My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
M590 - M778
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer M
>
M558 - M
>
M590 - M778
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 9:36:09 AM
Creation date
4/25/2025 9:47:25 AM
Metadata
Fields
Template:
Large Plans - LP
Project
McHenry Avenue Corridor Improvements
Limits
1487' South of River Road to 190' South of Jones Avenue
Year
2016
Project Engineer
R. Gibson
Roads Worked
McHenry Ave.
Red Lines
Yes
Federal #
STPL-5929(196), BRLS-5929(166), BRLS-5929(167), CML-5929(247)
Supplemental fields
Classification
As-Builts
Cross Ref
M558 - M778
Type
Corridor Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
E <br />ca_ <br />0 <br />CN <br />cr; <br />CN <br />ca. <br />0 <br />0 <br />6 <br />E <br />0) <br />06 <br />M <br />N <br />40+00 <br />� Bent 22 e q Bent 23 q Bent 24 - <br />q Girde: s <br />-[1 J2 Ty p <br />Transverse Deck Utilities opening 7 1 <br />Reinf Typ - at Bents, Typ tk "�_ <br />OA =-41111 FA - <br />7,'2 4 <br />OB <br />0 d- 00 18' 0 42+00 [1: 8: <br />ti-8i <br />0 <br />0 <br />i 12=Typ i 24 <br />0 <br />18 18 <br />11 12 <br />0 <br />i ° - - (J -- __ ___ 18 <br />rH <br />Bent 25 <br />Soffit vent,Typ <br />Detail 1, <br />Edge of deck see Note 4 <br />0 18 M"\Line <br />IA.--4+00 <br />18 <br />0 <br />E18 18 <br />0 0 <br />°\ ° 18 18 <br />\0 18 <br />0 0 <br />----------- -:24 <br />18 - 16 $_00f 20'-01' 20'-0" 16'-0" E12 J-/ D18 <br />12 Ty 12 <br />/G i rd p Edge of deck Girder Girder Girder ('girder Typ <br />'-0" Girder Flare, Typ Flare Flare Outside face Flare Flare 16'-0" <br />, OB7_1 of girder GirdJ <br />S_, Flare <br />or/��_05 �O5 <br />Limits of transverse deck Reirf C51 0 1\5__11 <br />PLAN,/B-os (B7 <br />U- , <br />Ll L2 L3 <br />Dent 22 Bent 23 Bent 24 Bent 25 <br />Point of theoretical <br />no movement for <br />right end stressing <br />Q0 <br />CV <br />+1 <br />3 <br />0.4 L 1 <br />30- <br />1'-3 1/21' <br />Cif <br />#5 U or stirrup spacing 90 @ 4 @ 12 Max <br />Cn exterior girders <br />D <br />Cn <br />Center of gravity <br />of prestressing force- <br />0. 5 L2 <br />01 Mo.- <br />3'- 9 " 0.1 L110.1 L2_ <br />3,-4„ 3'-2 5/8" <br />3" <br />48 @ 5 <br />48 @ 5 <br />I go- <br />bundled <br />--d! Ift- <br />bundled <br />20 @ 6 <br />20 @ 6 <br />C) I <br />< 5 U or _J stirrup spacing 90 @ 4 @ 12 Max 60 @ 6 60 @ 6 <br />interior girders <br />C_ <br />0 <br />r <br />00 <br />C%4 <br />N NOTE: <br />r__ <br />Nt THE CONTRACTOR SHALL VERIFY ALL CONTROLLING FIELD <br />CD <br />0 DIMENSIONS BEFORE ORDERING OR FABRICATING ANY MATERIAL. <br />SURVEY REVISION DESCRIPTION <br />D <br />0 DATUM: <br />C: <br />C_ <br />0 <br />0 <br />Cn <br />0 FILE No. <br />__J <br />-0 <br />Inflection point, Typ <br />\ 3,-9„ <br />--a <br />0.1 L210.1 L3 <br />3'-2 5/8" <br />@ 12 Max <br />@ 12 Max <br />0.6 1-3 <br />Cable path is <br />parabolic <br />3'--4between points <br />[ k / \ A I rn <br />48 @ 5 48 @ 5 <br />IL 10- ---a I <br />bundled bundled <br />-- 20 @ 6 20 @ 6 <br />60 @ 6 <br />30__ <br />LONGITUDINAL SECTION <br />No Scale <br />BY DATE SCALE PREPARED BY <br />HORIZONTAL: DRAWN: H. SULLIVAN <br />VERTICAL: DESIGNED: J. FREKING <br />0 2 <br />1 1 INC I INCHES I CHECKED: Z. ABAJIAN <br />0 10 20 30 40 50 APPROVED: 0. BROWN <br />MILLIMETERS <br />V-3 1/2" <br />3 <br />@ 12 Max 90 @ 4 <br />UK NO-01 0- <br />60 @ 6 @ 12 Max 90 @ 4- <br />--a a W.