My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
M590 - M778
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer M
>
M558 - M
>
M590 - M778
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 9:36:09 AM
Creation date
4/25/2025 9:47:25 AM
Metadata
Fields
Template:
Large Plans - LP
Project
McHenry Avenue Corridor Improvements
Limits
1487' South of River Road to 190' South of Jones Avenue
Year
2016
Project Engineer
R. Gibson
Roads Worked
McHenry Ave.
Red Lines
Yes
Federal #
STPL-5929(196), BRLS-5929(166), BRLS-5929(167), CML-5929(247)
Supplemental fields
Classification
As-Builts
Cross Ref
M558 - M778
Type
Corridor Improvements
Document Relationships
River Road
(Message)
Path:
\VAULT MAPS\*CARD CATALOG*\RA - RN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Q. <br />Q0 <br />00 <br />0 <br />I <br />0 <br />N <br />06' <br />(N <br />V) <br />N <br />E <br />f-= <br />3 <br />0 <br />Cn <br />4 <br />a� <br />c� <br />X <br />0 <br />m <br />c- <br />4.- <br />U <br />Cn <br />0 <br />Q <br />U <br />L, <br />U <br />0I <br />N <br />i <br />See "DOWEL <br />LOCATION DETAIL" <br />ro 0 0 0 fl <br />A A R A P A A <br />72+00, <br />EXTEND BARRIER RAIL ` <br />"M" Line 72+32.59 <br />E lev 120.26 <br />0 <br />dedddd <br />MGS, see Note 3, Typ A <br />Conc Barrier Type 80 <br />(Mod), supported on <br />Barrier Plinth, Typ <br />PC Box Culvert <br />a <br />73+00 <br />PLAN <br />1" = 20' <br />4'-0" <br />Barrier LOL <br />(Gutter line) <br />#6 _E] @ 8'- <br />#5 Cont Tot 4 L__ <br />See "DOWEL <br />LOCATION DETAIL" <br />Conc Barrier <br />Type 80 (Mod) g11-60 <br />Modified as J <br />Shown <br />'U) <br />Barrier FG �C) •` a) <br />� Plinth 1 —0 0 <br />Cn FG oo � <br />PC Box <br />Roof I '/ <br />PC RCB <br />Culvert Reinf, <br />see Note 2 <br />I ' <br />C0 <br />o .� <br />I <br />• #6 > Drill & Bond <br />Dowel in 6" Min <br />#6 © 8 deep hole, Typ <br />#8 Cont Tot 2 <br />#6 Cont Tot 4 <br />SLCT�ON —A <br />3/4" = 1'-0" <br />N NOTE: <br />� THE CONTRACTOR SHALL VERIFY ALL CONTROLLING FIELD <br />0 <br />DIMENSIONS BEFORE ORDERING OR FABRICATING ANY MATERIAL. <br />i <br />SURVEY REVISION DESCRIPTION <br />r� o DATUM: <br />v <br />—S) C: s= <br />0. <br />D D _� EXTEND BARRIER PAST SKEWED BOX <br />U) <br />C <br />o E <br />j .� <br />0 FILE No. <br />CL _1 <br />i <br />0 .I <br />I <br />= r <br />I— <br />z <br />O n <br />I ry <br />LJ <br />tz <br />Q <br />m o <br />I <br />r II <br />McHenry Ave Corridor Improvement Project <br />AS -BUILT <br />Resident Engineer - Mauricio Rivera, P.E. <br />Structure Representative - David Franco, P.E. <br />Revisions By `f 9/28/2021 <br />BY DATE SCALE PREPARED BY <br />HORIZONTAL: DRAWN: H. SULLIVAN <br />VERTICAL: <br />DESIGNED: 0. BROWN <br />0 1 2 <br />DF/T►_:' 8/22/16 1 e I I I CHECKED: A. SELLADURAI <br />INCHES <br />110 2' 3' 40 510 APPROVED: 0. BROWN <br />MILLIMETERS <br />4" Min from side <br />of PC Box, Typ— <br />/ <br />/ <br />DATE FQ UlN <br />A=COM <br />09-29-16 <br />2' <br />09-29-16 Q. <br />AECOM Technical Services, Inc. <br />09-29-1 6 2020 L Street, Suite 300 <br />Sacramento, CA 95811 <br />09-29-16 T 916.414.5800 F 916.414.155 <br />3" Gap between <br />PC Boxes <br />8" Min from <br />PC Box joint, Typ <br />L^ll.l I I -AI _ l_'JI11 I <br />band, Typ <br />NOTES: <br />1. For barrier rail reinforcement not shown, see <br />Standard Plan B1 1 —60 <br />2. For PC RCB Culvert, see "PRECAST <br />REINFORCED CONCRETE BOX CULVERT" sheet. <br />3. For MGS details and connections to barrier <br />rail, See Road Plans. <br />4. Construct West barrier with MBGR during <br />Stage 2 traffic. <br />5. Construct East barrier with MBGR after Stage <br />2 when traffic is in Interim configuration. <br />_ 4 Dowels per row <br />per PC Box segment <br />PC Reinf Conc <br />Box Culvert, Typ <br />(48" segment) <br />DOWEL LOCATION DETAIL <br />3/4" = 1'-0" <br />Note: Left side shown, right side similar. <br />12" Max_ within <br />PC Box segment <br />/ <br />#6 Drill & Bond <br />Dowel in 6" Min <br />deep hole, Typ <br />`_ <br />SAN JOAQUIN COUNTY PUBLIC WORKS <br />F <br />McHENRY AVE CORRIDOR IMPROVEMENTS W GRIN A. BROWN z <br />,Y No C48859 rn <br />McHENRY AVE BRIDGE OVER SSJID MAIN CANAL (REPLACE) EXPCIVI -18 <br />`s'� CIVIL <br />Q <br />qF OF CA`\Eo�� <br />CONCRETE BARRIER DETAILS <br />DRAWING <br />S-310 <br />CO F- <br />S-313 <br />SHEET <br />117,30F176 <br />
The URL can be used to link to this page
Your browser does not support the video tag.