My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
M590 - M778
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer M
>
M558 - M
>
M590 - M778
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 9:36:09 AM
Creation date
4/25/2025 9:47:25 AM
Metadata
Fields
Template:
Large Plans - LP
Project
McHenry Avenue Corridor Improvements
Limits
1487' South of River Road to 190' South of Jones Avenue
Year
2016
Project Engineer
R. Gibson
Roads Worked
McHenry Ave.
Red Lines
Yes
Federal #
STPL-5929(196), BRLS-5929(166), BRLS-5929(167), CML-5929(247)
Supplemental fields
Classification
As-Builts
Cross Ref
M558 - M778
Type
Corridor Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
j <br />ffog"I <br />41'-9" <br />0- <br />23'-9" Stage 2 Construction 18'-0 3,-0„ 33'-9" <br />Closure Stage 1 Construction <br />RS if M" Line Crown Line Pour See Note 2 Reinf for Conc <br />(RSP <br />Reinf for Conc B1 1-62 Barrier Type 80 8 11 -60 <br />Barrier Type 80SW - -2% -2% 00 <br />a 2 <br />6 2- •. . . . . . . <br />off, <br />C�P6 2 <br />00 <br />-&- -7 1-- - - .1 - - <br />-- -------- - - #10 Cont <br />Tot 4 <br />For distribution Reinf, see #10 Cont -Cast-in-Place Main Slab Reirf $I i <br /># 10 Cont SLAB REINFORCEMENT Tot 4 Reinf Conc Slab 3/4 11 Drip <br />Tot 4 Deck Drain, Typ DETAIL NO. 1 " sheet Note: Groove, Typ <br />Piles, conc barrier, and sidewalk 6 " <br />see Note 1 not shown for clarity. CVIN FAO 4"0 Conduit, Ty p <br />SLAB SECT�,ON SPANS 13-21, see Note 3 <br />Frame 3 = Bent 13 thru Bent 22 <br />Frame 3 Bent 13 thru � Bent 22 <br />8 @ 39'-0" (Spars 13 thru 20) 31 '-60' (Span 21 ) <br />Bent 15 thru q Bent <br />Bent 13 & Exp Jt Bent 14 Span Bent 21 Span Bent 22- <br />Edge of #9x20'-0"-- #9x14'-0" -#9x27 -0 #9x15'-0" #9 Cont & E_ X P t <br />#110 Cont #9 Cort- #qx31,-O_j Edge of <br />Typ #9x27'-O" # 10 Cont <br />Slob, Typ <br />Slob, <br />� - -_ I I � t i i <br />� N # <br />> <br />V/1 <br />10'-0" 10'-0" 7'- 0 7'- 6 <br />0- v' SPAN 21 <br />SPAN 13 13'-- 6 '171-611 13'1 3'-6 <br />- 6 <br />REINFORCEMENT PLAN -TOP OF SLAB Frame 3 Bent 13 thru Ben' 22 <br />1 /4 1'-0 all - <br />CD Frame 3 = Bent 3 thru Bent 22 31 -6" (Span 21 <br />041 111-10M.- > � Bent 22 <br />8 @ 39'-0" (Spars 13 thru 20) NO CHANGES Bent 21 Span <br />014 - #9 Cont # 9 Exp Jt <br />Bent 13 & Exp Jt Span <br />McHemy Ave Coftw Wfameortark Mood Splice with. #9- 'at ends <br />#9 Date Acwrftd Span -#7x26'-O Splice with #9 Cont- <br />-#9x35-6" Bent 14 Span a n AS -BUILT i I <br />E Splice with #9 Cont - I Edge of <br />---#9 Cont Rewent Engineer - Mourtao Rkwa, P.E. #7x23'-O" #8x35'-O" #10 Cont #7x2l'-O" <br />Edge of Strudure RepmegntetWe � DeWd Fnvm, P.E. Slab, Typ <br />01 a Slab, Typ #9x27'-O" #10 Cont Splice with #7x23'-O" Revisionsay ;)rPP%A;(C j.11.2WI <br />3.1 Q0 #8x35'-O" #9i <br />_1P i at ends <br />C14 <br />III i t - _� t <br />i I t --# i ° -- I t <br />t +II <br />� -- t t i I � � <br />_0 <br />M <br />Q) > <br />4-1 <br />V\ 4'- 0 <br />Ln 11-6 <br />301- <br />r-li7'_ 0 <br />< I-W <br />0 17'-- 6 SPAN 21 <br />1__� s> 10)-Of) <br />2!1 SPAN 13 17 f 6)j <br />c- <br />C) NOTES: <br />1 For Deck Drain details, see "DECK DRAINAGE DETAILS - SPANS 121 sheet. <br />00 <br />C14 <br />NOTE: <br />THE CONTRACTOR SHALL VERIFY ALL CONTROLLING FIELD REINFORCEMENT PLAN -BOTTOM OF SLAB 2. For Closure Pour Details, see 'SLAB REINFORCEMENT DETAILS NO. 1 sheet. <br />Q <br />0 DIMENSIONS BEFORE ORDERING OR FABRICATING ANY MATERIAL. 1/4" = 11-07? <br />3. For CVIN F/O Conduit details, see "GIRDER DETAILS NO. 2" sheet. <br />SURVEY REVISION DESCRIPTION BY DATE SCALE PREPARED BY DATE <br />SAN JOAQUIN COUNTY PUBLIC WORKS DRAWING <br />o DATUM: F <br />HORIZONTAL: H. SULLIVAN 09-29-16 ��I 2.S-132 <br />DRAWN: m <br />VERTICAL: <br />o N. CALDERONE 09-29-16 ORIN A. BROWN <br />0- 0 DESIGNED: OF <br />rn <br />0 > 0 1 2 AECOM Technical Services, Inc. McHENRY AVE CORRIDOR IMPROVEMENTS LU C48859 rn <br />0 = 0: No ;V <br />-7) :3 A I CHECKED: Z. ABAJIAN 09 — 29 —1 ro 2020 L Street, SLHte 300• Exp. 0930-18 S-153 <br />'A 95814 (n INCHES Sacramento, C <br />C I V I L <br />C_ A T 916.414,5800 F 91�.414.1557 McHENRY AVE BRIDGE OVER STANISLAUS RIVER (REPLACE) <br />0 0 10 20 30 40 50 APPROVED: 0. BROWN 09-29-16 L\j rj SHEET <br />CIO I I I I I OF CAj.\1 <br />0 n FILE No. MILLIMETERS SLAB LAYOUT AND SECTION NO. 3 — SPANS 13-21 136 c)F-176 <br />
The URL can be used to link to this page
Your browser does not support the video tag.