My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
M590 - M778
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer M
>
M558 - M
>
M590 - M778
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 9:36:09 AM
Creation date
4/25/2025 9:47:25 AM
Metadata
Fields
Template:
Large Plans - LP
Project
McHenry Avenue Corridor Improvements
Limits
1487' South of River Road to 190' South of Jones Avenue
Year
2016
Project Engineer
R. Gibson
Roads Worked
McHenry Ave.
Red Lines
Yes
Federal #
STPL-5929(196), BRLS-5929(166), BRLS-5929(167), CML-5929(247)
Supplemental fields
Classification
As-Builts
Cross Ref
M558 - M778
Type
Corridor Improvements
Document Relationships
River Road
(Message)
Path:
\VAULT MAPS\*CARD CATALOG*\RA - RN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
E <br />I_ <br />Nt <br />0 <br />I <br />0 <br />CV <br />c <br />N <br />a <br />Exist - <br />Bridge <br />Approx OG <br />00 <br />N NOTE: <br />,I�>0 - Easement <br />R/W <br />Sri i � <br />17 Canal = <br />C�� .0 �`� Culvert \ <br />i <br />poi R /W <br />Exist Bridge <br />1r90 L,119.0 <br />\ E Meyers Ave <br />\ To Modesto` \���+H 73+00 \ <br />`\ To Escalon � � - I ' P L <br />----T-- — — —_ — <br />119.6. \ �1 0� 10 @ 6 , a) <br />\ u Ll \ /� 5'-2" = 65 \ " <br />\ i \ <br />119.0 �° Exist Bridge <br />R W \ Stage 1 R/W <br />/ \ - a -\., •� \ <br />Uonstructlon �-� �� \ '\� <br />TC E �— NN, <br />+I <br />a) <br />o c <br />I <br />J <br />"M" Line <br />I <br />26'-0"± <br />Stage 1 Traffic <br />3'-5" f <br />13@6',1 @ `� <br />5'-211 83'-211 °\ N <br />STAGE 1 PLAN <br />1" = 20' <br />l- <br />"M" Line <br />I <br />I Beain Staae 1 Conc PC <br />1 <br />I <br />PC Boyd Culvert <br />End Stage 1 I <br />PC Box Culvert <br />5,-0„± 1 <br />I <br />Min See "DETAIL 1 Top of PC <br />I Box Culvert FG� <br />I <br />I <br />I <br />--------+------------------_ ---_ <br />X x x x x X k X x X X i� X -- X X 1-V <br />!'I) ri'l T1,11 I) <br />rixi <br />I <br />r1`i "It]-11 r Orixifi,10�1�rlxilri �111 <br />I <br />hCx1l'i�, I , F.._-IC lr CVli, <br />THE CONTRACTOR SHALL VERIFY ALL CONTROLLING FIELD <br />0 <br />CD DIMENSIONS BEFORE ORDERING OR FABRICATING ANY MATERIAL.. <br />SURVEY REVISION DESCRIPTION <br />o DATUM: <br />U <br />p D C <br />O 0 <br />a > <br />O <br />cn <br />c <br />a <br />0 FILE No. _ <br />REVISE SEGMENTS - SUBMITTAL 82 <br />REVISE FOUNDATION LAYER - CCO 11 <br />STAGE 1 i SECTION A --A <br />1 " = 10' <br />BY DATE SCALE PREPARED BY <br />HORIZONTAL: DRAWN: H. SULLIVAN <br />VERTICAL: <br />DESIGNED: N. CALDERONE <br />DF 10/201 / 1 s I I I CHECKED: A. SELLADURAI <br />DF 11/2017 INCHEs <br />I 11 210 30 4I 510 APPROVED: 0. BROWN <br />MILLIMETERS <br />)le Yp <br />, Railing T B11-47'� <br />Top of Flared <br />Wingwall <br />Stage 2 <br />Construction <br />External Sealing <br />Band, See Note 2 <br />Stage 1 <br />Construction <br />5'-0" <br />Wrap Subgrade <br />Enhancement <br />Geotextile <br />Geotex-I <br />End of PC Box Fabric <br />Segment Stage 1 <br />(Tongue End), <br />See Note 1 <br />McHenry Ave Corridor Improvement Project <br />AS -BUILT <br />Resident Engineer - Mauricio Rivera, P.E. <br />Structure Representative - David Franco, P.E. <br />Revisions By9/28/2021 <br />CONSTRUCTION OBSERVATION: PERCHED GROUNDWATER UNDER <br />CLAY CAP JUST BENEATH SAND SLURRY LAYER <br />DATE <br />09-29-16 <br />�%Cwom <br />09-29-16 <br />AECOM Technical Services, Inc. <br />09-29-16 <br />2020 L Street, Suite 300 <br />Sacramento, CA 95811 <br />09-29-16 <br />T 916,414.5800 F 916A14.1557 <br />8" Asphalt <br />See <br />Class 2 Agg "Road Plans" <br />Base, Varies <br />PC Box <br />DETAIL 1 <br />3/4" - 1 <br />NOTES: <br />1. For PC Box Joint Details, see "PRECAST <br />REINFORCED CONCRETE BOX CULVERT" sheet. <br />2. For External Sealing Band Details, see "PRECAST <br />REINFORCED CONCRETE BOX CULVERT" sheet. <br />3. For Stage 2 Traffic, see "STAGE 2 CONSTRUCTION <br />PLAN" sheet. <br />4. For TCE limits, see "ROAD PLANS" sheet. <br />y . EGEN D: <br />Recorrlp„r:ted Native Soil <br />(90% Relative Compaction) <br />70—SS 2 Ayyl cyutC Bcse <br />Stage 1 Construction <br />18" 3-sack Sand Slurry <br />SAN JOAQUIN COUNTY PUBLIC WORKS <br />N1 HENRY AVE C R0 RIDOR IMPROVEMENTS —m GRIN AC-51. BROWN m <br />No. C48859 z <br />�c Exp.09-30-18 <br />McHENRY AVE BRIDGE OVER SSJID MAIN CANAL (REPLACE) sr CIVIL <br />9lF <br />STAGE 1 CONSTRUCTION PLAN <br />DRAWING <br />S- 303 <br />OF <br />S-313 <br />SHEET <br />11660F176 <br />
The URL can be used to link to this page
Your browser does not support the video tag.