAL. <br />I <br />V <br />#10 Tot <br />#7 hoop <br />q Ber <br />#7 <br />#10 <br />Ste( <br />casi <br />2-#10 bunt <br />Tot 18 bun <br />#8 hoop <br />� Ben', <br />#10 Tot <br />#7 hoop <br />Be r <br />Steel <br />casing - <br />SURVEY <br />REVISION DESCRIPTION BY DATE SCALE <br />PREPARED BY <br />0 DATUM: <br />U <br />HORIZONTAL: <br />DRAWN: 11. SULLIVAN <br />C: C- <br />.5 <br />VERTICAL: <br />0- 0 C_- <br />DESIGNED: 0. BROWN <br />0 <br />0 <br />2 <br />0 <br />.) <br />Z� <br />INCHES <br />1 CHECKED: K. LEE <br />A <br />C: <br />0 <br />0 10 20 30 40 <br />50 APPROVED: 0. BROWN <br />1 <br />1 <br />o FILE No. <br />LUMETiRS <br />MILLIMETERS <br />Col - <br />_-W 4'- 0 " 1111- <br />SECTION A <br />1/211 = 11-Opt <br />� Col = <br />M 51"1 <br />SECTION B-B <br />1/2" - 1 1-01) <br />Col = <br />CIDH Pile <br />6'- 0 <br />r. <br />SECTION C-C <br />1/2" = 11-01P <br />hoop <br />2-#10 Bundled, <br />Tot 18 bundles <br />0 <br />a. <br />2" 1. D. 0 0 <br />inspection C_ <br />pipe, Tot 6 rl- <br />Z*z <br />2" I. D. <br />inspection <br />pipe, Tot 4 <br />4'- <br />6Yi <br />--a <br />am - <br />SECTION <br />D-D <br />1/211 <br />1-011 <br />DATE <br />09-29-16 <br />ACaM <br />09-29--16 <br />AECOM Technical Services, Inc <br />09-29-16 <br />2020 L Street, Suite 300 <br />Sacramento, CA 95811 <br />09-29-16 <br />T 916.414.5800 F 916.414.1557 <br />0. <br />i <br />y <br />AV) <br />0 0 <br />Q) 0 <br />E c <br />Li <br />C: <br />: 3; <br />Q) <br />0 C!f <br />0- <br />0 <br />U C7 <br />E <br />0 Z C_ <br />.- <br />-0 <br />0 <br />0-0 Z <br />— <br />Cn <br />y <br />Cal - <br />CIDH Pile <br />Box Girder <br />3 I -Opt <br />Bent Cap <br />C o I Reinf <br />A <br />-------------------------- <br />OG & FIG <br />X rx <br />Pile Cut-off Elev <br />see Note 1 <br /># 10 <br />14- <br />0 Ir <br />0 <br />U)U Dom_ <br />C14 C: <br />E <br />0 <br />Z <br />NO CHANGES <br />10046" Avg Ccoffift Wpa"W P <br />Date Acompled — <br />AS -BUILT <br />Resident Engineer - Mauncio Rivers, P.E. <br />Structure Representative - David Franoo, P E. <br />June 9 2021 <br />NOTES: <br />/ I / <br />1 For Pile Data Table, see "FOUNDATION PLAN <br />NO. 1 sheet. <br />2. All hoops are ultimate butt spliced continuous <br />Permanent <br />Steel Casing Only staggered "ultimate" butt q 11rPlivesnrare_0 <br />Q) 1`0 Tip Elev <br />0 Q) <br />— -1--i <br />0 0 <br />Z <br />U <br />Q) <br />C)- U0 <br />Cf) <br />allowed in main CIDH pile reinforcement in <br />this zone. <br />Specified Tip Elev <br />see Note 1 <br />54"0 CIDH PILE BENTS 22 & 25 <br />1/211 = 1p-OP1 <br />SAN JOAQUIN COUNTY PUBLIC WORKS <br />M <br />ORIN A. BROWN cHENRY AVE CORRIDOR IMPROVEMENTS N o C48859 r <br />Exp. 09-30-18 <br />McHENRY AVE BRIDGE OVER STANISI.-AUS RIVER (REPLACE) CIVIL <br />of C,%L\ <br />COLUMN & PILING DETAILS NO. 2 <br />DRAWING <br />S-129 <br />OF <br />S-153 <br />SHEET <br />1330F176 <br />j <br />
The URL can be used to link to this page
Your browser does not support the video tag.