My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
M590 - M778
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer M
>
M558 - M
>
M590 - M778
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 9:36:09 AM
Creation date
4/25/2025 9:47:25 AM
Metadata
Fields
Template:
Large Plans - LP
Project
McHenry Avenue Corridor Improvements
Limits
1487' South of River Road to 190' South of Jones Avenue
Year
2016
Project Engineer
R. Gibson
Roads Worked
McHenry Ave.
Red Lines
Yes
Federal #
STPL-5929(196), BRLS-5929(166), BRLS-5929(167), CML-5929(247)
Supplemental fields
Classification
As-Builts
Cross Ref
M558 - M778
Type
Corridor Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
cV 5 1/2" <br />Rail Cap 11 <br />1 1 /4" 2 1 /2 1 3/4" To <br />� 1 1 / 16 "0 X �---�� <br />7/8" Short slotted - <br />hole, Typ <br />/`-Rail Cap <br />---- - CD 1�J1 1 1 <br />PAIL END BASE T_ DETAIL <br />5" <br />III � I I <br />II II <br />II II <br />II II <br />- -1-f - -�LI-. -i <br />III <br />� II <br />I 3/8" Rail end base <br />r r [-4I i Rr <br />see Detail <br />N - i II l i l 1 -�• <br />r II <br />3/8" X8 1 /4"XO' -10" <br />8 1 /4" <br />E SECTION E—�E <br />to 3» = 1'_0„ <br />N <br />I 1 1/20' <br />T <br />N <br />I 3/8"X3"XO'-8" <br />/16" 0 Hole, <br />t 2 <br />I I <br />/2„ 5„ 1 1 /2r, <br />� <br />- --- -s <br />8» <br />-- TS 4X2XO.1875 <br />3/8 EWASHER Rail Cap —� <br />// /TT/ <br />r <br />-I-- — I— — — — — <br />I I <br />I I 3/8" 0 Vent hole <br />Typ <br />l l V <br />I ti l <br />1 1/2' 0 Std pipe AV, Ty <br />I I intermediate rail, I I <br />I I continuous through post, _ _ _ _ _�i _ _ = F - _ - - - <br />I I in 2"0 hole, Typ <br />1 1 I <br />I TS 3X2XO.1875 I I I 3/8"0 Vent <br />%I I hole, Typ <br />1" 1 <br />-- I Typ <br />SECTION ELEVATION <br />PAIL CONNECTION DETAILS <br />6„ - 1 r_Grr <br />YP <br />C14 r/ I ,� �eol weld, Typ <br />0 <br />N ® _ <br />Z_Cn " <br />E <br />11/16 0 X 7/8 <br />short slotted hole, <br />r- Tot 4 <br />0) <br />-i - - <br />m WT 10.5x31 - <br />r <br />C_ N <br />can � I \ <br />D 1 5/8" 5» <br />< 6D <br />(!7 <br />o <br />0 <br />DETAIL 3 <br />3rr = 1,-(fir, <br />00l <br />N NOTE: <br />rl- <br />THE CONTRACTOR SHALL VERIFY ALL CONTROLLING FIELD <br />CD <br />o DIMENSIONS BEFORE ORDERING OR FABRICATING ANY MATERIAL. <br />� 5/80 X 0'-3" Bolt 10" <br />with hex nut, washers �- <br />and approved thread <br />locking system in <br />1 1/ 16" 0 hole, Tot 2 AA <br /><Ty <br />P <br />Concrete barrier I <br />I <br />I I 3/8" Top <br />n1i <br />n ILJ II I � <br />�I I TYP <br />3/8" FP_ Washer, <br />Tot 2, see Detail rn <br />5/8" 0 X 0'-9" Bolts with u <br />hex nuts, washers and r <br />approved thread locking <br />system Tot 4, Typ WT 10.5x31 <br />8„ <br />SECTION D—D <br />3" = 1,_G„ <br />Tube or pipe rail <Typ <br />6 0' <br />-- Sleeve formed of 3/16" <br />WELDED SPLICE bent for sliding fit inside <br />of rail tube <br />6„ 6 — 3 3/4" - <br />V N <br />— — — — L --� = � _ _— <br />I <br />1 /2» Min or match deck joint <br />TUBE SPLICE <br />V -- 1 3/8"0 Bar sleeve for 1 <br />_ - - 1 /2"0 Std pipe, <br />1 13/16" Bar sleeve for <br />I 2"0 Std pipe <br />1 /2" Min or match deck joint <br />PIPE SPLICE <br />PAIL SPLICE DETAILS <br />3,r — i r—®» <br />I <br />NO CHANGES <br />M&*n Ave canlaor MWovsmw Pro d <br />0" Orr F. d <br />AS -BUILT <br />R"Ww t Engi m - Ma rbo R1ww. P.E. <br />Sftch" RWGWft Iw - D" Fwm, P E. <br />Rewarons ay ^x c draw & Tart <br />NOTES.- <br />1 . Galvanize rail assembly after fabrication. <br />2. Post shall be normal to railing. <br />3. Rail tubes shall be shop bent or fabricated to fit horizontal curve when <br />radius is less than 985 ft. <br />4. Tube splices shall be located in the tubes spanning deck or wall joints. <br />Increase joint width in tubes to match expansion joint width and <br />increase sleeve length correspondingly. <br />5. Top and intermediate rail tubes or pipes shall be continuous over not <br />less than two posts except a short post spacing is permitted near <br />deck or wall joints, electroliers, or other rail discontinuities as notes. <br />SURVEY REVISION DESCRIPTION BY DATE SCALE PREPARED BY DATE SAN J®AC?U I N COUNTY PUBLIC WORKS DRAWING <br />o DATUM: 4 . c �. <br />3 HORIZONTAL: DRAWN: H. SULLIVAN 09-29-16 AECOMZ S-146 <br />(� _ c VERTICAL: 7- ,1 ORIN A. BROWN i <br />DESIGNED: J. FREKING 09-29-16 AECOM Technical Services, Inc. N: McHENRY IW ran, c4885s rn <br />Ex . 09-3( S —15 3 <br />_ 0 1 2 i �, � : rr <br />I I I I I CHECKED: N. CALDERONE 09-29-16 2U2U L Street, Suite 30U �. ,� <br />INCHES Sacramento, CA95s11 McHENRY AVE BRIDGE OVER STANISLAUS RIVER (REPLACE) �� CIVI <br />0 10 20 30 40 50 0. BROWN 09-29-16 T 916.414.58U0 F 916-414.1557 �,� \P �r�aF c�L\�o�`� SHEET <br />APPROVED: <br />�C3 FILE No. — _ _ < < F R 1 of 1 76 <br />I I I I I <br />METAL BICYCLE RAILING DETAILS NO. 2 50 <br />MILOMETERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.