My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
M590 - M778
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer M
>
M558 - M
>
M590 - M778
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 9:36:09 AM
Creation date
4/25/2025 9:47:25 AM
Metadata
Fields
Template:
Large Plans - LP
Project
McHenry Avenue Corridor Improvements
Limits
1487' South of River Road to 190' South of Jones Avenue
Year
2016
Project Engineer
R. Gibson
Roads Worked
McHenry Ave.
Red Lines
Yes
Federal #
STPL-5929(196), BRLS-5929(166), BRLS-5929(167), CML-5929(247)
Supplemental fields
Classification
As-Builts
Cross Ref
M558 - M778
Type
Corridor Improvements
Document Relationships
River Road
(Message)
Path:
\VAULT MAPS\*CARD CATALOG*\RA - RN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NE <br />0- <br />O <br />0 <br />0 <br />C14 <br />06 <br />C'4 <br />C_ <br />CU <br />Cn <br />c- <br />c <br />X <br />Q) <br />Location <br />Ln <br />7-11 <br />N <br />PILE DATA TABLE <br />Pile Design Nominal Resistance (kips) Specified <br />Type Loading Compression Tension Tut —off <br />(kips) Elev. (ft) <br />L <br />Ln Culvert 24" CIDH 114.75 <br />Outlet <br />0 <br />0 <br />< Design tip elevation is controlled by the following demands: <br />(1) Compression, (2) Tension, (3) Lateral. <br />C: <br />Allowable Bearing q <br />all = 3.0 ksf <br />Pressure: <br />00 <br />C114 <br />CN <br />NOTE: <br />rl- <br />114- <br />THE CONTRACTOR SHALL <br />VERIFY ALL CONTROLLING FIELD <br />0 <br />DIMENSIONS BEFORE <br />ORDERING OR FABRICATING ANY MATERIAL. <br />-1 C: <br />SURVEY <br />REVISION DESCRIPTION <br />v <br />DATUM: <br />c- <br />C) <br />6N <br />C <br />C; <br />0 <br />va <br />A <br />Cn <br />FILE No. <br />R W: <br />Design Ti Specified Tip <br />Elev. (ftf Elev. (ft) <br />69.75 69.75 (3) <br />McHeirn,%%% C*MWW Wipironnient Prajsot <br />Date Accepted , <br />AS -BUILT <br />Resident En*w - Mounclo Rivers, P.E. <br />Struckim FeiWaswoon - DwM Franco, P.E. <br />Revision By V, MN4(L- Jwa 8, 2W <br />LEGEND <br />Eq -- Indicates Bottom of footing <br />0— Indicates 24" CIDH Piling <br />BY DATE SCALE PREPARED BY <br />HORIZONTAL- DRAWN. H. SULLIVAN <br />VERTICAL: <br />DESIGNED: J. FREKING <br />0 1 2 <br />1 1 INC I INCHES I I CHECKED: A. SELLADURAI <br />0 10 20 30 40 50 APPROVED: 0. BROWN <br />MILLIMETERS <br />V <br />Concret' B a rriie <br />(Type 80 Mod <br />PP "Oncri I tl'n to <br />Lo <br />+ <br />i <br />C <br />0 <br />0- <br />i2 <br />0 <br />F- <br />Remove Exist <br />Chain Link Fence, <br />see "Road Plans" <br />to Roo 16+18.40± <br />1 1.8'± Rt <br />:)Ie Box Culvert <br />rt Extension <br />PLAN <br />1 to = 5' <br />R /W <br />• Pmn\/p F)eic-f KA (,P <br />see "Road Plans" <br />R 16+40.98, 30.75' Rt <br />,.Elev at top of Headwall 115.42' it � <br />End Headwall and Conc Barrier (Type 80A) <br />Begin Conc Barrier (Type 80 Mod), see F rbad Plan <br />Conc orn, <br />1105.92' <br />r <br />In <br />Pi <br />Cn <br />----------- <br />"N <br />00 <br />S 34042'48.9 $1 E <br />I it I <br />110"o- <br />- - — — — — — — — — — — — — — — — --- - <br />J U, <br />1106.117' <br />11 05.92' <br />POR" I r- <br />Elev a <br />Begin Headwall and Conc Barrier (Tyke 8 A) <br />Point <br />Northing <br />Easting <br />Devotion <br />Description <br />501 <br />2099928.92 <br />6418186.05 <br />'119.55 <br />KSN control, a 5/8" rebar with a <br />yellow plastic cap marked "KSN CONTROL" located or the <br />west levee of the SSJID canal, or <br />the south end of the north —south canal run, on the west <br />side of McHenry Avenue, north of <br />River Road. <br />55001 <br />2102597.53 <br />6418301.62 <br />120.74 <br />City of Escalon BM10, a brass disk located in the southwest headwall of the SSJID canal on <br />the west side of McHenry Avenue, <br />and the south levee of SSJID canal. <br />55003 <br />2099786.40 <br />6418330.53 <br />'113.52 <br />T 957, a survey benchmark set in <br />the northwest abutment of the bridge over the Stanislaus <br />River, see NGS PID HS22242 for additional <br />information. Note that benchmark is located on <br />west side of the bridge not east as described on the NGS data sheet. <br />Survey Control: <br />Bearings <br />and coordinates <br />are based on the California <br />Coordinate System of 1983 (CCS 83), Zone 3. <br />Elevations are <br />based on <br />the North <br />American Vertical Datum of 1988 <br />(NAVID 88 CGPS). <br />The <br />Unit of measurement <br />is the <br />US Survey Foot, 2007.00 Epoch date <br />adjustment. <br />DATE <br />09-29-16 <br />M <br />09-29-16 <br />AECOM Technical Services, Inc. <br />09-29-16 <br />2020 L Street, Suite 300 <br />Sacramento, CA 95811 <br />09-29-16 <br />T 916,414.5800 F 916.4-14 1557 <br />®Pq UiN.co <br />5 �, <br />.!7-t-7 <br />SAN JOAQUIN COUNTY PUBLIC WORKS <br />F <br />ORIN A, BROVIN <br />McHENRY AVE CORRIDOR IMPROVEMENTSI No. C48859 <br />, 09 <br />L . RIVER RD CULVERT EXTENSION AT SSJID ESCALON SPILLWAY Exp-30-18CIVIL <br />OF C L0, <br />FOUNDATION PLAN <br />DRAWING <br />S-203 <br />0 F <br />S-206 <br />SHEET <br />I 60oF1 76 <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.