- <br />DATE <br />09-29-16 <br />AAECOM <br />09-29-16 <br />AECOM Technical Services, Inc. <br />09--29-16 <br />2020 L Street, Suite 300 <br />Sacramento, CA 95811 <br />09-29-16 <br />T 916.414.5800 F 916.414.1557 <br />PRESTRESSING NOTES: <br />270 KSI low relaxation strands: <br />Pjack = 13,600 kips <br />Anchor set = 3/8 in <br />Total number of girders = 8 <br />Distribution of final prestress force <br />(Pjack) between girders shall not <br />exceed the ratio of 3:2 or 725 kips <br />whichever is less. <br />Concrete f'c = 4,000 psi at 28 days <br />f'ci = 3,600 psi at time of stressing <br />Contractor shall submit elongation calculations based on <br />initial stress at M = 0.828 times jacking stress <br />Stressing shall be performed from right end (Bent 25). <br />Friction curvature (u) and wobble (k) coefficients are <br />0.15 and 0.0002/ft, respectively. <br />For prestressing details not shown, see <br />FALSEWORK RELEASE NOTES: <br />Alternative 1: <br />Falsework shall be released as soon as permitted by the <br />specifications. Closure pour shall not be placed sooner than 60 days <br />after the Falsework has been released. <br />Alternative 2: <br />Falsework shall not be released less than 28 days after the lost <br />concrete has been placed. Closure pour shall not be placed sooner <br />than 14 days after the falsework has been released. When Falsework <br />Release Alternative 2 is used, camber values are 0.75 times those <br />shown. <br />NO CHANGES <br />McHenry Ave ConWw knproveffeet PmOd <br />Date Accepted <br />AS -BUILT <br />Rewdert Engineer - Mourldo RrArs, P E. <br />Struca" Represordave - DwId Franco. P.E. <br />9Aviejons By D I,'W ? 0 June 8, 2021 <br />LEGEND: <br />r8 7 -'31� <br />Indicates Girder flare width in inches <br />CN �S—) <br />Indicates Girder designation <br />o Indicates Soffit access opening 14-5 <br />NOTES: <br />1. <br />For <br />Location of utility openings, see "TYPICAL SECTION - BOX GIRDER - <br />SPANS 22-24" sheet. <br />2. <br />The <br />transverse reinforcement <br />spacing shown on the "TYPICAL SECTION - <br />BOX <br />GIRDER - SPANS 22-24" <br />sheet is measured along the station line. <br />3. <br />For <br />concrete strength and <br />type limits, see "GENERAL NOTES" sheet. <br />4. <br />For <br />Detail 1, see "GIRDER <br />DETAILS NO, 1" sheet. <br />5. <br />For <br />End Diaphragm Details <br />and Camber Diagram, see "GIRDER DETAILS NO. <br />3" sheet. <br />SAN JOAQUIN COUNTY PUBLIC WORKS <br />ORIN A. BROWN <br />McHENRY AVE CORRIDOR IMPROVEMENTS No. C48859 <br />it Exp. 09-30-18 <br />McHENRY AVE BRIDGE OVER STANISLAUS RIVER (REPLACE) CIVIL <br />OF CAL�� <br />P, L\� <br />GIRDER LAYOUT — SPANS 22-24 <br />DRAWING <br />S-138 <br />OF <br />S-153 <br />SHEET <br />142oF 176 <br />
The URL can be used to link to this page
Your browser does not support the video tag.